Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Safety evaluation report

When the review progresses to the point that the staff concludes that the documentation is acceptable, a Safety Evaluation Report is prepared that represents a summary of the review and evaluation of the application by the staff. [Pg.19]

NRC (1994b). U.S. Nuclear Regulatory Commission. Safety Evaluation Report for the Claiborne Enrichment Center, Homer, Louisiana, NUREG-1491 (National Technical Information Service, Springfield, Virginia). [Pg.396]

The NRC is requested to conduct a review of the PSID and the companion submittals described in the Licensing Plan and document the conclusions of this review in a Preliminary Safety Evaluation Report. Following briefings and feedback from the Advisory Committee on Reactor Safeguards on the results of this review, the NRC is further requested to issue a summary statement, referred to herein as a Licensability Statement, which states the key conclusions of this review and which reaches conclusions as to whether the Standard MHTGR reactor concept is licensable. [Pg.27]

The licensing authority finally reaches a favorable Safety Evaluation Report which leads to the issuing of the construction permit of the HTR-10 test reactor... [Pg.160]

Williams, T L. King, J.N Wilson Draft Preapplication Safety Evaluation Report for the Modular High-Temperature Gas-Cooled Reactor NUREG-1338 March 1989... [Pg.162]

The NRC involved numerous experts to evaluate the safety concept and issued, in 1990, an unofficial Safety Evaluation Report (SER) with a rather positive statement on the licenseability of this concept. In 1988 GA and Bechtel had already performed preliminary analyses for design basis and beyond design basis accidents. The work for the structural, mechanical and electrical engineering was well beyond the conceptual design stage. [Pg.332]

NUREG-0852, "Safety Evaluation Report related to the final design of the Standard Nuclear Steam Supply Reference System CESSAR System 80", U.S. Nuclear Regulatory Commission, November 1981 and Supplements 1, 2, and 3 dated March 1983, September 1983 and December 1987, respectively. [Pg.371]

Safety Evaluation Report. Restart of K-Reactor. Savannah River Site. DOE/DP-0084T, U.S. Department of Ener, Washington, DC, April 1991. [Pg.230]

Safety Evaluation Report for Transition to Natural Circulation on Three Mile Island Nuclear Station Unit-2, Babcock and Wilcox Co. (Apr. 29,1979). [Pg.681]

In early November 2001, NRC published licensing criteria for disposal of SNF and HLW in the proposed geologic repository at Yucca Mountain. In June 2008, NRC received the license application from DOE. The NRC began winding down activity related to Yucca Mountain in October 2010 and ceased review activity at the end of September 2011. The NRC resumed work on its technical and environmental reviews of the Yucca Mountain application using available funds in response to an August 2013 ruling by the U.S. Court of Appeals for the District of Columbia Circuit. The staff completed and published the final volumes of the safety evaluation report in January 2015. [Pg.535]

After the NRC staff completes its review, it prepares a Safety Evaluation Report (SER) summarizing the anticipated effects of the proposed facility on public health and safety. [Pg.641]

The concept of the USQs was established to allow contractors to make physical and procedural changes and to conduct test and experiments without prior DOE (EXDE Order 5480.21) approval, as long as these changes did not explicitly or implicitly affect the authorization basis of the facility or result in a TSR change. The intent of this order was to provide contractors with the flexibility needed to conduct day-to-day operations and to require that those issues with a potential impact on the authorization basis, and, therefore, the safety of the facility be brought to the attention of DOE, thus maintaining the proper safety focus. The authorization basis is described in documents such as the facility safety analysis report, other safety analyses, hazard classification documents, the TSRs, DOE-issued safety evaluation reports, and facility-specific commitments made in compliance with DOE orders or policies. [Pg.664]

As of early September 1994, the NRC staff received all of the BWR licensee submittals in response to GL 94-03. The staff has completed its evaluations of the licensee responses and has transmitted the safety evaluation reports to the appropriate BWR licensees. The staff concluded that, for all cases, BWR licensees had provided sufficient justification to operate their facilities until core shroud inspections or repairs could be implemented. The staff based its conclusions on the following factors ... [Pg.56]

NUREG-0661, Mark-I containment long term programme safety evaluation report, US Nuclear Regulatory Commission, 1980. [Pg.212]

NUREG-1512, Final Safety Evaluation Report Related to Certifieation of the AP600 Standard Design, September 1998. [Pg.167]

XV-11] Draft pre-application safety evaluation report for the modular high temperature gas cooled reactor, NUREG-1338 (1995). [Pg.485]

The US Nuclear Regulatory Commission (NRC) Safety Evaluation Report (U.S. NRC, 2014) gives the criteria for risk assessment based on core damage frequency and the time scales for the use of safety and nonsafety systems, as derived from a full-scope Probabilistic Risk Assessment (PRA) analysis (Bhatt and Wachowiak, 2006). This NRC approach states the safety guidelines as follows ... [Pg.457]

U.S. NRC, United States Nuclear Regulatory Commission, 2014. Final safety evaluation report related to the certification of the economic simplified boiUng-water reactor standard design. NUREG-1966, ADAMS Accession number ML 14100A187. [Pg.539]

EPRI ALWR Utility Requirements Docmnent (Vol. II and III), and NRC Safety Evaluation Reports on URD (NUREG-1242)... [Pg.46]

Safety Evaluation Report Restart of K-Reactor Savannah River Site... [Pg.1]

Actions to be taken when less significant unacceptable performance is encountered are.discussed in administrative.instructions on specific topics. AI-121 "Safety Evaluation Report Assessment Program" (Reference 24), requires that the four SRSPO divisions provide the contractor with monthly inspection reports which track the findings from inspections in each division and specify the current status of each finding. These monthly inspection reports, which include the information from the individual walkthrough Inspections, are... [Pg.16]

Administrative Instruction 121, "Safety Evaluation Report Assessment Program."... [Pg.24]

WSRC, Memorandum ESH-HPC-910026, D. P. Potocik to R. L. Huskin, "Safety Evaluation Report (SER) Open Item Completion," January 24, 1991. [Pg.108]

All safety-related systems and systems important to safety shall be accurately described in accordance with the DOE- approved upgrade plan. This description shall include an appendix listing safety-related systems and components that meet the safety-related equipment list requirements of Safety Evaluation Report, Section 5.6. All WSRC organizations that have a direct inqjact on safety or safety reviews shall also be described. [Pg.111]

The seismic section of the Safety Evaluation Report (SER) has been divided into seven subsections Geology, Seismic Ground Motion, Geotechnical Engineering and Site Soil Conditions, System Response to Seismic Motion, Structures and Foundations, Piping, and Equipment. [Pg.172]


See other pages where Safety evaluation report is mentioned: [Pg.20]    [Pg.85]    [Pg.69]    [Pg.474]    [Pg.502]    [Pg.10]    [Pg.82]    [Pg.8]    [Pg.643]   
See also in sourсe #XX -- [ Pg.641 ]




SEARCH



Postmarketing Safety Evaluation Monitoring, Assessing, and Reporting of Adverse Drug Responses (ADRs)

Safety evaluation

Safety report

Safety reporting

© 2024 chempedia.info