New regulatory requirements are anticipated and tracked by the organization, and compliance is achieved according to a regulatory schedule. [Pg.91]

This table reflects the regulatory schedule revised on March 18, 1999 Federal Register (64 FR 13422). [Pg.1288]

In the 1987 amendments of the CWA, Congress incorporated Seetion 319 to establish a national program to eontrol non-point source discharges whieh provided a regulatory schedule for storm water. These amendments also established a revolving loan fund for eon-struetion of sewage treatonent plants and provided EPA with enhaneed enforcement tools. ... [Pg.1293]

Note Extra refers to two meetings held by the ICH S7B Expert Working Group that were outside of the regulatory scheduled meetings of the ICH Steering Committee. Step reader is referred to the ICH website for a definition of the ICH Process (http //www.ich.org)... [Pg.20]

Preventive maintenance on vital equipment should be properly scheduled, carried out and documented. This program must be separate from the regulatory inspection. [Pg.29]

Preventive maintenance on vital equipment, such as tractor units, tanks, pumps, hoses, hard arms, pipelines, and mooring facilities, should be properly scheduled, carried out and documented. This program should be separate from the regulatory inspection. Verify from records. [Pg.197]

For regulatory purposes the fuel economy assigned to the vehicle from these tests is based on the premise that the vehicle will accumulate 55 percent of its mileage on the urban schedule and 45 per-... [Pg.104]

Procedures should be established to periodically monitor all operations that may have an environmental impact, and similar scheduled periodic checks should be made to ensure that procedures and operations are still in line with regulatory and other requirements. If equipment is involved in the monitoring process then procedures should also be in place to ensure correct calibration. Procedures are also needed to record any preventative or corrective actions identified and to ensure that they are completed to schedule. The whole EMS should be audited periodically to check that it is consistent with the planned policy and has been properly implemented. The details of audits should be discussed and reviewed by management at the highest level with a view to continuous improvement through the modification of both policy and procedures. [Pg.52]

Many companies have developed or purchased computer software for the purpose of storing stability data for a large number of studies. Examples of commercially available systems are SLIM [147] and Stability System [148]. These systems can perform other functions as well, including work scheduling, preparation of summaries of selected or all studies in the system, tabulation of data for individual studies, label printing, statistical analysis and plotting, and search capabilities. Such systems should be validated to keep pace with current regulatory activity [149],... [Pg.169]

In contrast to other tests that measure glucose, this method is truly non-invasive. The fluid for doing the test in fact is tears, as the glucose concentration in tears is known to correlate with the blood glucose concentration. Manufacturing is scheduled by 2010 with clinical trials currently being conducted and regulatory approval scheduled in 2009. [Pg.152]


See other pages where Regulatory schedule is mentioned: [Pg.21]    [Pg.21]    [Pg.77]    [Pg.77]    [Pg.264]    [Pg.117]    [Pg.441]    [Pg.421]    [Pg.2]    [Pg.188]    [Pg.188]    [Pg.244]    [Pg.181]    [Pg.242]    [Pg.34]    [Pg.74]    [Pg.469]    [Pg.203]    [Pg.379]    [Pg.91]    [Pg.777]    [Pg.346]    [Pg.11]    [Pg.13]    [Pg.404]    [Pg.526]    [Pg.114]    [Pg.215]    [Pg.384]    [Pg.556]    [Pg.570]    [Pg.669]   
See also in sourсe #XX -- [ Pg.21 ]




SEARCH



© 2024 chempedia.info