Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Control systems commissioning

A special study [74] was commissioned by the American Petroleum Institute (API) entitled Mitigation of Explosion Hazards of Marine Vapor Control Systems. The report examines the effects of deflagradons and detonations in pipes in the region of detonation flame arrestors. The primary objective was to resolve potential... [Pg.480]

High-pressure cut-outs are fitted to all hut the smallest of systems. The compressor outlet pressure is brought to one side of a bellows or diaphragm, and balanced by an adjustable spring. A scale on the control indicates the pressure setting to commercial accuracy and is checked on commissioning the system. [Pg.105]

More than 100 Governments have responded to a request of the Commission on Narcotic Drugs to provide the Board with information on their legitimate requirements for precursor chemicals used in the manufacture of amphetamine-type stimulants. The responses received provide valuable input for the establishment of a voluntary, comprehensive and accurate control system for those chemicals. [Pg.86]

The object of loop testing is to ensure that all instmmentation components in a loop are in full operational order when connected together and are in a state ready for process commissioning and validation (Operational Qualification [OQ] and Performance Qnalification PA2])- Loop testing also encompasses the integration of instrumentation with any associated compnterized control systems. [Pg.565]

The European Commission s Food and Veterinary Office carries out Community controls in the Member States and in third countries in order to check their national control systems. On food contact materials, until now, desk studies on the systems in place have been performed. [Pg.54]

Most basic validation activities within the cGMP pilot plant are identical to those expected in practice in a manufacturing facility. A validation master plan should be developed that addresses the design specifications and qualification, installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ) of all major utility systems, process equipment, and computer control systems. Installation and commissioning data should be retained as part of an engineering documentation package. A workable... [Pg.2886]

Manual control systems, where used, should be set up during commissioning and should not change unless other system conditions change. [Pg.66]

Considerable work was done prior to commissioning on the MTG reactor control system and the cooling water system. Simulation code was written for the MTG control to model the heat/mass transfer effects during reactor switching and various trip scenarios. As a result no serious control problems have been experienced in the MTG plant. [Pg.717]

Received April 4, 1974. Work performed under the auspices of the U. S. Atomic Energy Commission and the Environmental Protection Agency, Office of Research and Monitoring, Control Systems Laboratory, Contract No. EPA-IAG-0199. [Pg.164]

H. Van Brussel, J. Wyns, P. Valckenaers, L. Bongaerts, P. Peeters, Reference architecture for holonic manufacturing systems PROSA, Computers in Industry. 37 (1998) 255-274. International Electrotechnical Commission, Enterprise-control system integration - Part 1 Models and terminology, lEC, Geneva, Switzerland, 2003. [Pg.156]

International Electrotechnical Commission [lEC] (1 ) 2005b. lEC 62061, Safety of machinery - Functional safety-related electrical, electronic and programmable electronic control systems. Geneva lEC International Electrotechnical Commission [lEC] (1 ) 2006. lEC 60770-3, Transmitters for use in industrial-process control systems Part 3. Geneva lEC International Electrotechnical Commission [lEC] (2 ) 2009. lEC 61508, Functional safety of electrical / electronic / programmable electronic safety-related systems — All parts. Geneva lEC... [Pg.1481]

In 2003 the UK Health and Safety Executive estimated that almost half of the primary causes for control system failures lay with inadequate specifications (Ref 2). Other key causes were changes made after commissioning, overly optimistic reliance on single channel systems, failure to verify software and poor consideration of human issues. These are systematic failures. [Pg.233]

After evaluation and negotiations an agreement was signed with ABB in the end of June 2011. ABBs scope comprises delivery of hardware, control system, installation and commission for both hoisting systems. [Pg.480]

Volume IV covers support systems and commissioning. Chapter 10 discusses some chemical engineering principles required for design of a chlorine plant, and examples are provided explaining how these fundamental concepts are translated into practice. Instra-mentation and control systems required for the various unit operations are addressed in Chapter 11 and the utilities needed for mnning the plant are presented in Chapter 12. Details pertinent to plant commissioning and operation are treated in Chapter 13. [Pg.2]


See other pages where Control systems commissioning is mentioned: [Pg.18]    [Pg.97]    [Pg.277]    [Pg.74]    [Pg.247]    [Pg.152]    [Pg.32]    [Pg.193]    [Pg.32]    [Pg.287]    [Pg.73]    [Pg.907]    [Pg.274]    [Pg.325]    [Pg.234]    [Pg.723]    [Pg.361]    [Pg.769]    [Pg.912]    [Pg.14]    [Pg.22]    [Pg.492]    [Pg.101]    [Pg.106]    [Pg.174]    [Pg.239]    [Pg.465]    [Pg.713]    [Pg.10]    [Pg.2]    [Pg.31]    [Pg.1230]    [Pg.1239]    [Pg.1243]    [Pg.1256]   
See also in sourсe #XX -- [ Pg.1230 ]




SEARCH



System Commissioning

© 2024 chempedia.info