Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Wells construction

For the coordinate system used for optimization, redundant internal coordinates are usually best, followed by a well constructed Z-matrix, then Cartesian coordinates, then a poorly constructed Z-matrix. For simulating multiple molecules, Cartesian coordinates are often best. Most programs that generate a Z-matrix automatically from Cartesian coordinates make a poorly constructed Z-matrix. [Pg.71]

Examination of the records of wastewater injection wells that have been constructed in the United States shows that almost all the wells constructed thus far have been completed by one of three methods or close variations of them. The methods are ... [Pg.2260]

To assess the well construction materials compatibility versus the subsurface environment and the pesticide of interest, manufacturers can provide data about the various well construction materials or samples can be acquired for laboratory analysis. Also, QC samples of each material can be collected during installation and preserved for laboratory analysis for potential sample bias, if necessary. In addition to well construction materials, the potable water used to clean drilling equipment and to prepare the grout and hydrate bentonite should also be collected for laboratory analysis (see Section 3.2.6). [Pg.794]

Filter pack. Filter pack is the term used to describe the materials placed in the annular space between the screen and the formation (Figure 1). Aller et al. and Driscoll provide a discussion of the purpose and selection of filter pack materials. The filter pack serves a number of important mechanical functions. During well construction, it helps to keep the well screen centered in the borehole and acts to block the sealant from entering the well screen. The filter pack also improves hydraulic conductivity between the well screen and the formation, prevents formation materials from migrating to the well screen by acting as a filter, and helps support the screen and borehole. ... [Pg.794]

From well construction record Additional Comments ... [Pg.801]

Overall, it is not possible to evaluate whether any of these factors have compromised the data included in published studies. More research is required to determine how U-and Th-series nuclides are affected by various well construction methods and sampling procedures, how reliable are data from wells not designed fro trace element monitoring, and if there are any factors that have affected the data collected from past studies. Most importantly, radionuclide studies must incorporate greater awareness of the potential problems, summarize whatever details are available regarding the wells used, and consider potential problems where the relevant information is not available. [Pg.354]

Already during drilling and well construction there are certain risks for clogging of the aquifer porosity. As illustrated in Figure 41, fines may invade into permeable beds decrease the yield capacity. A well known such clogging additive to the drilling mud is bentonite, which ones invaded is very difficult to clean out. For this reason it is much better to use polymers in the mud. [Pg.169]

Figure 41. Different forms of clogging by fine particles during drilling, well construction and later on, production... Figure 41. Different forms of clogging by fine particles during drilling, well construction and later on, production...
SWECO VIAK AB, 2000. Well Construction, Results of control and documentation, Consultancy report in Swedish, Sweco Viak AB Malmo, 2000-06-21, Commission Number 1340.174.300. [Pg.238]

A detailed discussion of the technical aspects of industrial-waste injection-well construction can be found in Warner and Lehr.6 U.S. EPA20 also presents a survey of well construction methods and materials used for 229 hazardous waste injection wells. Two types of injection well completions are used with hazardous waste injection wells ... [Pg.789]

The decision-making engine in the CS is the set of classifier condition-action rules therefore, the key to a successful application is a well-constructed set of rules. If the control problem is straightforward, the necessary classifiers could, in principle, be created by hand, but there is rarely much point in doing this. A single classifier is equivalent to a production rule, the same structures that form the basis of most expert systems if a set of classifiers that could adequately control the environment could be created by hand, it would probably be as easy to create an equivalent expert system (ES). As an ES is able to explain its actions but a CS is not, in these circumstances, an ES would be preferable. [Pg.279]

For the satisfactory large-scale production of components, it is necessary to use carefully designed and well-constructed steel moulds suitably hardened and finished, depending on the surface quality required in the product. Small runs can be achieved using moulds of cheaper materials such as aluminium alloys. These latter moulds may require the support of frames or bolsters to prevent spread under repeated operation. [Pg.198]

Discriminant Analysis (DA) is a multivariate statistical method that generates a set of classification functions that can be used to predict into which of two or more categories an observation is most likely to fall, based on a certain combination of input variables. DA may be more effective than regression for relating groundwater age to major ion hydrochemistry and well construction because it can account for complex, non-continuous relationships between age and each individual variable used in the algorithm while inherently coping with uncertainty in the age values used for... [Pg.76]

A well-constructed plan is ultimately designed to do the greatest amount of good with the least amount of intervention. You can tell when you have devised a well-constructed treatment plan because it makes your job easier and because you can observe your client succeeding in treatment. A well-constructed treatment plan... [Pg.175]

Reverse circulation U or C 2000+ M,R,I plugging of certain formations is critical good for recovery and injection well construction continuous coring available produced fluids require handling (hazardous if NAPL is encountered) Formation relatively undisturbed compared with other methods large-diameter boreholes can be drilled ... [Pg.169]

Potential problems can result if monitoring well construction is such that the gravel pack and screened interval are not discretely terminated at the confining layer and its grouted annulus. [Pg.191]

Well construction minimizes the generation of significant quantities of potentially hazardous soils in contrast to significant volumes potentially generated by trench excavation. [Pg.217]

Wells constructed with perforations and an open unsaturated zone are an efficient procedure to introduce air into the subsurface. A vacuum pump attached to a central well(s) will draw air through the soil to purge the existing soil atmosphere with fresh air. Three commonly used scenarios for bioventing are shown in Figure 10.10. [Pg.307]

FIGURE 12.15 Schematic of typical recovery well construction detail. [Pg.368]


See other pages where Wells construction is mentioned: [Pg.69]    [Pg.69]    [Pg.73]    [Pg.185]    [Pg.42]    [Pg.87]    [Pg.790]    [Pg.792]    [Pg.793]    [Pg.794]    [Pg.794]    [Pg.796]    [Pg.800]    [Pg.801]    [Pg.353]    [Pg.124]    [Pg.789]    [Pg.1096]    [Pg.209]    [Pg.67]    [Pg.112]    [Pg.340]    [Pg.136]    [Pg.176]    [Pg.17]    [Pg.68]    [Pg.168]    [Pg.168]    [Pg.257]   
See also in sourсe #XX -- [ Pg.213 ]

See also in sourсe #XX -- [ Pg.235 ]




SEARCH



Injection well construction

Monitor-wells construction

Well Casing Construction

Well Construction Standards

Well Construction Standards purpose

Well-point construction

© 2024 chempedia.info