Audit Teams independence

Audits may be conducted by one person experienced in the audit process with general knowledge of the type of facility to be audited. More often, audits are conducted by a small team of people. The audit team should not be associated with the program or facility under audit in order to provide an unbiased independent perspective. [Pg.31]

Code audit An independent review of source code by a person, team, or tool to verily compliance with software design documentation and programming standards. Correctness and efficiency may also be evaluated (IEEE). [Pg.178]

Audits are usually conducted by an audit team and led by a qualified, accredited auditor. Accredited auditors should have completed a certified development program, be accredited under an appropriate standard (ISO 9000 2000 TicklT in this context), and should have conducted a number of qualifying audits. Pharmaceutical and healthcare companies that do not have their own accredited auditors can engage an independent auditor, as we have seen. Names and addresses of accredited auditors can be found in national registers of certified auditors. The International Register of Certificated Auditors is one such register, associated with the Institute of Quality Assurance (IQA). [Pg.164]

That independence is critical. An in-house quality assurance (QA) person may qualify as long as reporting relations establish complete independence from the facility management. For example, some large pharmaceutical companies use their own audit teams, reporting directly to an upper level executive, to wander the globe investigating corporate facilities. [Pg.170]

Safety audit unit should be based on the project s objectives and its safety audit risk level selected auditors, determination of audit project leader. In determining the audit staff should strictly implement the avoidance system, and maintain the independence of the audit team members. In considering the staff, attention should be paid to the professional knowledge structure and competence, hire safety professionals when necessary. Audit project manager carry on the division of the members according to the specific target of auditing projects. [Pg.1308]

Audits are often less effective than they might be. When auditing is performed through contracts with independent companies, there may be subtle pressures on the audit team to be unduly positive or less than thorough in order to maintain their customer base. In addition, behavior or conditions may be changed in anticipation of an audit and then revert back to their normal state immediately afterward. [Pg.401]

Section 12.6 Audit Team. The audit that you submit to BOEMRE must be conducted by either an independent third party or your designated and qualified personnel. The independent third party or your designated and qualified personnel must meet the requirements in 250.1926. [Pg.564]

The audit team is made up mostly of company personnel. One or more I3Ps would join the team, and provide the independence that the agency is looking for... [Pg.570]

It is important that a Road Safety Audit is carried out independently from the design team. This will ensure that the Audit Team is not influenced by familiarity with the project. The definition of independence can vary between clients. Some clients will accept an Audit Team from the same organisation as the design team while others insist on complete independence. [Pg.17]

All management systems must be audited on a regular basis by an independent audit team. [Pg.253]

Norskoil s audit department carries out independent audits of all platforms where the company is responsible as operator. They follow a schedule and cover different items. The audit team is led by an authorised auditor and includes experts in various fields. [Pg.343]

Road Safety Auditors should have experience of road safety, and have undertaken an approved course in Road Safety Audit. They need to demonstrate independence from the design team. The Road Safety Audit Team Leader should be a qualified engineer registered as an auditor, with 3 years road safety engineering experience. A Road Safety Auditor Team Member requires 2 years experience. The team normally consists of two auditors, but a single auditor is allowed on small schemes. [Pg.146]

An organisation such as the example above includes sub groups for each of the main activities and a support (or services) group to manage information and procurement. Auditing commitments may be fulfilled by an independent in-house team or by external auditors. [Pg.295]

Audit (Process Safety Audit) An inspection of a plant or process unit, drawings, procedures, emergency plans, and/or management systems, etc., usually by an independent, impartial team. [Pg.213]

The team should be realistic about the time required to see improvements in end-of-pipe measures in most cases the pilot project success will be measured on efficiency improvements and other in-process measures alone. In this case it is important to demonstrate that all PSM and ESH issues are being managed. You should consider having a management systems audit (validation) conducted by a group independent of the integration project team. This may be done in conjunction with the next scheduled audit. This may be a corporate or divisional audit function or a consultant engaged specifically for this task. [Pg.113]

Technically, Team Biologies consists of two distinct entities the core group and the cadre. The cadre—consisting of 130 inspectors exclusively concerned with blood and plasma—reports directly to ORA field offices. It was created in response to an Inspector General s audit and functions independently of the core group. The term Team Biologies actually refers to the core group. [Pg.55]

A Supplier Audit is an opportunity to establish good working relationships among the likely project team. A collaborative conduct of an audit can greatly facilitate project strategy through a realistic, constructive assessment of capabilities, reducing overall project risk. An independent assessment provides objective review of the supplier capabilities. [Pg.607]

SDLC documentation underlies a strict approval process that is defined in the software vendor s SOPs and can be audited by customers and regulative organizations. Documents created under the SDLC are versioned and include either handwritten or electronic signatures for approval from the responsible departments. The approval also involves a member of the QA department that is independent of the project team. Different versions of documents may be created as full documents that is, the most recent version includes the entire documentation, or delta documents, that contain just changes with respect to the previous version. [Pg.286]

It may be useful to supplement self-inspections with a quality audit A quality audit consists of an examination and assessment of all or part of a quality system with the specific purpose of improving it A quality audit is usually conducted by outside or independent specialists or a team designated by the management for this purpose. Such audits may also be extended to suppliers and contractors (see section 8, "Contract production and analysis"). [Pg.24]

As an overview, the mechanics of an individual audit are shown in Figure 24-1. The figure depicts the general sequence and procedures used for the formal external audit by an independent review team, but it can also apply to... [Pg.320]

The Road Safety Audit should be carried out independently from the design team. [Pg.16]

Most organisations imdertake a technical audit (or check) of their designs. Sometimes these are formalised through their Quality Assurance process and sometimes they involve less formal procedures. They are used to ensure that the design complies with national or local standards and to minimise mistakes within the design. They may include elements of road safety but do not set out to check the final safety performance of a scheme. The audits may be carried out by a senior member within the design team or by an independent person from another design team. [Pg.130]


See other pages where Audit Teams independence is mentioned: [Pg.97]    [Pg.81]    [Pg.167]    [Pg.315]    [Pg.131]    [Pg.23]    [Pg.132]    [Pg.147]    [Pg.112]    [Pg.95]    [Pg.194]    [Pg.195]    [Pg.21]    [Pg.127]    [Pg.232]    [Pg.188]    [Pg.2501]    [Pg.347]    [Pg.208]    [Pg.304]    [Pg.150]   
See also in sourсe #XX -- [ Pg.10 , Pg.140 ]