Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Process buildings

New test, after these modification s, showed better measurements up to 350 m/min but now it also became evident that oil from the drawing process build up on the transducer surface and damped the signals and made measurements impossible. The oil build up as a combination of inspection length (m of tubes) and inspection speed. At lower drawing velocities (70 m/min) the oil obvious was washed away giving no inspection problems. The water system was modified as follows ... [Pg.899]

Whereas the OVD, PCVD, and MCVD processes build a refractive index profile layer by layer, the VAD process uses gaseous constituents in the flame to control the shape and temperature distribution across the face of the growing soot boule. [Pg.256]

Site development Process buildings Auxiliary buildings Nonprocess equipment... [Pg.864]

We expect to see, on the average, one small fire every month in this process building. [Pg.14]

The emergency action plan facilitates prompt evacuation of employees. Upon an alarm pcrsoimel evacuate to safe areas, cross or up wind if possible, assisting physically impaired people as necessary. Process buildings are not suitable refuges. [Pg.74]

The scope of lAT includes premises other than traditional industrial process buildings, such as hospitals underground car parks mining, railroad, and vehicle tunnels livestock buildings and other premises and processes. [Pg.3]

The preceding results can be extended to relate canopy-hood performance to opacity. This is a significant step because air pollution legislation in many countries has a reference to opacity levels (i.e., a fume concentration level which must be met at the point of discharge of fume from a process building), jations can be developed of this form ... [Pg.1281]

However, total quantities of hazardous materials do not, on their own, provide an entirely reliable measure of potential hazard. It is more useful to consider quantities of material within sections of the plant that can be isolated. The amount of material within these individual plant sections usually represents the largest credible release that could occur. Some examples of plant sections that may be isolated include tank farms, unloading racks, and separate process buildings. [Pg.102]

Chemical plants also consist of process buildings, storage and warehouse buildings, control houses, laboratories, and general offices. Depending on tlie nature of activity and tlie quality of the contents, tlie structural requirements and protection features will vary. Building standards are defined by the National Code of the American Insurance Association. [Pg.492]

Mathematical expressions can be derived to describe the kinetics of chain processes building on the ideas already discussed that such reactions take place in the well defined stages of initiation, propagation, and termination. [Pg.27]

The OSBL costs comprise land, site development, process buildings, auxiliary buildings, Storage buildings, equipment and construction for utilities including cooling towers, construction expenses, waste-disposal facilities, etc. The OSBL costs may be assumed to be about 20-40% of the ISBL costs, with the upper limit applying better to small batch plants. [Pg.456]

As a first step in the screening process, buildings can be removed from further consideration if the materials being handled, or the site conditions present, cannot produce these incident outcomes under any reasonable circumstances. Further, in some situations, the materials handled may not be present in sufficient quantities to result in an event of concern. Because some materials have the potential to produce one or more of the above incident outcomes, each possible incident outcome may need to be considered. [Pg.18]

The information requirements for each successive step in the screening process build upon those for the preceding steps. The user has the choice of collecting this information all at one time or in phases. Because the information necessary for the more detailed analyses, such as quantitative... [Pg.91]

During the screening process, building occupancy criteria help identify those buildings with sufficient occupancy to be of concern. This is a critical determination. Buildings that do not exceed the occupancy criteria can be... [Pg.130]

At least two escape routes for operators must be provided from each level in process buildings. [Pg.897]

NOTE The following factors are Battery Limit (process) buildings only and are expressed in per cent of the Building-Architectural Structural cost. They are not related to the Basic Equipment cost. [Pg.251]

Tejedor and coworkers have utilized a combination of two domino processes for a microwave-promoted synthesis of tetrasubstituted pyrroles [344]. The protocol combines two coupled domino processes the triethylamine-catalyzed synthesis of enol-protected propargylic alcohols and their sequential transformation into pyrroles through a spontaneous rearrangement from 1,3-oxazolidines (Scheme 6.183). Overall, these two linked and coupled domino processes build up two carbon-carbon bonds, two carbon-nitrogen bonds, and an aromatic ring in a regioselective and efficient manner. The tetrasubstituted pyrroles could be directly synthesized from the enol-protected propargylic alcohols and the primary amines by microwave irradia-... [Pg.225]

In colder climates, enclosures may be necessary to mitigate freeze-related hazards. In enclosed process buildings, additional fire protection features should be added to compensate for reduced ventilation and dissipation of flammable vapors, limited access for firefighting, and handling of runoff from spills. [Pg.235]

Within practical limits of plant and individual unit layout, the high point of grade should passthrough process buildings and areas, large equipment pads and centerlines of roadways and pipeways so that drainage will be away from these facilities and equipment. [Pg.239]

The s process builds up an abundance distribution with peaks at mass numbers (A = Z + N) 87,138 and 208 and pronounced even-odd imbalance. The main component of the s process is associated with thermal pulsations of stars in the asymptotic giant branch (1-3 Mq) which produce neutron densities between 10 and 10 cm (Fig. 5.6). [Pg.102]

JACADS, the first fully integrated baseline incineration system for the disposal of stockpiled chemical agent and munitions, is located on Johnston Island, part of the Johnston Atoll, approximately 800 miles southwest of Hawaii. The facility occupies 130 acres of the 625-acre island and includes one large process building, with three furnaces and auxiliary equipment. [Pg.22]

JACADS has one large process building where munitions are disassembled and their various components processed and incinerated in three combustion units. There are also a tall stack, auxiliary process off-gas trains, building HVAC eqnipment, and several auxiliary buildings. [Pg.27]

At first step ATP and three Na" ions bind to the inside of the membrane and the enzyme is phosphorylated. The product of the reaction undergoes a conformational change called eversion and brings the Na ions to the outside of the cell membrane. There three Na" ions are replaced by two K ions. The attachment of the K+ ions induces dephosphorylation and hydrolysis of ATP to ADP produces a conformational change that carries two K+ ions to the interior of the cell where they are released. The process builds up a charge gradient across the membrane because three Na" ions... [Pg.98]

The major problem for control based on material states, however, is the quality control culture that requires that parts be accepted based on adherence to a preset cycle within specified limits. Because state-based inferential control systems could theoretically come up with a new cure cycle every time, this sort of specification cannot be used with such systems. Specifications instead have to be in terms of the process plan used for the cure. The satisfactory completion of a certain cure history without alarm states would be assumed to produce an acceptable part. Once the culture was able to accept that difference for autoclave curing, production costs at the U.S. air force s McClellan AFB Logistic Center were substantially reduced [32], This type of specification could also give material review boards a head start on investigations because they would know that a part did not meet specification as well as what sorts of flaws might result from the deviation. The experience at McClellan is that there are fewer parts to review. It is even conceivable that, with improvements to sensors, much of the current postcure nondestructive evaluation used to verily the quality of parts could be incorporated into the process, building quality in rather than inspecting it in after the fact. [Pg.467]

Humidification As water (moisture) is a better conductor than air, humidification of the room where explosives are handled reduces the chances of accumulation of static charge. In many explosives process buildings, RH of about 60 to 65% is invariably maintained. [Pg.434]

Fortunately, the reaction rates of many important processes can be obtained without a full molecular dynamics simulation. Most reaction rate theories for elementary processes build upon the ideas introduced in the so-called transition state theory [88-90]. We shall focus on this theory here, particularly because it (and its harmonic approximation, HTST) has been shown to yield reliable results for elementary processes at surfaces. [Pg.288]

However, biomagnification factors significantly different from 1 may also reflect real processes building up the effective concentrations in a given organism s tissues. Said more accurately, the chemical activity or fugacity of the compound may prove to be greater as one moves up the food chain ... [Pg.367]

Milton Denekas. The implication of the relation of crude oil composition to a Fischer-Tropsch product is that oil has been produced by a synthetic process (building-up) rather than by a degradative process. Can you assume that the products from coal pyrolysis are also produced by a synthetic building-up) process rather than by degradation ... [Pg.47]


See other pages where Process buildings is mentioned: [Pg.237]    [Pg.299]    [Pg.863]    [Pg.869]    [Pg.32]    [Pg.412]    [Pg.314]    [Pg.91]    [Pg.251]    [Pg.3]    [Pg.149]    [Pg.468]    [Pg.468]    [Pg.260]    [Pg.19]    [Pg.145]    [Pg.552]    [Pg.429]    [Pg.299]    [Pg.274]    [Pg.6]   
See also in sourсe #XX -- [ Pg.243 ]




SEARCH



Additive building process

Before Building the Process Flowsheet

Building and Process Parameters that Influence the Ventilation System

Building process simulation

Design factors, process plant building

Explosion process plant building safety guidelines

Key Factors to Consider in Process Plant Building Risk Assessments

Process interface buildings

Process plant building safety

Process water building

Processes, building quality into

Reducing Risk to Buildings in Process Plants

Requirements Due to Building Construction, Equipment, Processes, Type of Production Premises

Risk to Process Plant Buildings

Risk, process plant building safety

Siting factors, process plant building

Summary of the Model Building Process

The Building of Horizontal Supply Chain Processes

Use a Proven Process and Build on Basic Values

Vehicle build process

Ventilation Parameters That Influence the Building Construction and Process Design

Warehouse Inspection Process The Building and Industrial Trucks

© 2024 chempedia.info