Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Installation instrument transformers

H NMR (400 MHz), NMR spectra were recorded on a Varian Mercury-Vx (3000Mx) ve Brucker AC-400L spectrometer using deuterated chloroform solvents and TMS as internal standard. IR spectra were recorded on a Schimadzu Fonrier Transform FTlR-8300 instalment. Mass spectra were recorded on a VG Zap spec instrument (1,000 resolution) (the Chemistry of the Turkish Scientific and Research Institue-Gebze). [Pg.348]

Electrical This item consists of transformers, wiring, switching gear, as well as instrumentation and control wiring. The installed costs of the electrical items may be estimated as 20 to 40 percent of the delivered equipment costs or 5 to 10 percent of the fixed capital investment for preliminary estimates. As with piping estimation, the process design must be well along toward completion before detailed electrical takeoffs can be made. [Pg.16]

The impedance can be measured using various instalments and techniques, ranging from a simple oscilloscope display to a fast Fourier transform (FFT) analyzer. The most common instrument used is a frequency response analyzer (FRA), e.g., the Solartron FRA. A potentiostat or a load bank combined with a frequency response analyzer can perform the EIS measurements. The electrical connection between the FRA, the potentiostat (or the load bank), and the fuel cell is illustrated in Figure 3.19. [Pg.130]

The electrical installation consists of four major components, namely, power wiring, lighting, transformation and service, and instrument and control wiring. Table 9 shows these component costs as ratios of the total electrical cost... [Pg.174]

The plan of the quarry is built on the coordinatograph of the device directly in this case the analytical transformations of photogrammetric coordinates are substituted by the instrumental ones. These transformations are achieved by the modifications of the installation on the device, that is, it is necessary to determine 6B as the vector of amendments to B. Vector 6B must be such that Eq. (8) for the supporting points will be the following... [Pg.201]

The part of the electrical supply system of direct relevance to cell-room area design is that involved in the provision of direct cmrent to the cells. This section covers the transformers, rectifiers, and buswork that handle that duty. Transformers do not provide direct current (DC), but they are included because of their intimate association with rectifiers. The transformer-rectifier installation is usually adjacent to the cell room but in a physically isolated area. Design, operation, and maintenance of these systems are all matters for specialists. This book does not discuss these subjects. Standard publications [10] cover them in detail, along with the extensive instrumentation and control systems that are necessary. [Pg.713]

The principle equipment generally installed in a distribution substation are power transformers, oil or air circuit breakers, voltage regulators, protective relays, air break and disconnect switches, surge arresters, measuring instruments, and in some instances, storage batteries and capacitors. [Pg.1109]

Loop impedance tests are carried out to determine the loop impedance between the power source(s) and the point in the installation where the test is done. The device employed measures the current which passes through a resistor and displays the result in ohms. It is used to determine the loop impedance between phases, phase to neutral or any phase to earth. Some instruments incorporate a transformer to enable the neutral/earth loop impedance to be measured. From Ohm s law these readings can then be expressed in prospective short circuit fault currents. [Pg.310]

The orbitrap analyzer incorporates a completely new concept of m/z analysis [15,205]. Commercialized by Thermo Fisher Scientific in 2005, the Orbitrap delivers high resolving power and accurate mass measurement at a level rivaling FT-ICR to a certain extent [15,206-210]. It is the special charm of the orbitrap to operate without a magnetic field, and therefore, to be available at a much lower price and lower installation room requirements than FT-ICR instruments. Nonetheless, it has one important feature with FT-ICR in common the orbitrap also employs image current detection of ion oscillations and Fourier transformation for the conversion of the transient into the frequency domain. [Pg.189]

The advances in the field of Fourier transform infrared (FT-IR) spectrometry in the past 20 years have been quite remarkable. FT-IR spectrometers are installed in just about every analytical chemistry laboratory in the developed world. Actually, we sometimes wonder why so many people still refer to these instruments as FT-IR spectrometers, or more colloquially simply as FTIRs, rather than simply as infrared spectrometers, since almost all mid-infrared spectra are measured with these instruments. We note that scientists who use nuclear magnetic resonance, the other technique that has been revolutionized by the introduction of Fourier transform techniques, no longer talk about FT-NMR, as continuous-wave instruments (e.g., grating monochromators) are a distant memory. Nonetheless, practitioners of infrared spectrometry seem to want to recall the era of grating monochromators, even though the vast majority has never seen one ... [Pg.554]

XI. 1.1 The tester should be placed on a level laboratory bench, allowing a 200 to 300 mm wide bench area in front of the tester. Ready access to the rear of the tester should be provided for routine maintenance and service requirements. Ensure that the vent on top or side of the JFTOT cabinet is not obstructed during installation or use. Adequate ventilation should be provided, and proper procedures for handling solvents and hydrocarbons should be used. A constant voltage transformer may be required by early versions of the instrument. Single-pha electrical power, 115 V-60 Hz-IS Amp or optional 220V-50 Hz-8 Amp with a ground outlet is required. [Pg.536]

Another type of pressure transmitter utilizes a bellow s-sealed differential transformer. The sensing element of this transmitter is similar to that of the previous unit and consists of a metallic bellows. The very slight movement of the bellow s during a pressure change is transmitted to a differential transformer by a rod with a secondary bellows seal. A matching transformer installed in a bridge circuit allow S a calibrated instrument to indicate or record the actual pressure in the system. [Pg.860]


See other pages where Installation instrument transformers is mentioned: [Pg.432]    [Pg.460]    [Pg.298]    [Pg.84]    [Pg.49]    [Pg.35]    [Pg.44]    [Pg.193]    [Pg.157]    [Pg.399]    [Pg.224]    [Pg.279]    [Pg.30]    [Pg.31]    [Pg.237]    [Pg.151]    [Pg.469]    [Pg.447]    [Pg.345]    [Pg.311]    [Pg.6]    [Pg.66]    [Pg.135]   


SEARCH



Instruments installation

© 2024 chempedia.info