Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Installation steps

To begin the installation, click Continue. Setup will then copy some more files your to computer while it builds the Setup Wizard. The Windows 95 Setup Wizard guides you through the installation step by step. At each step, you will be asked questions about how you would like Windows 95 configured. Then you simply click the Next or Continue button. [Pg.533]

Step 2 - Total CO2 emission needs in 2005-2007 Step 3 - Split emissions between existing and new installations Step 4 - Early action and cogeneration bonuses Step 5 - Budget for unidentified installations and other needs. Figure 12.6 represents Poland s NAP preparation process and highlights the main budgets aggregated at the level of all ETS sectors. [Pg.325]

Several mock-ups were used to verify the assembly and installation steps (Fig. 15.43) ... [Pg.458]

Caution Shut off and lock out all power to the equipment so that it cannot be started accidentally during these installation steps. Failure to do so can result in serious personal injury. [Pg.601]

Figure 3.13 Installation steps (a) lightweight pipe is hand-carried into the host pipe, (h) beveled end, (c) fabric band is saturated to complete the joint, and (d) small annular space between the liner and host pipe can be grouted. Figure 3.13 Installation steps (a) lightweight pipe is hand-carried into the host pipe, (h) beveled end, (c) fabric band is saturated to complete the joint, and (d) small annular space between the liner and host pipe can be grouted.
WulffProcess. The regenerative technique is best exemplified by the Wulff process, Hcensed by Union Carbide Corp. The furnace consists basically of two masses of high purity alumina refractory tile having cylindrical channels for gas flow and separated by a central combustion space as shown in Figure 10. Its cychc operation has four distinct steps, each of approximately 1 min in duration, the sequence being pyrolysis and heat in one direction followed by pyrolysis and heat in the other direction. Continuity of output is achieved by paired installations. [Pg.389]

For hi -pressure installations, it is possible to balance partially or fully the hydrostatic force on the rotating member of an internal seal by using a stepped shaft or shaft sleeve (Fig. 10-113). This method of... [Pg.941]

The number of speed reduetions is another way to classify conveyor drives. Most common of the speed-reduction methods is the two-step system, in which the motor is coupled to a speed reducer and the slow-speed shaft of the reducer is connected to the conveyor-drive shaft by a V belt or a roller chain. The second reduction not only permits the use of a simpler speed reducer but also allows a more flexible layout of the motor and reducer mounting plate. On many installations this eliminates the need for a specially designed drive mount. [Pg.1913]

Although a mass-flow bin is obviously preferable to a funnel-flow vessel, the additional investment generally required must be justified. Often, this can be done by the reduced operating costs. But when installation space is limited, a compromise must be made, such as providing a special hopper design and sometimes even a feeder. Certainly, with mass-flow bins the feeder is not required for flow, but it might still be used for other reasons, such as conveying the material to the next process step. [Pg.1935]

Unit layout as installed is the next step of preparation. This may take some effort if analysts have not been involvea with the unit prior to the plant-performance analysis. The equipment in the plant should correspond to that shown on the PFDs and P IDs. Wmere differences are found, analysts must seek explanations. While a hne-by-line trace is not required, details of the equipment installation and condition must be understood. It is particularly useful to correlate the sample and measurement locations and the bypasses shown on the P IDs to those ac tuaUy piped in the unit. Gas vents and liquid (particularly water-phase) discharges may have been added to the unit based on operating experience out not shown on the P IDs. While these flows may ultimately be small within the context of plant-performance an ysis, they may have sufficient impact to alter conclusions regarding trace component flows, particularly those that have a tendency to build in a process. [Pg.2553]

The molybdenum, tungsten and tantalum concentration influence on LCD nickel-ferrous HRS resistance, used for gas turbine installations parts is investigated. The tests were carried out on modeling compositions. Samples were molded on the basis of an alloy of the ZMI-3C. The concentration of tantalum varied from 0 up to 5% with a step of 0,5%. The contents of elements were determined by a spectral method. [Pg.437]

Purchase and install instrumentation whose resolution is high enough for the most sensitive process/step... [Pg.120]

Operator makes a Sign off of critical steps (double checking) sequential error, Install permissive interlocks to ensure key Omits steps steps are done in proper order Repeats steps Automate process steps Executes in wrong order CCPS G-15 CCPS G-32... [Pg.136]

After the final designs are complete it is recommended that the actual touch (actual) and step voltage (actual) are rechecked for both power plant and switchyard areas separately, to ensure that they are within the tolerable limits as determined above. After the ground stations have been finally installed the actual step and touch voltages must be measured to verify the designs. [Pg.716]


See other pages where Installation steps is mentioned: [Pg.547]    [Pg.393]    [Pg.243]    [Pg.246]    [Pg.359]    [Pg.716]    [Pg.72]    [Pg.547]    [Pg.393]    [Pg.243]    [Pg.246]    [Pg.359]    [Pg.716]    [Pg.72]    [Pg.250]    [Pg.129]    [Pg.129]    [Pg.885]    [Pg.78]    [Pg.315]    [Pg.422]    [Pg.371]    [Pg.382]    [Pg.383]    [Pg.488]    [Pg.252]    [Pg.119]    [Pg.23]    [Pg.27]    [Pg.320]    [Pg.332]    [Pg.875]    [Pg.1750]    [Pg.1873]    [Pg.1964]    [Pg.2028]    [Pg.2170]    [Pg.2170]    [Pg.2419]    [Pg.2563]    [Pg.425]    [Pg.503]   
See also in sourсe #XX -- [ Pg.328 ]




SEARCH



Installation qualification steps

Step 5 SIS Installation, Commissioning, Validation

© 2024 chempedia.info