This would reduce the cost of inventory space, management, and insurance (it would also result in customers receiving fresher products where this is a factor). Furthermore, in applications where certificates of analysis are required prior to shipping or acceptance, time saved may translate into material holding and/or labor savings (e. g., for truck driver s or tanker crew s idle time awaiting authorization to depart). [Pg.11]

The engineer also will recognize that various systems are germane to the format development and site selection subprocess. These systems include the customer database, space management, property development and construction, market research, project appraisal, and contract management systems. [Pg.55]

Bartholdi, J., and Platzman, L. (1988), Heuristics Based on Spacefilling Curves for Combinatorial Problems in Euclidean Space, Management Science, Vol. 34, pp. 291-305. [Pg.822]

G. A. Rummlei and A. P. Biache, Improving Peformance How to Manage the White Space on the Organisation Chart, ]ossey-B>2LSs, San Eiancisco, Calif., 1990, p. 19. [Pg.136]

The installed capit investment is about 375 per pallet for a 5000-paUet system. A characteristic of drive-in, drive-through, and flow racks is that, at any one point in time, only one product can occupy a given storage lane. Products are not mixed because of the complications that this practice presents in inventoiy management. In any event, there is seldom any need to mix products in the chemical industry because products are made in lots, blends, etc., and a storage lane is ordinarily designed to accommodate either a complete lot or some fraction of a lot. The result is that the total storage space available rarely is completely used. This is a problem that aisle racks... [Pg.1980]

Chemoinformatics (or cheminformatics) deals with the storage, retrieval, and analysis of chemical and biological data. Specifically, it involves the development and application of software systems for the management of combinatorial chemical projects, rational design of chemical libraries, and analysis of the obtained chemical and biological data. The major research topics of chemoinformatics involve QSAR and diversity analysis. The researchers should address several important issues. First, chemical structures should be characterized by calculable molecular descriptors that provide quantitative representation of chemical structures. Second, special measures should be developed on the basis of these descriptors in order to quantify structural similarities between pairs of molecules. Finally, adequate computational methods should be established for the efficient sampling of the huge combinatorial structural space of chemical libraries. [Pg.363]

Applied Sciences, Inc. has, in the past few years, used the fixed catalyst fiber to fabricate and analyze VGCF-reinforced composites which could be candidate materials for thermal management substrates in high density, high power electronic devices and space power system radiator fins and high performance applications such as plasma facing components in experimental nuclear fusion reactors. These composites include carbon/carbon (CC) composites, polymer matrix composites, and metal matrix composites (MMC). Measurements have been made of thermal conductivity, coefficient of thermal expansion (CTE), tensile strength, and tensile modulus. Representative results are described below. [Pg.147]

Overcrowding issues should be noted. Future occupant density is estimated when the ventilation system for a building is designed. When the actual number of occupants approaches or exceeds this occupant design capacity, managers may find that lAQ complaints increase. At that point, the outdoor air ventilation rate will have to be increased. However, the ventilation and cooling systems may not have sufficient capacity to handle the increased loads from the current use of the space. [Pg.204]

Layout considerations include avoiding crane lifts over operating equipment, especially equipment that contains hazardous materials, and, in particular, hazardous materials held under pressure or high temperature. Allow space for maintenance access without damage to other equipment. Apply risk management concepts to the layout and siting. [Pg.85]

Contract employees must perform their work safely. Considering that contractors often perform very specialized and potentially hazardous tasks, such as confined space entry activities and nonroutine repair activities, their work must be controlled while they are on or near a process covered by PSM. A permit system or work authorization system for these activities is helpful for all affected employers. The use of a work authorization system keeps an employer informed of contract employee activities. Thus, the employer has better coordination and more management control over the work being performed in the process area. [Pg.237]

The hazards of management-controlled nonroutine work in the process areas must be communicated to affected individuals. The work permit prescribes the procedures that must be followed to get the permit. Work authorization procedures specify lockout/tagout, line breaking., confined space entry, and hot work authorization through clear steps leading to job completion, closure, and return to normal. [Pg.73]

Inventory management is concerned with maintaining economic order quantities so that you order neither too much stock nor too little to meet your commitments. The stock level is dependent upon what it costs both in capital and in space needed to maintain such levels. Even if you employ a ship-to-line principle, you still need to determine the economic order quantities. Some items have a higher value than others, thereby requiring a higher degree of control. Use of the Pareto principle will probably reveal that 20%... [Pg.479]

A company s culture can make or break even a well-designed data collection system. Essential requirements are minimal use of blame, freedom from fear of reprisals, and feedback which indicates that the information being generated is being used to make changes that will be beneficial to everybody. All three factors are vital for the success of a data collection system and are all, to a certain extent, under the control of management. To illustrate the effect of the absence of such factors, here is an extract from the report into the Challenger space shuttle disaster ... [Pg.259]


See other pages where Space, management is mentioned: [Pg.583]    [Pg.69]    [Pg.317]    [Pg.2171]    [Pg.2857]    [Pg.217]    [Pg.213]    [Pg.846]    [Pg.519]    [Pg.75]    [Pg.173]    [Pg.622]    [Pg.529]    [Pg.636]    [Pg.1823]    [Pg.43]    [Pg.474]    [Pg.583]    [Pg.69]    [Pg.317]    [Pg.2171]    [Pg.2857]    [Pg.217]    [Pg.213]    [Pg.846]    [Pg.519]    [Pg.75]    [Pg.173]    [Pg.622]    [Pg.529]    [Pg.636]    [Pg.1823]    [Pg.43]    [Pg.474]    [Pg.360]    [Pg.381]    [Pg.114]    [Pg.121]    [Pg.352]    [Pg.518]    [Pg.443]    [Pg.127]    [Pg.77]    [Pg.537]    [Pg.530]    [Pg.197]    [Pg.33]    [Pg.208]    [Pg.367]    [Pg.86]    [Pg.259]    [Pg.268]    [Pg.348]   
See also in sourсe #XX -- [ Pg.48 ]




SEARCH



© 2024 chempedia.info