Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Facility considerations

The likelihood (probability) of an accidental release based on tlie history of current conditions and controls at tlie facility, consideration of any unusual environmental conditions (e.g., areas in flood plains), or tlie possibility of simultaneous emergency incidents (e.g., flooding or fire liazards resulting in tlie release of hazardous materials). [Pg.513]

W. B. McCool, Secretary of the United States Atomic Energy Commission, Proposed Rule Making lOCFR Part 50 Licensing of Production and Utilization Facilities Consideration of Accidents in Implementation of the National Environmental Policy Act of 1969, Fed. Register 36, No. 231 (1971). [Pg.69]

Einolf, D.M., Menghini, L., 2007. Acquisition of the PSM-Subject Facility Considerations in Due Diligence. [Pg.770]

Whether or not an MFC is installed at a facility, consideration should be given to the appropriate use of an isolation transformer near a sensitive load. [Pg.1232]

In designing test racks and exposure facilities, consideration must be given to handling of the test racks. In many cases, material handling equipment will not be provided and the racks will be handled by hand. The total weight of the rack plus... [Pg.172]

The case studies are representative of the technology/pretreatment combinations shown in Table 15.1. The review describes the current layout and process of each facility. Consideration is given to the processing routes, shown in Figure 15.3, addressing optimal situations and possible margins of optimisation. [Pg.540]

The "Guide for Safety Design of Light Water Nuclear Power Facilities consideration the following ... [Pg.161]

The non-hydrocarbon components of crude oil may be small in volume percent, typically less than 1 %, but their influence on the product quality and the processing requirements can be considerable. It is therefore important to identify the presence of these components as early as possible, and certainly before the field development planning stage, to enable the appropriate choice of processing facilities and materials of construction to be made. [Pg.93]

Where space and weight are considerations (such as on an offshore facility) plate separators may be used to dehydrate crude to evacuation specification. Packs of plates are used to accelerate extraction of the water phase by intercepting water droplets with... [Pg.247]

In Section 10.0, we have discussed process design and processing equipment rather than the layout oi production facilities. Once a process scheme has been defined, the fashion in which equipment and plant is located is determined partly by transportation considerations (e.g. pipeline specifications) but also by the surface environment. [Pg.259]

The service provided by maintenance engineering was traditionally that of repairing equipment items when they failed. This is no longer the case, and a maintenance department is now pro-active rather than reactive in its approach. Maintenance of equipment items will be an important consideration in the FDP, because the mode and cost of maintaining equipment plays an important part in the facilities design and in the mode of operation. [Pg.286]

Maintenance Considerations during Facility Construction or Renovation... [Pg.441]

The rate (kinetics) and the completeness (fraction dissolved) of oxide fuel dissolution is an inverse function of fuel bum-up (16—18). This phenomenon becomes a significant concern in the dissolution of high bum-up MO fuels (19). The insoluble soHds are removed from the dissolver solution by either filtration or centrifugation prior to solvent extraction. Both financial considerations and the need for safeguards make accounting for the fissile content of the insoluble soHds an important challenge for the commercial reprocessor. If hydrofluoric acid is required to assist in the dissolution, the excess fluoride ion must be complexed with aluminum nitrate to minimize corrosion to the stainless steel used throughout the facility. Also, uranium fluoride complexes are inextractable and formation of them needs to be prevented. [Pg.204]

Physical Properties. Both (1) and (2) are weak bases, showing 4.94 and 5.40, respectively. Their facile formation of crystalline salts with either inorganic or organic acids and complexes with Lewis acids is in each case of considerable interest. Selected physical data for quinoline and isoquinoline are given in Table 1. Reference 4 greatly expands the range of data treated and adds to them substantially. [Pg.389]

Environmental Factors These inchrde (I) eqrripment location, (2) available space, (3) ambient conditions, (4) availabuity of adeqrrate rrtilities (i.e., power, water, etc.) and ancillary-system facilities (i.e., waste treatment and disposal, etc.), (5) maximrrm aUowable emission (air polhrtion codes), (6) aesthetic considerations (i.e., visible steam or water-vapor phrme, etc.), (7) contribrrtions of the air-poUrrtion-control system to wastewater and land poUrrtion, and (8) contribrrtion of the air-poUrrtion-control system to plant noise levels. [Pg.2179]

API Publ 2510A, Fire Protection Considerations for the Design and Operation of Liquefied Petroleum Gas (LPG) Storage Facilities, 2nd ed., December 1996... [Pg.144]

The contract can specify the amount of time the client needs to remove its materials from the toller s facility and lays out notification procedures for dissolving the contract. Chapter 6, Closure and Audit, Example 6-1 is a sample contract termination checklist. It is an illustration of one company s inventoiy list for closing out a tolling project. It addresses material, financial, legal and environmental considerations. [Pg.66]


See other pages where Facility considerations is mentioned: [Pg.356]    [Pg.449]    [Pg.75]    [Pg.18]    [Pg.44]    [Pg.3]    [Pg.10]    [Pg.133]    [Pg.851]    [Pg.36]    [Pg.679]    [Pg.59]    [Pg.238]    [Pg.356]    [Pg.449]    [Pg.75]    [Pg.18]    [Pg.44]    [Pg.3]    [Pg.10]    [Pg.133]    [Pg.851]    [Pg.36]    [Pg.679]    [Pg.59]    [Pg.238]    [Pg.182]    [Pg.235]    [Pg.362]    [Pg.598]    [Pg.725]    [Pg.101]    [Pg.229]    [Pg.441]    [Pg.443]    [Pg.354]    [Pg.100]    [Pg.116]    [Pg.2155]    [Pg.2163]    [Pg.2273]    [Pg.5]    [Pg.27]    [Pg.36]   


SEARCH



Engineering Considerations in the Facility Investigation

Facility planning site considerations

In Design Considerations for Toxic Chemical and Explosives Facilities Scott

Processing facilities size considerations

Toxic chemical facilities, design considerations

© 2024 chempedia.info