Maintenance charging

Eig. 8. Cost of electricity (COE) comparison where represents capital charges, Hoperation and maintenance charges, and D fuel charges for the reference cycles. A, steam, light water reactor (LWR), uranium B, steam, conventional furnace, scmbber coal C, gas turbine combined cycle, semiclean hquid D, gas turbine, semiclean Hquid, and advanced cycles E, steam atmospheric fluidized bed, coal E, gas turbine (water-cooled) combined low heating value (LHV) gas G, open cycle MHD coal H, steam, pressurized fluidized bed, coal I, closed cycle helium gas turbine, atmospheric fluidized bed (AEB), coal J, metal vapor topping cycle, pressurized fluidized bed (PEB), coal K, gas turbine (water-cooled) combined, semiclean Hquid L, gas turbine... [Pg.421]

The volatile solvents recoverable by the activated carbon system or any other system are nearly all organic, and many of them form flammable or explosive mixtures with air. Such mixtures may lie between upper and lower explosive limits. The activated carbon system can avoid the explosive range by staying well below the lowest percentage of vapor which is still explosive it functions well at very low concentrations. The system also recovers solvents efficiently even in the presence of water the recovery efficiency is high (98 percent and 99 percent are not unusual) it may be fully automatic. The annual maintenance charge rarely exceeds 5 percent of the cost of equipment. The recovery expense may be as low as 0.2 cent per pound in some installations it rarely exceeds 1 cent per pound. [Pg.301]

Maintenance charges Maintenance costs as an average over the plant life (based on previous experience and guidance) should be sought from the manufacturer. [Pg.195]

While almost any corrosion problem can be solved or avoided, it is vitally important from a commercial point of view that the economics of corrosion prevention are taken into account. This necessitates evaluation of initial protection costs together with maintenance charges throughout service life. This is very important when alternative protection schemes are available and will often reveal that an initial cheap scheme can in reality prove to be very expensive. [Pg.8]

The objective function is comprised of the sum of the annual operating and maintenance costs of the compressors and the sum of the discounted capital costs of the pipeline segments and compressors. The annualized capital cost for each pipe section is assumed to be proportional to its length and its diameter. Similarly the annual operation and maintenance charges of a compressor is assumed to be proportional to the horsepower which is given by... [Pg.182]

Operation and maintenance charges per year can be related directly to horsepower and are estimated to be between 8.00 and 14.0 /(hp)(year), hence the total operating costs are assumed to be a linear function of compressor horsepower. [Pg.472]

Water and Feed. Like all animals, pigs should be permitted free access to potable water, preferably from a municipal water supply intended for human consumption. Drinking water intended for pigs does not have to be filtered or deionized. Various diets have been described. Because of their size (i.e., high maintenance charges and test articles demand), pigs have seldom been used for chronic studies where the possibility of waterborne envinronmental contaminants could influence a study. [Pg.608]

Although the resistance of coals to abrasion may have little apparent commercial significance, the abrasiveness of coal is, on the other hand, a factor of considerable importance. Thus, the wear of grinding elements due to the abrasive action of coal results in maintenance charges that constitute one of the major items... [Pg.158]

Viability is assessed according to a required maximum 5 year return on investment. All annual costs must be considered. These costs include the required return on the capital outlay, as well as daily production costs, annual sundry charges such as insurance, tax, maintenance charges, and interest on borrowed capital. [Pg.102]

A multiple-effect evaporator is to be used for evaporating 400,000 lb of water per day from a salt solution. The total initial cost for the first effect is 18,000, and each additional effect costs 15,000. The life period is estimated to be 10 years, and the salvage or scrap value at the end of the life period may be assumed to be zero. The straight-line depreciation method is used. Fixed charges minus depreciation are 15 percent yearly based on the first cost of the equipment. Steam costs 1.50 per 1000 lb. Annual maintenance charges are 5 percent of the initial equipment cost. All other costs are independent of the number of effects. The unit will operate 300 days per year. If the pounds of water evaporated per pound of steam equals 0.85 x number of effects, determine the optimum number of effects for minimum annual cost. [Pg.416]

Labour, Maintenance and Administrative Costs. As a general rule, labour and maintenance were each charged at the rate 3% of the capital per annum. For labour, this included both direct and indirect labour costs. For maintenance, this included both materials and labour. Over the past decades, many companies have made attempts to reduce the operating labour and maintenance charges. Labour can be reduced by extensive computer control. However, the success or otherwise, in reducing the maintenance charge is difficult to quantify, several operations have suffered major problems claimed to be due to the cutbacks in maintenance costs. Administrative costs are basically insurance and local land taxes. A value of 1.5% of the fixed capital as an annual charge was used. [Pg.243]

In-plant battery maintenance (charging) requirements identified... [Pg.330]

Service stock available Service maintenance charging capability needed/in-place Production part pick-up/ delivery (Ford transport) plan... [Pg.331]

Repairs. For preliminary estimates, repairs can be taken as a percentage of the installed plant machinery and equipment cost. Maintenance charges range from 2 to 10 per cent of the plant costs on an annual basis which corresponds to 1 to 4 per cent of the manufacturing costs per unit. A consideration of the type of equipment and operation involved will. show whether repair charges should be high, low, or average. [Pg.236]

Software maintenance is currently 32 percent of a manufacturer s information technology budget. With the move to SaaS solutions, many companies can eliminate the maintenance charges and the headcount to service the software. It also increases a company s flexibility to stay current on new releases. [Pg.103]

Although the resistance of coal to abrasion may have little apparent commercial significance, the abrasiveness of coal is, on the other hand, a factor of considerable importance. Thus, the wear of grinding elements due to the abrasive action of coal results in maintenance charges that constitute one of the major items in the cost of grinding coal for use as pulverized fuel. Moreover, as coals vary widely in abrasiveness, this factor must be considered when coals are selected for pulverized fuel plants. A standardized, simple laboratory method of evaluating the abrasiveness of coal would assist, like the standard grindability test now available, in the selection of coals suitable for use in pulverized form. [Pg.263]

Similarly, operation under vacuum not only provides excellent cooling but simultaneously prevents escape of noxious vapors and eliminates the need for hydrochloric acid-vapor blowers, plus their attendant cost and maintenance charges. A reduced pressure of 250-330 mm of mercury and a corresponding slurry temperature of 75 -80°C represent typical operating conditions. [Pg.252]

Tridde chaise Maintenance charge to keep the battery in full-charge state after the charge cycle. Trickle charge compensates for self-discharge. [Pg.1257]

Maintenance charges in the form of Spare inventory Repair charges Software maintenance Testing (e.g., proof testing)... [Pg.1009]

The third step is a maintenance charge of indefinite duration at a current of between the 0.05 and 002C rates. The battery should also be protected with a thermal cutoff device to terminate the charge so that the temperature does not exceed 60°C. [Pg.867]

In applications with permanent maintenance charge, the life of a battery is expressed as the multiple of Cs Ah of overcharge or as hours of operation, and the failure rate as failures per operating hour. As an example. Figure 4.5 shows the estimated cycling life at 20°C as a function of discharge for SAJT sealed nickel-cadmium batteries. [Pg.117]

The operating and maintenance costs, as well as plant investment costs, are a function of reactor type and method of maintenance. However, the exact form of some of the interrelations between design variables is not known at the present time. For example, the plant investment and maintenance costs are undoubtedly different for a burner-type reactor than for a breeder-type reactor a cost difference would also exist between one- and two-region systems. However, because of the lack of information, most economic studies do not consider such differences, but assume investment and maintenance charges to be determined primarily by the reactor power level. The results of such studies are still significant if they are considered in the light of the assumptions used as more cost data arc accumulated, the results can be modified as required. [Pg.515]


See other pages where Maintenance charging is mentioned: [Pg.643]    [Pg.64]    [Pg.158]    [Pg.153]    [Pg.313]    [Pg.253]    [Pg.58]    [Pg.3]    [Pg.392]    [Pg.21]    [Pg.218]    [Pg.84]    [Pg.672]    [Pg.68]    [Pg.186]    [Pg.81]    [Pg.788]    [Pg.792]    [Pg.943]    [Pg.371]    [Pg.118]    [Pg.521]   