Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Projects safety

Review Policy The review policy should estabhsh when project safety reviews should be done. All capital projects, large or small, should have one or more safety reviews during the course of the project. The number and types of review shoiild be stated in a management policy. Any reasons for exceptions to the policy should oe documented as well. The policy should address not only projects internal to a company, but also any joint ventures or turnkey projects by outside firms. [Pg.2285]

Process improvements. Measure progress against previously identified goals. For example, if completing capital project safety reviews within two weeks of submittal was a facility s objective, is this now being achieved ... [Pg.154]

Involves a detail review of planning, design, procurement, fabrication, and installation functions to achieve the best overall project safety performance, lowest CAPEX, and the shortest reasonable schedule... [Pg.51]

For FTIH trials, all applications should include a summary of projected free plasma concentrations of the new active substance (NAS) in humans and a brief description of any pharmacokinetic modelling programs used to generate the estimates. A comparison with the concentrations obtained in the nonclinical toxicity studies and projected safety margins should be given. In the same section, an estimate of the extent of the intended pharmacological or pharmacodynamic response at the expected plasma concentrations should be included, with a list of the assumptions used in deriving that estimate. [Pg.509]

If a required team member is not available, the project manager shall determine with the concurrence of the project safety representative, if the review can be adequately accomplished without the designated member. In such cases, a substitute individual from the supplemental member list below, should usually be provided in his place. A review should not be undertaken if an operations representative or his delegate is unavailable. [Pg.10]

The general project safety design philosophy is defined as follows (in order of importance) ... [Pg.68]

PSM Project Safety Management - OSHA safety program. [Pg.352]

Direct and supervise the field inspectors and the project safety engineer. [Pg.359]

Data may be organized by type of data, such as adverse events, laboratory data, demography, physical exam, etc. Since many of these categories of data exist across clinical trials, standard file structures can be designed and implemented. This standardization allows for the reuse of validated software as well as facilitates the pooling of data across studies for use in project safety summaries and other data reporting across studies. [Pg.558]

Levi, H. W. Project Safety Studies Entsorgung in the Federal Republic of Germany, Proceedings of the Underground Disposal of Radioactive Waste, Helsinki, 1979. [Pg.625]

Fang, D., Wu, H. (2013) Development of a Safety Culture Interaction (SCI) model for construction projects. Safety Science, 57, 138-49. [Pg.187]

In the specific implementation of a safety audit project, safety audit project leader should be fully aware of the following circumstances, an initid assessment of the importance of this safety audit and audit risk (1) ask the audited entity related personnel and related management (2) access to the audited entity s operations manual, the internal control manual and other information (3) access to the audited entity annual production and safety plans, financial budget and other documents (4) check the safety activities or safety issues certificates and records (5) examine the audited unit production, business activities and the implementation of internal control (6) select the number of safety events to be tested. [Pg.1308]

Safety auditors should collect the following safety facilities and non-fmancial information related to the project (1) the written request for the project construction units (2) safety preassessment report (3) safety specific report and relevant documentation about project preliminary design (4) written approval of preliminary design safety fadhties of construction projects (5) the project completion report and related construction drawings (6) the safety assessment report (7) safety faciUties construction project completion and acceptance approval letter (8) technicd indicator information apphes to the audited entity s safety faciUties three simultaneous . Safety facilities "three simultaneous" can be audited by audit, supervision, observation, inquiry, confirmation, calculation, analysis and review and other conventional methods of audit. Due to the comprehensive and technology of safety audit project, safety auditors should also use cost-benefit analysis and economic evaluation of safety and other methods. [Pg.1309]

Szymberski, R. (1997). Construction project safety planning. Technical Association of the Pulp and Paper Industry (TAPPI) Journal, 80(11), 69-74. [Pg.298]

The safety Construction Project safety management organization intends to set up... [Pg.241]

Ale, B.J.M., L.J. Bellamy, R.M. Cooke, L.H.J. Goossens, A.R. Hale, A.L.C.Roelen, E. Smith (2006), Towards a causal model for airtransport safety - an ongoing research project, SAFETY SCIENCE, Volume 44, Issue 8, October 2006, Pages 657-673. [Pg.1107]

Hazard Analysis Techniques for Engineers A 4.5-day workshop for project, safety, and design engineers (See appendix for course outline and Figure 9-4 for course schedule.)... [Pg.95]

Sexton et al. (2011) CUSP Across one year ICUs in the Keystone ICU Project Safety Attitudes Questioimaire Safety culture improved from 43% to 52%... [Pg.294]


See other pages where Projects safety is mentioned: [Pg.2283]    [Pg.46]    [Pg.179]    [Pg.71]    [Pg.22]    [Pg.190]    [Pg.2038]    [Pg.2573]    [Pg.185]    [Pg.186]    [Pg.39]    [Pg.95]    [Pg.2553]    [Pg.2287]    [Pg.146]    [Pg.783]    [Pg.1308]    [Pg.1309]    [Pg.269]    [Pg.291]    [Pg.211]    [Pg.240]    [Pg.40]    [Pg.1508]    [Pg.20]   
See also in sourсe #XX -- [ Pg.81 ]

See also in sourсe #XX -- [ Pg.81 ]




SEARCH



Fire Safety for Revamp Projects

Hospital safety culture projects

International Criticality Safety Benchmark Evaluation Project

Nuclear Fuel Safety Project

Pre-Project Safety and Health Planning

Process Safety in Revamp Projects

Project Specific Safety and Health Plan

Project engineering functional safety assessment

Project engineering safety

Project or Production Safety Meeting

Project safety analysis

Project safety commitment

Project safety lifecycle

Suggested Safety Reviews During a Project Life

© 2024 chempedia.info