Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Time estimation

The calculated detonation velocity in room temperature acetylene at 810 kPa is 2053 m/s (61). Measured values are about 1000-2070 m/s, independent of initial pressure but generally increasing with increasing diameter (46,60—64). In a time estimated to be about 6 s (65), an accidental fire-initiated decomposition flame in acetylene at ca 200 kPa in an extensive piping system traveled successively through 1830 m of 76—203-mm pipe, 8850 m of 203-mm pipe, and 760 m of 152-mm pipe. [Pg.375]

If uranium is internally cycled in coastal environments or if the riverine delivery of U shows some variability, residence time estimates (regardless of their precision) cannot be sensitive indicators of oceanic uranium reactivity. Based on very precise measurements of dissolved uranium in the open ocean, Chen et alJ concluded that uranium may be somewhat more reactive in marine environments than previously inferred. Furthermore, recent studies in high-energy coastal environments " indicate that uranium may be actively cycled and repartitioned (non-conservative) from one phase to the next. [Pg.45]

Answer You can treat them as one component in the component column and prepare the FMECA for ways they can fail together. For random failure of both valves in a mission time, estimate the failure probability as one-half the failure rate of one times the probability of ailing in the mission time of the other. [Pg.498]

Human resources, whether in-house or retained by contract, cost money, and represent either a direct or an indirect investment. In lobbying for PSM resources, be realistic about the time you think the effort will require underestimating the level of effort can raise management s expectations beyond your ability to meet them. At the same time, estimates of staff required can t ignore prevailing company priorities for example, a request for five new staffers during a hiring freeze is unlikely to be favorably received. [Pg.35]

Many project managers find it realistic to estimate time intervals as a range rather than as a precise amount. Another way to deal with the lack of precision in estimating time is to use a commonly accepted formula for that task. Or, if you are working with a mathematical model, you can determine the probability of the work being completed within the estimated time by calculating a standard deviation of the time estimate. [Pg.822]

To = The optimistic (shortest) time within which only 1% of similar projects are completed Tp = The pessimistic (longest) time within which 99% of similar projects are completed T. = The calculated time estimate... [Pg.822]

PERT diagrams are most useful if they show the time scheduled for completing an activity on the activity line. Time is recorded in a unit appropriate for the project, with days being most common, and hours, weeks, or even months occasionally used. Some diagrams show two numbers for time estimates - a high estimate and a low estimate. [Pg.825]

Recall that the unit cell in the spinels comprises AgBi6032. In the normal structure, there are 16 B ions in octahedral sites and 8 A ions in tetrahedral ones. That corresponds to 96 octahedral B-0 bonds and 32 tetrahedral A-0 bonds or 128 bonds in all. In the inverse structure, we have 8 B ions in tetrahedral sites, 8 B ions in octahedral ones, and 8 A ions in octahedral sites. This corresponds to 48 octahedral B-O bonds, 32 tetrahedral B-O bonds and 48 octahedral A-O bonds or once again, 128 bonds in all. So the total number of M-O bonds, different types to be sure, is the same in both normal and inverse spinel structures. We could spend quite some time estimating the different bond energies of A-0 and B-O or of octahedral versus tetrahedral, but that would undoubtedly involve a lot of guesswork. We can at least observe that the bond count factor difference between the spinel... [Pg.160]

In fluid reservoirs like fhe afmosphere or the ocean, the turnover time of a tracer is also related to the spatial and temporal variability of ifs concentration within the reservoir a long turnover time corresponds to a small variability and vice versa (Junge, 1974 Hamrud, 1983). Figure 4-2 shows a plot of measured trace gas variability in the atmosphere versus turnover time estimated by applying budget considerations as indicated by Equation (1). An inverse relation is obvious, but the scatter in the data... [Pg.63]

Material Vendor and Model Tactility Rating Chemical Break- througji Time Estimated Protection Time Chrs)// Thickness in am Permeation Rate Cmg/aq m/min)... [Pg.70]

Courtesy dictates that when a report is complete, a copy be sent to each Principal Investigator with a time estimate for submission and registration. Notes of gratitude for their participation should also be sent to the Principal Investigators, their management, and cooperating growers. [Pg.213]

Accurate interpretation of the formation properties (porosity, permeability and irreducible water saturation) requires reliable estimates of NMR fluid properties or the relationship between diffusivity and relaxation time. Estimation of oil viscosity and solution-gas content require their correlation with NMR measurable fluid properties. These include the hydrogen index, bulk fluid relaxation time and bulk fluid diffusivity [8]. [Pg.324]

Organophosphate Ester Hydraulic Fluids. Organophosphate ester hydraulic fluids are used in applications that require a degree of fire resistance such as in aircraft. EPA (1992b) has noted that aircraft mechanics may have dermal exposures of 1,300-3,900 mg/day and that 2,200 aircraft workers are routinely exposed to tributyl phosphate, while another 43,000 mechanics may be exposed at various times. Estimates of worker exposure in other industries were not found in the available literature. General population and military personnel exposure to organophosphate ester hydraulic fluids is likely to be much lower than exposure to mineral oil hydraulic fluids because these fluids have more specialized uses. [Pg.311]

To use CPM or PERT, the job must first be divided into a number of tasks, and the average time to perform each of the tasks must be estimated. These tasks are called activities. The average time is the usual time it would take to perform the task when doing it the most economical way. To illustrate this, consider a job we have all performed, changing the front tire on an automobile. A list of the activities involved and a time estimate for them is given in Table 13-1. Before looking at that table, the reader should develop his own list and estimate how long each task will take. [Pg.370]

From the cost information, cost engineers can update their estimates so that future estimates will be more reliable. The planners can similarly update their time estimates. Even though this costs money, it is the best way a company can improve its predictive ability for future projects, as well as maintaining control over the current job. [Pg.380]

A manager seeking various time estimates must weigh all the responses he gets, since he can get different answers from the same person, depending on ... [Pg.381]

This estimate is used in much the same way the normal time estimate was used in constructing a CPM diagram and determining the critical path. Then an estimate is made of the probability of completing the total job in a certain time period. [Pg.382]

Time Estimates (Days) for the Installation of a Scrubber in an Existing Process... [Pg.383]

Traditionally the PERT diagram did not involve costs, but in the early 1960s a plan called PERT/Cost was developed that was similar to the cost-control concepts of CPM. Some authors claimed they were now essentially the same. PERT/Cost involves obtaining one cost for each activity. If the expected time were,the same as the normal time, the procedure for cost control would be the same as for a CPM system. The PERT system can also be easily adapted to the method presented for speeding up projects (crashing). The remarks made previously about scheduling and obtaining time estimates apply equally well to PERT and CPM. [Pg.386]

A company is interested in introducing a new product to the public. All technical problems have been solved and the economic prospect appears rosy. The various activities involved and their time estimates are given in Table 13-P3. [Pg.388]

Adoption of improved uniform methods of quantitation so that residue levels can be compared, and so that a time estimate of their environmental significance can be made (NRCC 1975 USEPA 1988)... [Pg.876]

Table 4.17. Time Estimates for Using the HAZOP Study Method... Table 4.17. Time Estimates for Using the HAZOP Study Method...
Emergency Evacuation Modeling - A study of the mechanisms, locations and time estimates to complete an effective removal of all personnel from an immediately endangered location or facility. [Pg.91]


See other pages where Time estimation is mentioned: [Pg.57]    [Pg.729]    [Pg.1123]    [Pg.79]    [Pg.824]    [Pg.320]    [Pg.244]    [Pg.139]    [Pg.341]    [Pg.117]    [Pg.85]    [Pg.200]    [Pg.382]    [Pg.383]    [Pg.385]    [Pg.385]    [Pg.39]    [Pg.69]    [Pg.1026]    [Pg.164]    [Pg.154]    [Pg.107]   
See also in sourсe #XX -- [ Pg.628 , Pg.629 , Pg.630 ]




SEARCH



Delay Time Parameter Estimation

Divergence time estimates

Effective interaction potential estimated time

Estimated parameters for the Naphtha time series

Estimated-Time-of-Arrival

Estimating the Diffusion Depth and Time to Approach Steady State

Estimating the Rouse Time of an Entangled Chain

Estimating the Time Series Model Parameters

Estimating time

Estimating time

Estimation of Blend Time

Estimation of Breakthrough Time

Freezing time estimation

Functional barrier estimating the time it takes for styrene to travel through a material

Residence time distribution axial dispersion estimation

Time Estimation task

Time Frame of Requirement Estimates

Time evolution variable estimates

© 2024 chempedia.info