Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Installation water pumps

River-water pumping and filtering installations can be approximately correlated by... [Pg.873]

Heat exchangers with flowing cold electrolyte in fresh-water heat pump reservoirs must be treated similarly [9]. Here the cold electrolyte circuit need not have expensive insulated bushings installed as shown in Fig. 20-3, and the entire water pump equipment does not have to be grounded but must be covered to prevent contact. Electrical separation as in Fig. 20-3 is only undertaken with hot-water heat exchangers. [Pg.451]

Backup systems which depend upon the action of automatic cut-in devices (e.g., a turbine-driven standby spare for a motor-driven cooling water pump, with PLCI control) would not be considered an acceptable means of preventing a utility failure for normal pressure relief design purposes, even though their installation is fully justified by improved continuity and reliability of plant operations. [Pg.126]

Manually Controlled System A manually controlled system comprises one or more transformer-rectifiers each with its associated control panels which supply the d.c. to the various anodes installed in the water box spaces. Each transformer-rectifier is provided with its own control panel where each anode is provided with a fuse, shunt and variable resistor. These enable the current to each anode to be adjusted as required. Reference cells should be provided in order to monitor the cathodic protection system. In the case of a major power station, one transformer-rectifier and associated control panel should be provided for separate protection of screens, circulating water pumps and for each main condenser and associated equipment. [Pg.219]

When more than one pump is installed, they should be coordinated to start in sequence, since immediate start up of all pumps may not be necessary and could cause damage to the system. Depending on the number of pumps available, they can be set to startup on sequentially decreasing fire main set points. All fire water pumps should be able to be started from remote activation switches located in manned control rooms. [Pg.207]

The recovery most often used at sites with significant quantities of recoverable LNAPL is the two-pump system. A submersible water pump installed below the lowest possible probable interface level is used to create a drawdown cone of depression, while a second pump is suspended with its intake port located at the oil-water interface. A typical two-pump system installation is shown in Figure 7.15. [Pg.228]

A controller should be provided for each fire water pump. The controller should be designed and installed in accordance with NFPA 20 specifications. An example fire water pump controller is shown in Figure 7-16. [Pg.181]

Around the pump proportioners consist of an eductor installed in a bypass line between the discharge and suction of the water pump. A small amount of water passes through the eductor drawing the required quantity of foam concentrate into the system. These systems have limited uses and are not recommended for industrial purposes. [Pg.212]

New fire water pump installations require acceptance testing as defined in NEPA 20. This section highlights some of the important tests required. [Pg.336]

The plant shutdown (which distracted the operators and made the electric fire water pump unavailable) was caused by a thunderstorm that tripped the primary feeder and no backup feeder was installed. The unit should be designed to shutdown safely on loss of power. (Process hazards analysis)... [Pg.375]

Fire Pump A water pump used in private fire protection for providing additional water supply to installed fire protection systems. [Pg.235]

Figure 24. Scheme of multilamp immersion-type photochemical installation for the photocatalyzed oxidative degradation of industrial waste water [12]. A Bypass circuit. B Reactor circuit. 1 Gas-liquid mixture and injection. 2 Reservoir. 3 Pump (ceramics). 4 Water pump. 5 Heating circuit. 6 Cooling circuit, hv Medium pressure mercury lamps (Pyrex). T Thermometers. [Pg.281]

Cooling water systems. An investment cost of 58 per gpm of total water circulation is recommended for preliminary estimates. This represents the total installed costs for a conventional induced-draft cooling tower, water pumps, water-treating equipment, and water piping. Special costs for water supply and blowdown disposal are not included. [Pg.309]

Hot water thermostat, tank of cooling water, pumps for water pumping, gas and hydraulic main pipes and control instrumentation are parts of installation beside sorbers. Units of installation operation have cyclic character. In the first half-cycle, hydrogen is absorbed by metal hydride of a low-temperature sorber. Released heat is removed by flowing water with temperature 10-15°C. Hydrogen in a low-temperature sorber comes from a high-temperature sorber, where it is desorbed due to heating by hot water. [Pg.846]

The maximum mean cold output is reached when cycle time is 9-11 minutes and cold water pumping is continuous. In this case the installation (with modular sorber) has 450-500 W (temperature of the cooled liquid is 0.5-1.5°C), calculated value is 500 W. For a monoblock sorber it has 300-400 W. [Pg.848]

Includes PV for electrolysers, compressors, water pumps, water distillation, and the pipeline compression station. The PV additions for the 49.76 GWp of PV installed in the first year are 0.52 GWp per year for thirty years. The PV additions increase each year by 0.52 GWp. In the thirtieth year, the total quantity of PV additions is 15.73 GWp. The PV manufacturing capacity of five PV manufacturing plants will be needed ... [Pg.304]

Some other representative cost relationships can also be found in this reference (12), but these cannot be used as a substitute for data from the supplier. In general, the equipment costs include the following components fans, water pumps to dehver the water to the top of the tower, tower structure and packing, exterior covering, and electrical installation. The principal operating and maintenance costs are electrical power for pumping water and air, operating and maintenance labor, and chemicals to raise the pH. [Pg.67]


See other pages where Installation water pumps is mentioned: [Pg.430]    [Pg.475]    [Pg.2494]    [Pg.520]    [Pg.209]    [Pg.374]    [Pg.430]    [Pg.20]    [Pg.229]    [Pg.207]    [Pg.191]    [Pg.430]    [Pg.336]    [Pg.85]    [Pg.157]    [Pg.302]    [Pg.395]    [Pg.163]    [Pg.299]    [Pg.2249]    [Pg.430]    [Pg.279]    [Pg.430]    [Pg.79]    [Pg.313]    [Pg.224]    [Pg.107]    [Pg.719]    [Pg.296]   
See also in sourсe #XX -- [ Pg.336 ]




SEARCH



Pump installation

Water pumps

© 2024 chempedia.info