Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Additions to installations

In addition to installation of the C5,C5 -hydroxyls, removal of the C3,C3 -esters was needed to provide the substitution pattern of the natural products. However,... [Pg.168]

As shown in Scheme 33, the synthesis of the C1-C7 amide 160 began with a Hoppe crotyltitanation reaction between the aldehyde 17 and the (R)-crotyltitanium 163, prepared in situ (crotyl diisopropylcarbamate with sBuLi/(-)-sparteine/ Ti(0/Pr)4), to give O-enecarbamate 164 (>30 ldr) [166-169], Ozonolysis and HWE chain extension was followed by an Evans-Prunet 1,4-addition to install the C5-stereocentre to complete 160 [103], The synthesis of the C8-C14 subunit 161 started with an elegant installation of the C13-C14 (Z)-olefin. Deprotonation of the dihydrofuran 165, available in three steps from bromo alcohol 166, with fBuLi and transmetallation with Me2CuLi LiCN, and subsequent 1,2-cuprate transfer gave the... [Pg.45]

Most other approaches toward the title alkaloid featured Heck reactions [152], Claisen rearrangements [153], or Diels-Alder reactions [139, 154]— Mulzer s route is the only one so far that utilized a 1,4-cuprate addition to install... [Pg.457]

As solution gas drive reservoirs lose pressure, produced GORs increase and larger volumes of gas require processing. Oil production can become constrained by gas handling capacity, for example by the limited compression facilities. It may be possible to install additional equipment, but the added operating cost towards the end of field life is often unattractive, and may ultimately contribute to increased abandonment costs. [Pg.362]

The QAP system additionally was developped for inspection documentation purposes to meet the modern requirements in process documentation (ISO 9000). It is the basic system required to install a fully automated inspection by a camera system and image processing. [Pg.629]

At times, the process stream flow must be increased after the initial installation to satisfy production demands. Depending on the magnitude of the increase, the existing system may or may not be able to handle the added flow. If it can, regeneration frequency must increase. Adding more resin to the column is often considered an alternative to installing another column. Resin addition lessens the space for backwash and may be a cause for poor column performance. [Pg.383]

Explosion-welded constmction has equivalent or better properties than the more compHcated riveted systems. Peripheral benefits include weight savings and perfect electrical grounding. In addition to lower initial installation costs, the welded system requires tittle or no maintenance and, therefore minimizes life-cycle costs. Applications of stmctural transition joints include aluminum superstmctures that are welded to decks of naval vessels and commercial ships as illustrated in Figure 11. [Pg.151]

Waste Recovery, Inc. (WRJ) shreds tires for fuel at installations in Pordand, Oregon Adanta, Georgia MarsiU.es and Du Po, Illinois Conshohocla, Peimsylvania and Houston, Texas. Goodyear owns - 10% of WRJ. Firestone bums rejected tires in addition to other soHd wastes. [Pg.14]

Small Communities. Small communities and recent subdivision additions to larger communities, which have not yet been coimected to municipal coUection systems, must have a means of waste disposal. Septic tanks are a possibiHty, but require periodic servicing and cleaning. Furthermore, the soil is not always suitable for accepting the effluent. An alternative is the package plant. These units are commercially produced to serve small areas. They furnish primary treatment and some secondary treatment, and require only minimal operating supervision. Capacity can be varied as needs dictate. In general, pubHc health authorities prefer such installations instead of septic tanks. [Pg.282]

Evaporator may refer either to the type of constmction utilized or to the entire assemblage of equipment in a single installation. Thus a single multiple-effect evaporator may contain a number of effects of either the same or different evaporator types. An effect is a section of the evaporator heated by steam at one pressure and releasing vapor (water) at a lower pressure to another section. The term steam generally indicates the heat supply, whereas vapor means the material evaporated. Thus vapor from one effect becomes steam at the next effect. The term prime steam identifies the steam suppHed from an outside source to operate the evaporator (see also Steam). An effect may consist of several bodies, all operating at the same steam and vapor pressures. The purpose of more than one body in an effect may be to handle Hquor at different concentrations, or the result of size limitations or of additions to increase the capacity of an existing evaporator. [Pg.472]

Physical access. Subsequent to installation, maintenance personnel must have physical access to the measurement device for maintenance and cahbration. If additional structural facilities are required, they must be included in the installation costs. [Pg.759]

See Benedict, loc. cit., for a general equation for pressure loss for nozzles installed in pipes or with plenum inlets. Nozzles show higher loss than venturis. Permanent pressure loss for laminar flow depends on the Reynolds number in addition to p. For details, see Alvi, Sri-dharan, and Lakshamana Rao, J. Fluids Eng., 100, 299-307 (1978). [Pg.892]

For some applications, either steam or electricity is simply not available and this makes the decision. It is rarely economic to install a steam boiler just for tracing. Steam tracing is generally considered only when a boiler already exists or is going to be installed for some other primary purpose. Additional electric capacity can be provided in most situations for reasonable costs. It is considerably more expensive to supply steam from a long distance than it is to provide electricity. Unless steam is available close to the pipes being traced, the automatic choice is usually electric tracing. [Pg.1013]

In addition to using annuahzed cost comparisons in evaluating an air-poUution-control (APC) equipment installation, the impact of the 1990 Clean Air Act Amendments (CAAA) and resulting regulations also must be included in the evaluation. The CAAA prescribes specific pollution-control requirements for particular industries and locations. As an example, the CAAA requires that any major stationary source or... [Pg.2180]

In addition to the use of techniques to reduce nutrient run-off at source, entry of nutrients to lakes can be reduced by using pre-lake techniques. These include the use of artificial wetlands on inflow streams, the use of iron salt treatment in pre-lake lagoons or by installing treatment plants to remove phosphorus. [Pg.37]


See other pages where Additions to installations is mentioned: [Pg.133]    [Pg.87]    [Pg.34]    [Pg.133]    [Pg.115]    [Pg.123]    [Pg.22]    [Pg.748]    [Pg.57]    [Pg.133]    [Pg.87]    [Pg.34]    [Pg.133]    [Pg.115]    [Pg.123]    [Pg.22]    [Pg.748]    [Pg.57]    [Pg.332]    [Pg.389]    [Pg.582]    [Pg.190]    [Pg.314]    [Pg.490]    [Pg.473]    [Pg.513]    [Pg.54]    [Pg.559]    [Pg.216]    [Pg.405]    [Pg.493]    [Pg.220]    [Pg.195]    [Pg.297]    [Pg.411]    [Pg.24]    [Pg.261]    [Pg.326]    [Pg.148]    [Pg.1011]    [Pg.1939]    [Pg.2049]    [Pg.318]   
See also in sourсe #XX -- [ Pg.131 , Pg.163 , Pg.333 ]




SEARCH



© 2024 chempedia.info