Task 5 Prepare Implementation Project Plans

At this point, the teams should prepare to move to Phase 2. The preparation will depend on the needs of the individual project. They will have to be sufficient to receive Steering Committee approval. This will depend on company policy, the size of project, and the risks involved. [Pg.191]

James B., Supply Chain Project Management A Structured Collaborative and Measurable Approach, Boca Raton, FL St. Lucie Press, 2004. [Pg.192]

A Guide to the Project Management Body of Knowledge (PMBOK Guidd ), Newtown Square Project Management Institute, 2000. [Pg.192]

Kerzner, Harold, Strategic Planning for Project Management Using a Project Management Maturity Model, New York John Wiley Sons, 2001. [Pg.192]

Bensaou, M. and Earl, Michael, The right mind-set for managing information technology, The Harvard Business Review, September-October, 1998, pp. 119-128. [Pg.192]


Phase 5. Step 1 aims to identify problems and tasks within the preparation and implementation process. Furthermore it specifies aspects of project planning and project implementation. [Pg.287]

Planning is the most critical phase of the data collection process as it creates a foundation for the success of the implementation and assessment phases. Two major tasks of the planning phase, as shown in Figure 2.1, are Task 1—Data Quality Objectives Development and Task 2—Sampling and Analysis Plan Preparation. The SAP summarizes the project objectives and requirements for environmental chemical data collection. [Pg.11]

Site construction of the project requires organizing the constmction bid packages, selecting contractors, and writing subcontracts. These contracts include a specific scope of work for the various construction and installation tasks and the implementation of appropriate procedures for expediting the project. An equipment installation document is then prepared for the construction contractor (9). This document verifies that equipment is properly connected to the defined utilities (air, electrical, water, sanitary drains, product, cleaning systems) and that the contractor has a planned schedule of events. Arrival of the equipment will initiate the startup and testing phase for the equipment. [Pg.2654]

The term PP is used in this book because it is preferred by the PMI, the gold standard of project management professional societies. However, other names include project delivery plan, project execution plan, project implementation plan, project management plan, project operations plan, project work plan, task plan, and technical operating plan. What we call it is not important preparing and using it is. [Pg.174]


See other pages where Task 5 Prepare Implementation Project Plans is mentioned: [Pg.191]    [Pg.191]    [Pg.817]    [Pg.36]    [Pg.179]    [Pg.339]    [Pg.39]    [Pg.20]   


SEARCH



Implementation Plan

Implementation project

Project Implementation Plan

Project plan

Project planning

Tasks

© 2024 chempedia.info