Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Inspection study-based

If the PA reveals that a contamination problem exists, but does not pose an immediate threat that warrants a removal, U.S. EPA will continue to study the site during a site inspection (SI). Based on data collected during the PA and the SI, U.S. EPA will evaluate the site using the hazard... [Pg.468]

Test- or Study-based, that is, to inspect thoroughly and meticulously a specific test, test method or study. [Pg.104]

It is important, whenever individual study-based inspections do not take place, that the QA statement must clearly describe the same. For instance, whether the inspection is related to process-based and when performed. The QA statement must also indicate that the final report was audited. [Pg.439]

It has to be recognised on the other hand that even in study-based inspections there is some element of process-based inspecting, since activities of a repetitive nature, like the application of the test item to the test animals in a chronic toxicity study, will only be inspected on a random basis once or a few times during the conduct of the study. While it is thus customary to assume that, for the purpose of covering phases which occur with a very high frequency within a single study, a limited number of inspections will be suffi-... [Pg.141]

In a way, this possibility to have process-based inspections for certain study types instead of study-based ones being performed by Quality Assurance may have seemingly been contradicted by the GLP Regulations of the US... [Pg.144]

There is another point that has to be taken into account by Quality Assurance when writing (or by the Regulatory Authority when reading) a Quality Assurance statement. The format of the Quality Assurance statement will be specific to the nature of the study and thus of the final study report. While it is required for all studies that the statement include on the one hand the full study identification and on the other the dates of relevant Quality Assurance monitoring activities, these latter may be of a variable nature with respect to their connection to the study. For example in the case of short-term studies, where single or repeated inspections for each study are inefficient or impractical, where thus individual study-based inspections have not been part of the Quality Assurance activities, and where therefore the Quality Assurance statement is referring to process-based inspections only, details of the monitoring inspections that did take place must be included. These should demonstrate that Quality Assurance did in fact monitor the critical phases of... [Pg.165]

This latter point might best be illustrated by the case of the Quality Assurance SOP on inspections. Quality Assurance has the possibility to perform facility-based, study-based and process-based inspections, as has been described in detail in section 4.2 (see page 138). In writing the respective SOPs, it will be insufficient, however, to provide only a description on how such inspections will be performed. This is to say that describing the standard way of performing these inspections will only represent one part of the necessary information to be given in these SOPs. As important as the how should be the when . Thus, the respective SOPs of the Quality Assurance will have to consist of the following parts ... [Pg.254]

Applicability Facility-based inspections will be performed at regular intervals of about x months independent of specific studies. Study-based inspections wiU be performed within the time limits specified by the master schedule and the single inspections will be set according to the defined critical phases of the studies. Process-based inspections will be conducted at regular intervals (of about x months, or for each yth study) for those study types that fulfil the following conditions ... ... [Pg.255]

Qualitative analysis of a process unit is the starting point for any plant- or unit-wide risk based inspection study. It can be carried out while the equipment is in operation and comprises four main steps. To ensure uniformity of treatment and coverage of all aspects, a formal workbook or appropriate software is used to identify, record and analyse the necessary data. [Pg.20]

For the French plants additional measurements campaign were launched on some units, and studies based on mockups and stress analysis were performed. As a result, in-service inspection was improved and surveillance procedures modified. [Pg.79]

For the purpose of the demonstration, a case study of a typical wind farm is defined. A detailed model is built that accounts for numerous operational, cost and maintenance parameters. The ApmOptimizer optimization modules are then implemented for optimizing the preventive maintenance, periodical inspections, condition-based maintenance, and spares levels. Starting from a baseline scenario, several optimization steps are investigated, following a typical RAM/LCC analysis assessment procedure Operational AvaUabiUty, Operational Downtime, Lifecycle O M Costs and produced Energy are used as the main metrics. The optimal maintenance strategy is obtained from an exact optimization process and not from Monte Carlo simulations that can provide only an approximate assessment for a user-inputted strategy. [Pg.1249]

PVDE is a nontoxic resin and may be safely used in articles intended for repeated contact with food (190). Based on studies under controked conditions, including acute oral, systemic, subchronic, and subacute contact implantation and tissue culture tests, no adverse toxicological or biological response has been found in test animals (191,192). PVDE is acceptable for use in processing and storage areas in contact with meat or poultry products prepared under federal inspection and it complies with the 3-A sanitary standards for dairy equipment. [Pg.388]

Two linear columns from Showa Denko, Shodex SB-806M and Shodex SB-806MHQ, and two linear columns from TosoHaas, TSK GM-PWxl and TSK GM-PW, were evaluated. Prior to the evaluation, the number of theoretical plates for Shodex SB-806MHQ, SB-806M, PWxl, and PW was determined to be 15,100, 15,700, 11,390, and 4710, respectively, as per manufacturer inspection. The lower plate count of the TSK PW column is due to the larger particle size of this column. Two mobile phases, water with 0.1 M LiNOi and 50 50 methanol/water (v/v) with 0.1 M LiNOi, were used for each of the four columns. These four columns were new and only PEO and PVP were analyzed with these columns in this study. Waters Ultrahydrogel columns have also been used in this laboratory. However, Ultrahydrogel columns are exactly the same as the TSK GM-PWxl columns based on the calibrations curves supplied by the manufacturers and by the pyrolysis GC data discussed later. [Pg.501]

Inspection and tolerance Inspection variations are often the most critical and most overlooked aspect of the tolerance of a fabricated product. Designers and processors base their development decisions on inspection readings, but they rarely determine the tolerances associated with these readings. The inspection variations may themselves be greater than the tolerances for the characteristics being measured, but without having a study of the inspection method capability this can go unnoticed. [Pg.443]

In this section, a number of case studies (Table 5) in which different types of VS methods are combined into a hybrid workflow. Often these combine a fast, ligand or pharmacophore-based method with a later docking method. The latter is useful at the inspection stage as it allows the molecule to be reviewed within the context of the protein binding site. A poor binding pose can be an indicator of a poor fit. Furthermore, possible interactions outside the scope of the molecules used to train the ligand-based method can be identified. [Pg.109]

Lobato19 studies the direct control of drag prices in Spain based on the difficulty of inspecting costs it is complicated to allocate fixed costs and estimate the size of the market for each product. Revisions of authorized prices to make up for inflation would have been insufficient. The main conclusion is the... [Pg.224]


See other pages where Inspection study-based is mentioned: [Pg.103]    [Pg.80]    [Pg.109]    [Pg.98]    [Pg.141]    [Pg.143]    [Pg.149]    [Pg.301]    [Pg.427]    [Pg.541]    [Pg.385]    [Pg.45]    [Pg.407]    [Pg.132]    [Pg.418]    [Pg.507]    [Pg.1322]    [Pg.236]    [Pg.79]    [Pg.392]    [Pg.269]    [Pg.174]    [Pg.195]    [Pg.77]    [Pg.251]    [Pg.102]    [Pg.102]    [Pg.107]    [Pg.108]    [Pg.109]    [Pg.77]    [Pg.586]    [Pg.122]    [Pg.202]    [Pg.74]   
See also in sourсe #XX -- [ Pg.39 , Pg.141 , Pg.149 ]




SEARCH



Base studies

© 2024 chempedia.info