Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Installation initiation

The largest outlet for the bituminous plastics has been for automobile battery boxes. Bituminous battery boxes do, however, have a susceptibility to electrical breakdown between the cells and in Europe their use has been mainly confined to the cheaper batteries installed initially in new cars. Bituminous compositions have also been used for toilet cisterns and to some extent for cheap containers. They are no longer important. [Pg.872]

The vendor supplied an unspecified case study that compared the costs of an existing pump-and-treat system with a pump-and-treat system that had been retrofitted to accommodate an FE ACTIVE. The projected life-cycle cost (adjusted for an inflation rate of 4% and a rate of interest of 5%) of the existing pump-and-treat system was calculated to be 3,930,000 (1996 dollars). The life-cycle cost (adjusted for a 4% inflation rate and a 5% interest rate) of the FE ACTIVE retrofit system was calculated at 945,000 (1996 dollars). Both estimates included capital costs, operation and maintenance expenses, and the cost of groundwater monitoring. Similarly, had the FE ACTIVE system been installed initially, its life-cycle cost would be 1,630,000 (1996 doUars). [Pg.591]

Qualification of equipment and validation of computer systems are not one-time events. They start with the definition of the product or project and setting user requirement specifications and cover the vendor selection process, installation, initial operation, ongoing use, and change control. [Pg.256]

Oilgas train Vessetsftrain Emulsion t/utmwit Condensate contact Test separator Gas compression. .. Vessels installed Initially. 2 x 100% trains 17 2 X 75% trains 2 vessels/train Future 1 X 100% rafrig. skM 1 vessel 2 x 75% train G + 1 refrig, skid... [Pg.27]

Plan B. although simpler, will require much higher levels of power generation installed initially and runs a risk of fracturing the reservoir, cre-... [Pg.30]

Because of the presence of hydrogen sulfide in Jay field crude oil, complex facilities, including oil stabilization, gas sweetening, and sulfur-recovery units, were required to produce salable oil and gas. To initiate field production and to provide extended well tests, a small 2.000-B/D facility was installed initially. As development drilling proceeded, 6.S00- and 12,000-B/D modules were built when and where needed. By using the modular-facility design concept, the field producing capacity was more than 00,000 B/D within 2V4 years of discovery. [Pg.68]

A Compressor Station located near the Karadag Gas Distribution Station. Two compressors will be installed initially, with space allowed for a further 4 machinery sets. [Pg.58]

Some installations, initially considered as new entrants, were existing installations." In addition, several requests for allowances were not considered in the initial allocation because they were submitted to the Autonomous Communities (AACC), rather than to the central government... [Pg.199]

The anodic protection technique now enables air coolers and tube bundles in sulfuric acid plants to be protected from corrosion reliably and economically. Anodic protection was provided for air coolers of sulfuric acid production plants for the first time in 1966. Since then, a combined cooler surface area exceeding 10,000 m in air-cooled and water-cooled sulfuric add plants has been protected in this way worldwide. The installed initial electrical direct current output of the potentiostats is >25 kW, corresponding to an energy requirement of 2.5 W/m for the surface needing protection (Kuron and Grafen 1988). [Pg.629]

These documents were all designed to support an audit of the system to answer questions about design, installation, initial operation, validation, and continued operations of a water system. However, since that time better and more appropriate methods have been made available to accomplish the same tasks, but in a more efficient manner. Cohen illustrates the use of electronic documentation approaches for accomplishing the same validation tasks, but in real-time. The improper use of the term revalidation limited the use of these real-time approaches, when in fact, as Cohen points out, what was intended was change control. In reality, what was meant to be accomplished was not revalidafion of the water system, but validating change controls. ... [Pg.250]

The study was set up to go through four test phases, each looking at critical metrics such as start-up time, time to full load and overall reliability. The four phases after installation, initial testing of safety systems, calibration and testing of the remote transmission of data were ... [Pg.93]

Bypass Loop Location Method Step Installed Initials Step Removed Initials... [Pg.77]


See other pages where Installation initiation is mentioned: [Pg.2328]    [Pg.802]    [Pg.115]    [Pg.2083]    [Pg.425]    [Pg.2332]    [Pg.11]    [Pg.181]    [Pg.33]    [Pg.1269]    [Pg.1476]   
See also in sourсe #XX -- [ Pg.330 ]




SEARCH



© 2024 chempedia.info