Site Planning

Site plan is a scaled drawing, including the roadway system for adjacent areas and auxiUaries and the space requirements for the processing faciUty. [Pg.69]

Site plan with marked release points, sample points, detailed dimensions. [Pg.388]

Enter the latitudinal and longitudinal coordinates of your facility. Sources of these data include EPA permits (e.g., NPDES permits), county properly records, lacility blueprints, and site plans. Instaictions on how to develop these coordinates can be found in Appendix F. Enter only numerical data. Do not preface numbers with letters such as N or W to denote the hemisphere. [Pg.34]

Both emergeney and aeute, nonemergeney medieal treatment should be available at the worksite. The plan should be integrated with the overall site plan and the surrounding eommunity emergeney and disaster plan. In addition, input from and review by the oeeupational medieine physi-eian and health and safety personnel is invaluable for developing the medieal and emergeney preparedness portions of the plan. [Pg.87]

Eor example, at Site G, no rationale was provided for using modified Level C PPE for a few jobs for whieh use of a half-mask respirator is permitted. Additionally, the Site E site plan did not eontain any site-speeifie PPE information that employees eould use for site tasks and operations. [Pg.189]

Signiflcant deficiencies in site control procedures existed at Site K. For example, the Site K subcontractor had not established a contamination reduction zone (CRZ), to physically separate the support zone from the exclusion zone, as required in the site plan. [Pg.198]

Air and natural gas are often used as a drilling fluid with no additives placed in the injected stream of compressed fluid. This type of drilling is also often referred to as dusting because great dust clouds are created around the drill rig when no formation water was present. However, modern air and gas drilling operations utilize a spray at the end of the blooey line to control the dust ejected from the well. Figure 4-185 shows a typical site plan for air drilling operations. [Pg.841]

Scheme, site plan, layouts and elevations including infrastructure modifications ... [Pg.51]

Following preparation of an on-site plan the Local Authority responsible for emergency... [Pg.294]

Explosion consequences in terms of overpressure and other effects may be evaluated by appropriate methods such as those described in Reference 5 and Appendix A. In evaluating the consequences of potential explosions, all these methods account for the energy of the explosion, the location of the explosion source, and attenuation of explosion effects with distance from the explosion source. From such an evaluation, maximum blast parameters can be determined at all locations of interest. Evaluation results can be graphically expressed by plotting contours of equal blast overpressure on a site plan of the facility, as shown in Figure 4.4. [Pg.34]

Collect existing site plans and process diagrams... [Pg.8]

Buetefisch then looked over the Auschwitz site. Plans for the buna-rubber plant were ready. "So the power plants, the roads and waterways and individual buildings that had originally been planned for rubber had to be planned again — to have one power plant only, one waterworks, one pipe bridge, and one waterway and this project bad to be pushed very quickly so that one could catch up with the others."... [Pg.170]

Shah, N. (1998) Single- and Multi-Site Planning and Scheduling Current Status and Future Challenges. Proceedings of the 3rd Conference Foundations of Computer-Aided Process Operations, CACHE, Michigan, pp. 75-90. [Pg.213]

Several recovery scenarios were considered for remediation. Initially, construction of a narrow, permeable trench parallel to the canal appeared to be an appropriate interception system. The construction technique considered was use of a specially designed deep trenching unit. This type of trench would have included a tile drain leading to a single two-pump recovery well. However, a review of the subsurface site plans and interviews with long-term employees determined that an unknown number of buried pipes traverse the area intended for the trench construction. Disruption of refining operations and safety considerations resulted in rejection of this option. [Pg.367]

Slide 6 A facility overview I site plan, manufacturing buildings, production trains, reactor volume... [Pg.221]

The exam bulletin will tell you when and where your exam is being held. Do you know how to get to the testing site Do you know how long it will take you to get there If not, make a trial run, preferably on the same day of the week and at the same time of day. Make note, on the Final Preparations worksheet, of the amount of time it will take you to get to the exam site. Plan on arriving 10-15 minutes early so you can get the lay of the land, use the bathroom, and calm down. Then figure out how early you will have to get up that morning, and make sure you get up that early every day for a week before the exam. [Pg.57]

The floor plans of the ABC Pharmaceutical Industries production facility located in (city and country name) are included under (provide reference to attachment no.). The production areas are color coded as to their environmental classification. The site plan highlights the production areas, rooms, and area classifications. The following drawings are included under (provide reference to attachment no.) ... [Pg.479]

Figure 2. Locality plan, site plan, and pilot plant layout and profile. Figure 2. Locality plan, site plan, and pilot plant layout and profile.
Fig. 36. Site plan for the advanced pressurized water reactor (PWR). (Westing-house Electric Corporation, Energy Systems)... Fig. 36. Site plan for the advanced pressurized water reactor (PWR). (Westing-house Electric Corporation, Energy Systems)...
The Selectmen s Cos Cob Power Plant Site Planning Committee. (2003). Plan for the Cos Cob Power Plant Site, final report to the Board of Selectmen. Town of Greenwich, CT, October 20. [Pg.352]

Some useful and pertinent information on atmospheric corrosion test site plans, hardware and other relevant information in the literature25 30 may be used in planning atmospheric corrosion testing program. [Pg.118]


See other pages where Site Planning is mentioned: [Pg.894]    [Pg.280]    [Pg.428]    [Pg.188]    [Pg.80]    [Pg.61]    [Pg.428]    [Pg.10]    [Pg.895]    [Pg.486]    [Pg.487]    [Pg.849]    [Pg.140]    [Pg.151]    [Pg.138]    [Pg.259]    [Pg.48]    [Pg.894]    [Pg.1119]    [Pg.16]    [Pg.17]    [Pg.47]    [Pg.224]    [Pg.344]    [Pg.344]    [Pg.345]   


SEARCH



Construction sites emergency plans

Creating the site quality plan

Emergency response plan site security

Environmental site characterization, planning

Facility planning site considerations

Planning a Site Investigation

Planning site controls

Planning test sites

Plant siting and layout plan layouts

Production single-site planning

Site Emergency Response Plan

Site Safety Supervision Plan System

Site characterization plan

Site plans

Site quality plan

Site related issues in emergency planning and accident management

Site remediation plans

Site safety plan

Site security plan

Site specific safety plan

Site-Specific Health and Safety Plan