The same care is required as in the case of the product. In the case of purchased utilities or reagents there may be leeway for the project engineers to determine the specifications, but there will inevitably be limitations (for example of price or source) which should be ascertained at the outset. [Pg.318]


Procedure Criteria Checklist" and the elements listed in this chapter were adapted from NUS Training Corporation s Piocedme Writing Workshop Manual. Gaithersburg, MD, Seventh Edition, 1995. [Pg.78]

Failure to use a good criteria checklist The only way to find a site that fits your specific needs is through the use of a detailed customized criteria checklist. If you are using a one-page document, you ve left out a lot of important details. To be an effective tool, the checklist must be as comprehensive as you can make it, and should include both long-and short-term economical, community, and quality of life factors. [Pg.1466]

Choose the design criteria checklist (for example Appendix 2). [Pg.308]

SAMPLE certification of the applicability of the substantial harm criteria checklist... [Pg.469]

Some in the industry use checklists, comparing the design against a set of questions or evaluation criteria. Checklists are ready most useful for small projects. Because it is not a systematic approach to safety, it is easy to miss something in large or complex processes. [Pg.52]

Evaluation and Effectiveness Criteria Checklist for Safety Programs... [Pg.113]

Furthermore, a satisfactory test is stated as one that verifies the ability of a particular component or system to perform its intended function. The planner is required to obtain and include performance testing requirements, acceptance criteria, checklists, and data sheets from Engineering in the preparation of the work package. Existing procedures, or applicable sections of existing procedures, may be used to prove system operability and that maintenance or modifications.were performed properly. Reactor Operations is required to review the work request for the completed maintenance activity and ensure, among other items, that performance tests have been satisfactorily performed. [Pg.478]

Studies of floristic similarity were carried out using 43 areas selected as representing the major biomes of north-eastern Brazil Atlantic rain forest (mata atldnticd), savannas cerrados), upland rocky fields compos rupestres) and caatinga. In the case of the caatinga, areas that were different based on physiognomy, type of substrate and occurrence in different geomorphological units were included (Table 6.1). An additional criterion for selection of an area was the availability of voucher specimens to check identification. In addition to the species cited in the published checklists, other... [Pg.129]

Restart evaluations against the RIMP criteria consider the ability of human performance (staffing and training) and management systems (procedures, instructions, checklists, and administrative programs) to support the conclusions reached. If any one of the RIMP criterion is met, the issue is considered to entail a critical deficiency that must be addressed prior to restart. The Issue Management Committee, may defer corrective actions to the post-restart period based on their considerations, including quantitative risk assessment results. [Pg.50]

The fifth criterion provides assurance that the environmental impact associated with the safety topic is within current environmental regulations. This criterion reflects increased sensitivity to providing assurance that environmental impacts are identified, evaluated, and managed. A checklist that considers the impact on air, surface water, ground water, and site use permits, is used to determine whether detailed environmental assessment is required in order to make final disposition on the environmental impact. [Pg.52]

OPS-SAM-890008, Section VI.D, states that specific ORR acceptance criteria are to be prepared by a checklist item reviewer with a peer review of the acceptance criteria by the RRB staff. The RRB will then review and approve each acceptance criterion. OPS-SAM-890009 Section 12.0 provides the instructions for developing and using the acceptance criteria. Generic acceptance criteria areto be used for many of the hardware checklist items to maximize the effectiveness of the ORR effort. A list of specific basic elements for each hardware checklist item will be developed for review against that related generic restart criteria. [Pg.643]