Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Hydrogen systems commissioning

Preparation for Cell Room Energization. Electrolyzers are isolated from header systems by blanks or slip plates during commissioning of the brine, caustic, chlorine, and hydrogen systems. Immediately before startup of those systems, all blank plates should be removed, leaving only valves closed where it is appropriate to isolate electrolyzers. There should be a record of all blank plates and slip-plates and their locations. This will help to ensure that all are removed before startup. [Pg.1257]

H. Lennartz and co-workers. Vaporisation Equilibrium of the Water—Sulfuric Acid System, Rep. Fur. 6783, Commission of European Communities, Hydrogen Energy Vector, Europe, 1980, pp. 60—70. [Pg.194]

J. J. Reilly, R. H. Wiswall, Jr., Hydrogen Storage and Purification Systems, US Atomic Energy Commission, BNL—17136, Brookhaven National Laboratoru, Upton, NY 11973, August 1972. [Pg.229]

EUR 22002, Introducing Hydrogen as an Energy Carrier, EUROPEAN COMMISSION, Directorate-General for Research Sustainable Energy Systems, Brussels, 2006. [Pg.566]

Written procedures shall be established for commissioning. Procedures shall consider the need to isolate the pipeline from other connected facilities and the transfer of the constructed pipeline to those responsible for its operation. Commissioning procedures, devices, and fluids shall be selected to ensure that nothing is introduced into the pipeline system that will be incompatible with the hydrogen gas to be transported, or with the materials in the pipeline components. [Pg.155]

NATURALHY (2007). Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as Catalyst. Integrated Project under the 6th Framework Programme of the European Commission, Contract No. SES6/CT/2004/ 502661, Newsletter, Issue 6, November 2007. www.naturalhy.net. [Pg.347]

Eide P, Hagen E F, Kuhhnann M, Rohden R, (2004). Construction and commissioning of the Utsira wind / hydrogen stand-alone power system. Published in the proceedings of EWEC 2004,22-25 November 2004. Downloadable from http //www.2004ewec.info/... [Pg.100]

Degiorgis L, Santarelli M, Cali M, (2007). Hydrogen from renewable energy a pilot plant for thermal production and mobility. Journal of Power Sources 171 237-246 European Commission, (1997). Development of the PV-diesel system in Rambla del Agua, Spain. THERMIE SE/218/95NL-DE-ES... [Pg.136]

Various (2000). Market Potential Analysis for Introduction of Hydrogen Energy Technology in Stand-alone Power Systems (H-SAPS), European Commission, DG for Energy and Transport, ALTENER Programme, Contract No. 4.1030/Z/01-101/2000... [Pg.162]

The absorption-isotherm method provides a very useful approach to the study of a gas-solid system. Inflection points in the isotherms locate phase boundaries, and a plot of log P vs. 1/T (Arrhenius plot) permits calculation of heats of solution and estimation of the eutectoid temperature. The shape of the isotherms depends only on those phases which affect the hydrogen absorption, rather than all phases present. The actual phases present were identified by high-temperature x-ray diffraction. The designation of the phases follows terminology commonly used in U. S. Atomic Energy Commission studies ... [Pg.137]

In the material modification due to non-recycling ions in a hydrogen plasma the mobility of the constituents will modify the surface concentrations and influence the erosion of the substrate. These effects can only be investigated in a controlled way using dual ion beam experiments. Such a system is being commissioned at IPP and results for the interaction of different plasma facing materials are expected in the near future. [Pg.221]

Commercial plants The first complete LAC plant, for 1,350-mtd ammonia, has been built for GSFC in India. Two other LAC plants, for 230-and 600-mtd ammonia, were commissioned in Australia. The latest LAC contract is under erection in China and produces hydrogen, ammonia and C02 under import of nitrogen from already existing facilities. There are extensive reference lists for Linde hydrogen and nitrogen plants and Ammonia Casale synthesis systems. [Pg.15]


See other pages where Hydrogen systems commissioning is mentioned: [Pg.588]    [Pg.85]    [Pg.189]    [Pg.122]    [Pg.26]    [Pg.31]    [Pg.37]    [Pg.1243]    [Pg.344]    [Pg.9]    [Pg.183]    [Pg.490]    [Pg.63]    [Pg.179]    [Pg.155]    [Pg.40]    [Pg.260]    [Pg.379]    [Pg.439]    [Pg.515]    [Pg.116]    [Pg.4]    [Pg.84]    [Pg.163]    [Pg.367]    [Pg.425]    [Pg.120]    [Pg.420]    [Pg.24]    [Pg.83]    [Pg.86]    [Pg.137]    [Pg.185]    [Pg.9]    [Pg.382]    [Pg.1689]    [Pg.14]   
See also in sourсe #XX -- [ Pg.1243 ]




SEARCH



Hydrogen systems

Hydrogenous systems

System Commissioning

© 2024 chempedia.info