Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Lockout

Fig. 3. Hardwired system having a PLC backup with lockout where the reset button must be pushed once the switch trips. CR = contact relay and LSHH = level switch high-high alarm "or" and "and" gates are designated as boxes. Fig. 3. Hardwired system having a PLC backup with lockout where the reset button must be pushed once the switch trips. CR = contact relay and LSHH = level switch high-high alarm "or" and "and" gates are designated as boxes.
Palletizing/moving Follow safe procedures for drum stacking and drums incor- moving rectly-drum falls. lockout/tagout procedures and breaks or opens. CCPS G-3 CCPS G-22 CCPS G-29 CCPS G-32... [Pg.88]

Material solidifies Monitor and control temperature in feed system or is too viscous, Heat trace and/or insulate lines and plugs lines. Potential for proper line break procedures exposure while Use personal protective equipment (PPE) correcting, proper lockout-tagout and confined space problem. entry procedures CCPS G-23 CCPS G-29 Fisher 1990... [Pg.95]

Lockout or blocking feature. Such a feature is necessary for complete safety of the machine after every trip for any of the reasons discussed above. It is imperative... [Pg.298]

TestP.B. 36. Incomer breaker feeder 37. Lockout relay (86) 38. Under voltage relay (27)... [Pg.510]

Safety procedures for lockout, tank entry, hot work permits, and excavation written First aid and medical assistance available First-aid kits, blankets, stretchers, antidotes, and resusci-tators on hand... [Pg.331]

Are lockout procedures used for machinery deactivation during maintenance ... [Pg.47]

Does the SAHP contain a lockout/tagout program that includes energy control procedures and employee training practices [OSHA Reference. 147(c)(1)]... [Pg.273]

Do the lockout/tagout procedures clearly outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy and the means of enforcing compliance [OSHA Reference. 147(c)(4)(ii)]... [Pg.273]

Specific requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures ... [Pg.273]

Do lockout and tagout devices indicate the identity of the employee applying the devices [OSHA, 147(c)(5)(ii)(D)]... [Pg.275]

Are all affected employees given prior notification of the application and removal of lockout and tagout devices [OSHA Reference. 147(c)(9)]... [Pg.275]

Are lockout devices affixed so as to hold the energy isolating device in a safe or off position ... [Pg.275]

Following the application of lockout or tagout devices, is all stored or residual energy relieved, disconnected, restrained, or otherwise rendered safe [OSHA Reference. 147(d)(5)]... [Pg.275]

Safe work practices for hazards control lockout/tagout, confined space entry, procedures for opening process boundaries and entrance control for maintenance... [Pg.31]

The hazards of management-controlled nonroutine work in the process areas must be communicated to affected individuals. The work permit prescribes the procedures that must be followed to get the permit. Work authorization procedures specify lockout/tagout, line breaking., confined space entry, and hot work authorization through clear steps leading to job completion, closure, and return to normal. [Pg.73]

If, during the ignition sequence or the running sequence, flame failure occurs, a lockout will result, which will require manual resetting. [Pg.714]

Lockout and tagout of electrical and mechanical energy sources,... [Pg.421]

The valve was operated by compressed air, and the two air hoses, one to open the valve and one to close it, were connected up the wrong way around. The two connectors should have been different in size or design so that this could not occur. In addition, they were not disconnected, and a lockout device on the valve—a mechanical stop—had been removed. It is also bad practice to carry out work on equipment isolated from hot flammable gas under pressure by a single isolation valve. The take-off branch should have been slip-plated, and double block and bleed valves should have been provided so the slip-plate could be inserted safely (Figure 1-1), [16, 17]. [Pg.3]

There was another similarity to the first incident. In this case the equipment also had been prepared for repair and then had to wait for a couple of days until the maintenance team was able to work on it. During this period, the air lines were reconnected, the lockout removed, and the isolation valve opened. [Pg.4]

The accidental or unexpected sudden starting of electrical equipment can cause severe injuiy or death. Before ANY inspections or repairs are made (even on the so-called low-voltage circuits) the current should be turned off at the switch box and the switch padlocked in the OFF position. At tlie same time, the switch or controls of the macliine or other equipment being locked out of service should be securely tagged to show which equipment or circuits are being worked on. Lockouts and tagouts should be removed only by the individual(s) who installed them. [Pg.191]

Turn off power to electrical equipment before tests and repairs tlien lock and tag it out so it does not turn on by accident. Follow your company s lockout/tagout procedures. [Pg.199]

Examples of safety features are many and differ for the different equipment in the lines. Safety interlocks ensure that equipment will not operate until certain precautions have been taken. Safety machine lockout procedures are set up for action to be taken in... [Pg.548]

No work should be attempted until the boiler has properly cooled down, all safety and shut-off switches are in the off position, and all lockout and tagout procedures have been followed. [Pg.656]

The boiler doors and openings are closed, properly gasketed, and sealed. All protective sheets and covers are removed. Lockouts and tagouts are removed, and finally the unit is inspected before firing-up recommences. [Pg.657]

Many postoperative patients require less narcotics when they are able to self-administer a narcotic for pain. Because the self-administration system is under the control of the nurse, who adds the drug to die infusion pump and sets the time interval (or lockout interval) between doses, the patient cannot receive an overdose of the drug. [Pg.173]

Data Lockout Data Retention Data Archiving Data Sharing... [Pg.594]

The number of failed login attempts allowed before system lockout occurs... [Pg.646]


See other pages where Lockout is mentioned: [Pg.443]    [Pg.62]    [Pg.641]    [Pg.834]    [Pg.643]    [Pg.332]    [Pg.7]    [Pg.109]    [Pg.273]    [Pg.273]    [Pg.356]    [Pg.364]    [Pg.364]    [Pg.551]    [Pg.891]    [Pg.168]    [Pg.297]   
See also in sourсe #XX -- [ Pg.141 ]




SEARCH



Ball valve lockouts

Control of Hazardous Energy—Lockout/Tagout

Control of Hazardous Energy—Lockout/Tagout and Alternative Methods

Data lockout

Electrical safety equipment lockout procedures

Energy control procedures lockout/tagout

Equipment Lockout

Equipment lockout, hazardous work

Exceptions to Lockout Procedure

Group lockout

Hazardous Energy (Lockout Tagout) 29 CFR

Individual lockout

Label lockout

Lockout and tagout procedures

Lockout devices

Lockout devices applying

Lockout devices effectiveness

Lockout devices grouping

Lockout devices hazardous energy

Lockout devices removing

Lockout interval

Lockout start switch

Lockout tagout, written programs

Lockout/tagout

Lockout/tagout ANSI/ASSE

Lockout/tagout defined

Lockout/tagout hazardous energy control

Lockout/tagout program

Lockout/tagout standard work

Lockout/tagout systems

Lockout/tagout systems, design

Lockouts, Lockins, and Interlocks

Panel Board for Lockout

Procedures lockout/tagout

Removal of a Lockout Device in the Authorized Employees Absence

Safety machine-lockout

Sequence of Lockout Procedure

Shift change lockout

Switch lockout

Temporary Removal of Lockout Device during Servicing

Types of Lockout

Valve lockout devices

© 2024 chempedia.info