Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Facilities order

TABLE 14. Decreasing facility order" for cleavage of the leaving group... [Pg.114]

Is a federal facility ordered to report by August 1995 President Clinton executive decree. [Pg.595]

The collection of representative reservoir fluid samples is important in order to establish the PVT properties - phase envelope, bubble point, Rg, B, and the physical properties - composition, density, viscosity. These values are used to determine the initial volumes of fluid in place in stock tank volumes, the flow properties of the fluid both in the reservoir and through the surface facilities, and to identify any components which may require special treatment, such as sulphur compounds. [Pg.112]

Reservoir fluid sampling is usually done early in the field life in order to use the results in the evaluation of the field and in the process facilities design. Once the field has been produced and the reservoir pressure changes, the fluid properties will change as described in the previous section. Early sampling is therefore an opportunity to collect unaltered fluid samples. [Pg.112]

In addition to fluid properties it is important to know how volumes and rates w change at the wellhead over the life of the well or field. Production profiles are required for oil, water and gas in order to size facilities, and estimates of wellhead temperatures and pressures (over time) are used to determine how the character of the production stream will change. If reservoir pressure support is planned, details of injected water or gas which may ultimately appear in the well stream are required. [Pg.237]

In order to assure that the 3D inspection system concept also in the future fulfills all the requirements for a 3D inspection system for complex geometry, the system is constantly developed and extended with new and powerful facilities. Some options assumed to be implemented in near future are ... [Pg.873]

The three isomers of thiazoleacetic acid can be decarboxylated, the order of facility being 2>5>4, though the relative stability depends on each particular compound and the reaction conditions (72-75). This reaction may be used to obtain certain alkylthiazoles (73). Malonic derivatives can also be decarboxylated to give aliphatic thiazole acids (49, 51)... [Pg.341]

Boards then proceed to the final processing steps, including trimming to the exact desired sizes, stacking, strapping, and shipping. Some orders may be for cut-to-size of smaller panels, and some mills may also have facilities for filling the surfaces to provide exceptionally smooth, ready-to-finish surfaces. [Pg.393]

In a mature facility the design team for a new building or an addition to an old building should seek input from the maintenance department. Maintenance workers know what equipment and material is difficult to maintain, and the standard in the existing facility employed in order to prevent stocking of many different replacement parts. [Pg.441]

In order to operate a process facility in a safe and efficient manner, it is essential to be able to control the process at a desired state or sequence of states. This goal is usually achieved by implementing control strategies on a broad array of hardware and software. The state of a process is characterized by specific values for a relevant set of variables, eg, temperatures, flows, pressures, compositions, etc. Both external and internal conditions, classified as uncontrollable or controllable, affect the state. Controllable conditions may be further classified as controlled, manipulated, or not controlled. Excellent overviews of the basic concepts of process control are available (1 6). [Pg.60]

Another medical use of radioisotopes, such Co, is to irradiate certain tissues within the body. An intense source of Co in a heavily shielded facility provides a highly coUimated beam of y-rays that impinge on a tumor in order to kill its cells. [Pg.458]

Flexible batch. Both the formula and the processing instructions can change from batch to batch. Emulsion polymerization reactors are a good example of a flexible batch facility. The recipe for each produc t must detail Both the raw materials required and how conditions within the reac tor must be sequenced in order to make the desired product. [Pg.752]

Especially for flexible batch applications, the batch logic must be properly structured in order to oe implemented and maintained in a reasonable manner. An underlying requirement is that the batch process equipment be properly structured. The following structure is appropriate for most batch production facilities. [Pg.755]

Self-organized materials with high surface area and pore size 3-25 nm was produced used templating and coassembly. The highly porous nature of the ordered combined with low adsorption and emission in the visible spectrum, facile diffusion makes them good candidate for optical and chemical sensor and provide new avenues for encapsulation/ immobilization processes and solve the problems mentioned above. [Pg.311]

Has the facility been a party to any agreement, consent order, administrative order or other legal proceeding with a regulatory agency regarding any environmental issue at the facility If yes, explain. [Pg.167]

This sample, referred to in Chapter 2, can serve as a guide for planning and conducting assessments of tollers. It may require additions, revisions, or other modifications in order to meet the needs of facility specific assessment objectives, the facility setting, or other special circumstances. This sample includes ... [Pg.179]

In order to build new facilities or expand existing ones without harming the environment, it is desirable to assess the air pollution impact of a facility prior to its construction, rather than construct and monitor to determine the impact and whether it is necessary to retrofit additional controls. Potential air pollution impact is usually estimated through the use of air quality simulation models. A wide variety of models is available. They are usually distinguished by type of source, pollutant, transformations and removal, distance of transport, and averaging time. No attempt will be made here to list aU the models in existence at the time of this writing. [Pg.320]

This means that parts must be ordered in advance for the turnaround and other work must be planned so that the whole operation may proceed smoothly and without holdups that could have been foreseen. This usually means close collaboration with the manufacturer or consultant and the OEM (or specialty service shop) so that handling facilities, service men, parts, cleaning facilities, inspection facilities, chrome plating and/or metaliz-ing facilities, balancing facilities, and some cases even heat treatment facilities, are available and will be open for production at the proper time required. This is the planning, which must be done in detail before the shutdown with sufficient lead-time available in order to have replacement parts available at the job site. [Pg.741]

New-source standards for new gas-fired facilities are even more stringent, where in some states the standards are as low as 0.02 Ib/MM Btu, or an order of magnitude lower than the levels mentioned above. [Pg.353]

Import is defined as causing the chemical to be imported into the customs territory of the United States. If you order a covered toxic chemical (or a mixture containing the chemical) from a foreign supplier, then you have imported the chemical when that shipment arrives at your facility directly from a source outside of the United States. By ordering the chemical, you have caused it to be imported," even though you may have used an import brokerage firm as an agent to obtain the chemical. [Pg.25]

Facility-specific system including modules for air emissions, calendar, facility and agency processes, groundwater, hazardous waste, incident response, permit tracking, solid (non-hazardous) waste, work orders, and wastewater. [Pg.290]

TOXIC, PUFF, SPILLS, INPUFF, AND INPUFF 2.0 Bowman Environmental Engineering P.O. Bo 29072 Dallas, TX 75229 (214) 241-1895 In ascending order of data complexity, these systems address toxic gas releases using models designed for each type of release, based on emission rate, facility characteristics and weather data. [Pg.306]


See other pages where Facilities order is mentioned: [Pg.387]    [Pg.536]    [Pg.1654]    [Pg.387]    [Pg.536]    [Pg.1654]    [Pg.580]    [Pg.1791]    [Pg.7]    [Pg.245]    [Pg.351]    [Pg.63]    [Pg.242]    [Pg.91]    [Pg.1193]    [Pg.33]    [Pg.625]    [Pg.45]    [Pg.207]    [Pg.338]    [Pg.17]    [Pg.195]    [Pg.651]    [Pg.447]    [Pg.428]    [Pg.351]    [Pg.24]    [Pg.113]    [Pg.113]    [Pg.139]    [Pg.177]    [Pg.188]   
See also in sourсe #XX -- [ Pg.8 , Pg.49 ]




SEARCH



© 2024 chempedia.info