Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Operational layouts

Operational layouts were developed providing physical capabilities to accommodate those requirements as defined by the process flow charts. Operational layouts identified both space requirements and requirements for Ammunition Peculiar Equipment (APE), to meet individual item configurations. [Pg.277]

Della Porta, G., Campardelli, R., Falco, N., and Reverchon, E. PLGA microdevices for retinoids sustained release produced by supercritical emulsion extraction Continuous versus batch operation layouts. Journal of Pharmaceutical Sciences 100 (2011) 4357-4367. [Pg.466]

Facilities, hardware, equipment, tooling, selection of materials, operations layout and configuration, energy controls, environmental concerns... [Pg.307]

Over time, the level of safety achieved will relate directly to the caliber of the design of facilities, hardware, equipment, tooling, operations layout, the work environment, the work methods, and products. Design, as the term is used here, encompasses all processes applied in devising a system to achieve results. [Pg.354]

Transfer funds to an international bank account Operability Layout Appropriateness LA= 100xC optimal/C designed... [Pg.122]

Consideration of alternatives seeks to ensure that the proposer has considered other feasible options including location, scales, processes, layouts, operating conditions and the no action option. [Pg.72]

The function of offshore production facilities are very much the same as those described for land operations. An offshore production platform is rather like a gathering station hydrocarbons have to be collected, processed and evacuated for further treatment or storage. However, the design and layout of the offshore facilities are very different from those on land for the following reasons ... [Pg.264]

The development section serves as an intermediary between laboratory and industrial scale and operates the pilot plant. A dkect transfer from the laboratory to industrial-scale processes is stiH practiced at some small fine chemicals manufacturers, but is not recommended because of the inherent safety, environmental, and economic risks. Both equipment and plant layout of the pilot plant mirror those of an industrial multipurpose plant, except for the size (typically 100 to 2500 L) of reaction vessels and the degree of process automation. [Pg.436]

Automatic discharging suspended magnets can be operated transversely (Fig. 2) or parallel to conveyor flow (Fig. 3b and 3c). Because the tramp iron must be attracted from a buried location and turned 90° from the movement of the conveyor belt, a larger and stronger magnet is required for a transverse installation. In some instances, the material handling layout, or desired operation location, dictates the use of the transversely mounted magnet. [Pg.421]

Potassium Carbonate Process. The potassium carbonate process is similar to the sodium carbonate process. However, as potassium bicarbonate [298-14-6] is more soluble than the corresponding sodium salt, this process permits a more efficient absorption than the other. The equipment layout is the same and the operation technique is similar. [Pg.21]

Since the belt is wrapped snugly around the material, it moves with the belt and is not subject to any form of internal movement except at feed and discharge. In addition, the belt can operate in many planes, with twists and turns to meet almost any layout condition within the fixed hmit of curvature placed on the loaded belt. It can convey and elevate with only a single drive multiple feed and discharge points are relatively easy to arrange. [Pg.1926]

The design and layout of the physical facihties that make up the processing-plant flow sheet are an important aspect in the implementation and successful operation of such systems. Important factors that must be considered in the design and layout of such systems include (1) process performance efficiency, (2) rehability and flexibihty, (3) ease and economy of operation, (4) aesthetics, and (5) environmental controls. [Pg.2242]

Ultimate uses Because the ultimate use affects the design and operation of the landfill, this issue must he resolved before the layout and design of the landfill are started. [Pg.2253]


See other pages where Operational layouts is mentioned: [Pg.83]    [Pg.83]    [Pg.78]    [Pg.289]    [Pg.6]    [Pg.53]    [Pg.91]    [Pg.315]    [Pg.83]    [Pg.83]    [Pg.78]    [Pg.289]    [Pg.6]    [Pg.53]    [Pg.91]    [Pg.315]    [Pg.66]    [Pg.1027]    [Pg.142]    [Pg.156]    [Pg.158]    [Pg.90]    [Pg.470]    [Pg.104]    [Pg.41]    [Pg.402]    [Pg.350]    [Pg.55]    [Pg.69]    [Pg.69]    [Pg.74]    [Pg.74]    [Pg.36]    [Pg.62]    [Pg.182]    [Pg.316]    [Pg.357]    [Pg.197]    [Pg.299]    [Pg.508]    [Pg.1054]    [Pg.1115]    [Pg.1211]    [Pg.1238]    [Pg.2146]   
See also in sourсe #XX -- [ Pg.277 ]




SEARCH



Factory layout and operation

Operating Principles and Plant Layout

Operations planning and layout

Plant layout and operation

© 2024 chempedia.info