Slot sizes of the screens are chosen to maximize well yield so that reliable water samples and water-level drawdown data can be collected during specific-capacity and other field tests. To accomplish this, sieve analyses can be performed on split-spoon samples from the interval to be monitored. A grain-size distribution curve can be field plotted and analyzed to establish the screen slot size and the size of the gravel pack. For wells installed in competent bedrock, it may be wisest not to install a screen but to leave the hole open for maximum yield. In these cases, a surface casing is installed to prevent the collapse of the unconsolidated sediments and possible downward migration of contaminants. [Pg.165]

Water-level drawdown and increase in temperatnre were shown to enhance the decomposition process and reduce the carbon seqnestration potential of wetlands (DeBnsk and Reddy, 1998 Bridgham et al., 2001 Davidson and Janssens, 2006) (see Chapter 5). In addition, decomposition... [Pg.705]

Lower the intake of the pump and a dissolved oxygen meter probe into the well slightly above or in the middle of the screened interval. Purge the well at a rate 300-500 milliliter/minute (ml/min). Check the water level periodically to monitor the drawdown, which should not exceed 4-8 in. If the pumping rate is unknown, measure the evacuated volume in a graduated container and monitor the time to establish the rate. [Pg.148]

The level of the water in a well is measured to provide data for groundwater flow direction calculations and to calculate purge volumes required for a particular well. If a low-flow sampling protocol is used, the water level is also measured during pumping to ensure that there is minimal drawdown of the stagnant water column. [Pg.37]

Earthquake resulted in a sudden drawdown of Wilson (1967) water levels along the shore in conjunction with extensive submarine failures (500-600 ft by 1 mile long). 4000-ft long scarp on waterfront extended from 50 to 400 ft inland. [Pg.551]

A flowmeter log, made while a drillhole is being pumped at a moderate rate or by allowing water to flow if there is sufficient artesian head, permits identification of the zones contributing to the discharge. It also provides information on the thickness of these zones and the relative yield at that discharge rate. Because the yield varies approximately directly with the drawdown of water level in a well, flowmeter logs made by pumping should be pumped at least at three different rates. The drawdown of water level should be recorded for each rate. [Pg.180]

Based on the Japanese standard, the residual pore pressure ratio is set to be 30% because it consists of unconsolidated colluvium. The safety factor (FJ of the landslide during the impoundment and drawdown can be calculated by SFM. The results of against water level are shown in Figure 7. [Pg.64]

F calculated by TCM is also shown in Figure 7. When compared with the results calculated by SFM, it has the same trend both in the impounding and drawdown periods albeit with different values. The F. is equal to 1.036 at level 510 m. The reality is that when the reservoir water level rises to a level about 510 m during the initial impoundment period, a significant displacement occurs, which agrees with the calculation results. [Pg.64]

Xu W.J., Wenjie Wang L.C. et al. 2009. Fluid-solid coupling characteristics and stability Analysis of soil-rock mixture slope in rising and Drawdown of reservoir water levels, Chinese Journal of Rock Mechanics and Engineering. 28(7) 1491-1499. [Pg.473]

July 22, 1974 (UN-lOO-N-31) - While sample lines were being Installed In a 15-cm (6-1n.) steel casing through the berm on the west side of the 116-N-l crib, the water level In the crib was raised 38 to 46 cm (15 to 18 In.) as a result of an emergency dump tank (EOT) drawdown test being conducted. The Increased water level allowed an unplanned release of approximately 3,800 L (1,000 gal) of effluent water to ow throu the casing. This release contaminated 190 nr (2,000 ft ) of soil. Sand and fines were used... [Pg.128]

The figure illustration shows occurrence of clogging by plotting data from an observation well (OW) and compare that to the production well (PW). In this case the production well shows a decreased specific capacity while the observation well shows a steady level versus time. The only explanation is then that the resistance for water to enter the production well is increasing. The increased resistance will lower the drawdown inside the well, while the groundwater table outside the well is kept constant. This will increase the hydraulic gradient (the driving force) between the well and the aquifer and hence maintain a constant flow rate. [Pg.168]

The recovery most often used at sites with significant quantities of recoverable LNAPL is the two-pump system. A submersible water pump installed below the lowest possible probable interface level is used to create a drawdown cone of depression, while a second pump is suspended with its intake port located at the oil-water interface. A typical two-pump system installation is shown in Figure 7.15. [Pg.228]

Given all of this, the addition of iron to HNLC waters should result in higher levels of carbon fixation, increased growth of diatoms, local drawdown of CO2, and enhanced export of carbon to the deep sea. Iron-addition experiments in bottles and in situ on the mesoscale unequivocally support the first two points. Addition of iron to HNLC waters results in madly blooming phytoplankton (Martin and Fitzwater, 1989 Martin et al, 1994 Coale et al, 1996 Boyd et al, 2000 Strass, 2002). Chlorophyll concentrations may quadruple (e.g., Strass, 2002) and carbon fixation rates may triple (e.g., Coale et al, 1996) over the first few days after iron addition (Figure 12). [Pg.2955]


See other pages where Water level drawdown is mentioned: [Pg.162]    [Pg.666]    [Pg.639]    [Pg.162]    [Pg.666]    [Pg.639]    [Pg.803]    [Pg.71]    [Pg.77]    [Pg.200]    [Pg.148]    [Pg.48]    [Pg.165]    [Pg.279]    [Pg.398]    [Pg.16]    [Pg.364]    [Pg.106]    [Pg.180]    [Pg.62]    [Pg.62]    [Pg.64]    [Pg.65]    [Pg.356]    [Pg.637]    [Pg.201]    [Pg.274]    [Pg.129]    [Pg.230]    [Pg.274]    [Pg.91]    [Pg.2667]    [Pg.3352]    [Pg.281]    [Pg.294]    [Pg.247]    [Pg.363]    [Pg.183]    [Pg.131]    [Pg.319]   
See also in sourсe #XX -- [ Pg.162 ]