Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Construction works

The development and improvement of scientific-technical level of NDT and TD means for safety issues is connected with the necessity to find additional investments that must be taken into account at the stage of new technogenic objects designing, when solving new arising problems in social, economic, ecological and medical safety. It is not accidental, that the expenses for safe nuclear power plants operation cover 50% of total sum for construction work capital investments. That is why the investments for NDT and TD have to cover 10% of total amount for development and manufacturing of any product. [Pg.915]

In practice there are two major classifications of cost accounting systems, job costing and process costing. In the former, costs are col-lec ted for each job or batch irrespective of the accounting period. This system is normally used in construction work. Process costing is normally used in continuous and semicontinuous processes. Costs are collected for a specific accounting period. [Pg.846]

Telephones Allowance for modifications and extra construction work during startup... [Pg.863]

Actual progress made with construction work can be indicated on the bar chart by filhng in the open bars according to the percentage toward completion. Comparison of the actual progress bar for the whole project with the cumulative labor-hour curve indicates whether the job is ahead of schedule or not. If corrective action is required, effort should be concentrated on the key or critical items. [Pg.876]

Regulations have been adopted by federal, state, and local agencies to implement the legislation. Before any design and construction work is undertaken, these regulations must be monitored due to continuous... [Pg.2231]

HS(Gjl68 Fire safety m construction work guidance for clients, designers and those managing and carrying... [Pg.576]

Mobile exhaust or supply systems also include portable systems—for example, the systems consisting of a fan and a flexible tube used in construction work, either for exhausting or supplying air in work areas without any ventilation system. The work area must have some type of connection, such as windows, to the surroundings. [Pg.811]

The man removing the slip-plate was killed. It was unrealistic to expect a foreman to look after normal operations and simultaneously supervise construction work at a distant site. [Pg.143]

Baueisen, n. structural iron, bauen, v.t. bmld, construct work, cultivate. Bauer, m. builder farmer, peasant jack cage. Bauerde, /. (tillable) soil. [Pg.58]

That the requirements imposed by the notice are more onerous than those for the time being in force in relation to the noise to which the notice relates of (a) Any notice under Section 60 or 66 or (b) Any consent given under Section 61 or 6 or (c) Any determination made under Section 67. Section 60 relates to a construction site notice. Section 61 is consent for construction works. Sections 65-67 relate to noise-abatement zones (see below). [Pg.656]

The use of access equipment should meet the acceptable standards as laid down in the Construction (Working Places) Regulations 1966. [Pg.1063]

Soil surveys relating to construction work require samples from at least the depth of excavation water seepage may cause cross-contamination of land. Some guidelines for the classification of contaminated soils are summarized in Table 13.11 some materials are difficult to dispose of safely on land (Table 13.12). [Pg.345]

Extensive testing was also carried out to assess future hazards for human habitation and residential use of the area. This testing was carried out in an extensive program funded by EPA In 1980-81 after remedial drainage construction work at the Canal was complete (O. All of the survey design and technical laboratory problems described above were encountered in this program. Despite extensive efforts to meet requirements for sample size and distribution, to provide for adequate control sampling away from the Canal area, and... [Pg.13]

Abstract. Energy Pile System uses building foundation piles as ground heat exchangers. For the new building at Sapporo City University steel foundation pile is decided to be used with the HVAC system. The construction work started in January 2005. Total of 51 steel pipes have been screwed. The paper gives the results from performance analysis and construction phases of the project. [Pg.245]

This construction works because G is free and we are dealing with free interpretations. When we come to a test we can nondeterministically select either path - seme free interpretation will take either path. The final output under any free interpretation must be either f. -.f x for some input variable x or else for some constant o. In the first case, G guesses this will... [Pg.69]

All construction work performed on piping systems in accordance with the requirements of this Code shall be done in accordance with construction specifications which shall cover all phases of the work, and shall be in sufficient detail to cover the requirements of this Code. [Pg.152]

Suitable above-ground marking of the pipeline to prevent damages resulting from construction work,... [Pg.174]

Other compounds to be investigated include the ni-V compounds, such as In As, InP, and GaAs [155,157,252,253]. The stability of these compounds in aqueous solutions is questionable, but with relatively simple modifications in the hardware a system where potential control is maintained during the whole deposition can be constructed. Work is underway to deposit the Zn-based n-VI compounds as well [279], and initial work has been encouraging. [Pg.194]

This construction works even in the case X = C. Although is non-compact, we also have an appropriate analytical package, i.e. the weighted Sobolev space (see e.g., [61] for detail). In this case, we must consider the framed moduli space, which means that we take a quotient by a group of gauge transformations converging to the identity at the end of X. In other words, if we consider the one point compactification U oo, then... [Pg.38]

The traditional constructability work process includes the following characteristics ... [Pg.50]

Identifies value improvements and their benefits above those already being considered by the traditional constructability work process... [Pg.51]

Industrial processes, such as mUling and mining, construction work, and the burning of wood or fossil fuel, generate particulates that can be directly toxic or can serve as vectors for the transfer of bound material, such as sulfuric acid, metals, and hydrocarbons, into the lungs. Natural products such as pollen, anthrax spores, and animal dander can elicit toxic reactions on inhalation or skin contact. The inhalation of asbestos, silica, or coal dust can cause pneumoconiosis, which may develop into serious lung disease. The size of the particle, ventilatory rate, and depth of breathing will determine the extent of pulmonary deposition. [Pg.67]

Batching and mixing plants encountered in construction work vary over a wide range. The plants may be large-capacity, fully automatic plants with several stationary mixers they may be small portable, manually operated... [Pg.549]


See other pages where Construction works is mentioned: [Pg.240]    [Pg.2162]    [Pg.427]    [Pg.132]    [Pg.576]    [Pg.1]    [Pg.576]    [Pg.13]    [Pg.246]    [Pg.42]    [Pg.5]    [Pg.361]    [Pg.710]    [Pg.174]    [Pg.540]    [Pg.543]    [Pg.576]    [Pg.165]    [Pg.82]    [Pg.46]    [Pg.250]    [Pg.194]    [Pg.298]    [Pg.299]   
See also in sourсe #XX -- [ Pg.141 ]




SEARCH



© 2024 chempedia.info