Eeather meal, first hydroly2ed and then oxidi2ed, produces cysteic acid [13100-82-8] an excellent precursor for taurine in cats (20). Hydroly2ed feather meal may supplement the taurine provided by other dietary animal proteins and help replace part or all of the synthetic taurine in cat food formulations with considerable cost savings. [Pg.151]

In a mature facility the design team for a new building or an addition to an old building should seek input from the maintenance department. Maintenance workers know what equipment and material is difficult to maintain, and the standard in the existing facility employed in order to prevent stocking of many different replacement parts. [Pg.441]

The cobalt deposition rate on new, replacement, or decontaminated recirculation piping surface has been reduced by pretreating the piping using an atmosphere of oxygenated wet steam to form an oxide film (25). Studies have been conducted for both PWRs and BWRs to reduce the cobalt content of materials used in the nuclear parts of the plants, particularly in hardened and wear surfaces where cobalt-base alloys ( 50% Co) are used (26). Some low cobalt materials have been developed however, the use of the materials is limited to replacement parts or new plants. [Pg.196]

Recently several patents have been issued (16—18) describing the use of 1,2-dichloroethylene for use in blends of chlorofluorocarbons for solvent vapor cleaning. This art is primarily driven by the need to replace part of the chlorofluorocarbons because of the restriction on their production under the Montreal Protocol of 1987. Test data from the manufacturer show that the cleaning abiUty of these blends exceeds that of the pure chlorofluorocarbons or their azeotropic blends (19). [Pg.20]

Substitutes and Equivalents. In the past 25 years, many fats have been developed to replace part or all of the added cocoa butter ia chocolate-flavored products. These fats fall into two basic categories commonly known as cocoa butter substitutes and cocoa butter equivalents. Neither can be used ia the United States ia standardized chocolate products, but they are used ia small amounts, usually up to 5% of the total weight of the product, ia some European countries. [Pg.93]

Also in the long term, the equipment loses its eflicieney, and replacement parts are substituted in a maintenance function. Also, the plant goes through production expansions and contractions new equipment is added into the pipes. In short, the system and its elevations and pressures, its resistances and velocities, are very dynamic. The BEP of the pump is static. [Pg.117]

The problem of spare parts is an inherent phase of the maintenance business. The high costs of replacement parts, delivery, and in some instances, poor quality, are problems faced daily by everyone in the maintenance field. The cost of spare parts for a major power plant or refinery runs into many millions of dollars. [Pg.736]

Many pieces of equipment are made up of unitized components from several different vendors. The traditional attitude has been to look to the packaging vendor as the source of supply. Many vendors refuse to handle requests for replacement parts on equipment not directly manufactured by them. More and more specialty companies are entering the equipment parts business some are supplying parts directly to OEM companies for resale as their own brand. Others supply parts directly to the end user. The end user must develop multiple sources of supply for as many parts as possible. [Pg.736]

This means that parts must be ordered in advance for the turnaround and other work must be planned so that the whole operation may proceed smoothly and without holdups that could have been foreseen. This usually means close collaboration with the manufacturer or consultant and the OEM (or specialty service shop) so that handling facilities, service men, parts, cleaning facilities, inspection facilities, chrome plating and/or metaliz-ing facilities, balancing facilities, and some cases even heat treatment facilities, are available and will be open for production at the proper time required. This is the planning, which must be done in detail before the shutdown with sufficient lead-time available in order to have replacement parts available at the job site. [Pg.741]

The elements of a PM plan include periodic inspection, cleaning, and service as warranted, adjustment and calibration of control system components, maintenance equipment and replacement parts that are of good quality and properly selected for the intended function. Critical HVAC system components that require PM in order to maintain comfort and deliver adequate ventilation air include a outdoor air intake opening, damper controls, air filters, drip pans, cooling and heating coils, fan belts, humidification equipment and controls, distribution systems, exhaust fans. [Pg.211]

Filter insert The replacement part of a filter medium that is inserted in the filter housing. [Pg.1441]

An effective maintenance system depends upon it being adequately resourced. Maintenance resources include people with appropriate skills, replacement parts and materials, access to support from OEMs when needed, and the funds to purchase this material. If the equipment is no longer supported by the OEM, then you may need to cannibalize old machines or manufacture the parts yourself. This can be a problem since you may not have a new part from which to take measurements. At some point you need to decide whether it is more economical to maintain the old equipment than to buy new. Your inventory control system needs to account for equipment spares and to adjust spares holding based on usage. [Pg.361]

The operating cost includes items like fuel and other consumables. Maintenance costs are obviously repairs and periodic reworking of the structure. After the passage of years, nearly the entire aircraft structure has often been replaced part by parti The final category is the salvage value. What is the object worth at the end of its life Consider an aluminum airplane for which some scrap value exists at the end of its useful life. When the structure is no longer suitable to be flown, and there we... [Pg.32]

Materials—which include chemicals, process equipment, transport containers, protective equipment, and replacement parts—need to conform to quality (ESH/PSM) standards and specifications before being placed in use. Different materials will need varying levels of test and/or inspection as well as controls on their storage and handling. [Pg.163]

As shown in Fig. 3, bulk Pd-Cu-P glasses also require about 20 at.% P. The palladium concentration needed to form bulk amorphous rods with diameters of 7 mm is restricted to 40 - 60 at.%, which is narrower than that for Pd-Ni-P glasses. During these tests, we noticed that upon replacing part of the Cu by Ni, the glass forming ability of the... [Pg.290]

Solid-Type Stabilizers. (See Figure 4-180.) These stabilizers have no moving or replaceable parts, and consist of mandrel and blades that can be one piece alloy steel (integral blade stabilizer) or blades welded on the mandrel (weld-on blade stabilizer). The blades can be straight, or spiral, and their working surface is either hardfaced with tungsten carbide inserts or diamonds [57,58]. [Pg.825]

The ability to predict machine-train and equipment failures and the specific failure mode provided the means to reduce spare parts inventories by more than 30 per cent. Rather than carry repair parts in inventory, the surveyed plants had sufficient lead-time to order repair or replacement parts as needed. The comparison included the actual cost of spare parts and the inventory carrying costs for each plant. [Pg.797]

Metallic devices have been used to repair and replace parts of the human body for centuries. Archaeological evidence clearly indicates that surgical procedures were performed in several ancient civilisations. The use of surgical metal implants in humans was first recorded in 1562 when a gold prosthesis was used to close a defect in a cleft palate. ... [Pg.468]

The other approach to the reduction of the power loss to the dielectric material is by reducing the amount used. This is done by replacing part of the dielectric by air, an inert gas, or by vacuum. As examples there are three cable constructions in common use which employ these approaches to minimize dielectric loss. The first is the use of a foamed dielectric PS plastic that is commonly used in either twin lead transmission lines or in coaxial cables used for antenna lead-in wires in the UHF-TV antenna applications. The second system, which is illustrative of several sectional spacers, is used widely in communications cables of the coaxial type to minimize losses to the dielectric by reducing the amount of dielectric material in the cable. [Pg.225]

The principal minerals of Sr are strontionitc (SrCO,) and celesite (SrS04) those of Ba are barite (BaS04) and witherite (BaCO,). Strontionitc and barite are the usual sources of metallic Sr and Ba, respectively. Traces of both elements occur in nearly all limestones and dolomites and small amounts are usually present in natural limes. Furthermore, although neither element occurs as an independent silicate, traces of each may replace part of the Ca, Pb or K in compounds containing one or more of these elements. [Pg.380]

Some costs are easy to estimate, such as wages and salaries or utilities. The cost of equipment service is often overlooked, as is the cost of replacement parts. Lamps for atomic absorption instruments, for example, have finite lives and are quite costly to replace. Electrodes for pH meters and other instrument components all need periodic replacement. [Pg.117]

Defined maintenance procedures should include model or manufacturer specifics and a list of parts to be inspected, cleaned, lubricated, replaced, and/or calibrated. The replacement part numbers, cleaning solutions and lubricants, and calibration standards, along with the manufacturer s maintenance procedures to be followed, should be specified. Documentation is easily managed by creating a one-page checklist of instructions or performance parameters that can be checked off as each task is completed. Any issues or comments can be captured directly on the checklist. Provisions for failure or out-of-tolerance notification need to be clearly defined, as the equipment cannot be put back into service until the performance has been verified by conducting a performance qualification. [Pg.1042]


See other pages where Replacement parts is mentioned: [Pg.432]    [Pg.470]    [Pg.140]    [Pg.336]    [Pg.304]    [Pg.176]    [Pg.209]    [Pg.342]    [Pg.351]    [Pg.298]    [Pg.778]    [Pg.917]    [Pg.2170]    [Pg.160]    [Pg.226]    [Pg.44]    [Pg.293]    [Pg.298]    [Pg.659]    [Pg.344]    [Pg.10]    [Pg.527]    [Pg.882]    [Pg.217]    [Pg.295]    [Pg.121]    [Pg.345]    [Pg.13]   
See also in sourсe #XX -- [ Pg.381 ]

See also in sourсe #XX -- [ Pg.974 ]




SEARCH



Replacement body parts

Replacement of Metal Parts

© 2024 chempedia.info