Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Construction drawings

It was not possible to relocate the number and positions of the ducts from the construction drawings (Fig. 7). [Pg.754]

Fig. 1-8 Constructional drawing of the Sammarang, which was the first ship to make a sea voyage to Nova Scotia from March 1824 to January 1825 with cathodic protection of the copper sheathing. Fig. 1-8 Constructional drawing of the Sammarang, which was the first ship to make a sea voyage to Nova Scotia from March 1824 to January 1825 with cathodic protection of the copper sheathing.
Typically inlet and outlet locations and heights can be obtained prior to ventilation system design from construction drawings. The static pressure difference across inlets and outlets can be calculated based on the height of the location (Fig. 7.104) and the air density at the respective height ... [Pg.590]

The construction of the symmetry-adapted operators and of the Hamiltonian operator of polyatomic molecules will be illustrated using the example of the benzene molecule. In order to do the construction, draw a figure corresponding to the geometric structure of the molecule (Figure 6.1). Number the degrees of freedom we wish to describe. [Pg.138]

Even before the optimum plant size was determined, a contractor had been selected and process design work was in progress. The contractor was selected on the basis of competitive cost plus fixed-fee bids. The contract was later converted to a turn-key type, based on the competitive-bid fixed-fee percentage and a definitive cost estimate for completion of the job. This saved about 2 months in over-all job completion time. Through duplication of equipment purchases and construction drawings, it was possible to reduce over-all completion time for three subsequent plants by as much as 8 months from the 17 months required for the first module (Fig. 2). About 29 months were required from Geld discovery to startup of the last Exxon treating facility. [Pg.69]

Construction drawing of the experimental container for the fumigation of material samples with hydrogen cyanide.266... [Pg.443]

Definitive estimates. Definitive cost estimates are the most time-consuming and difficult to prepare, but they are also the most accurate. These estimates require preparation of plot plans, detailed flow sheets, and preliminary construction drawings. Scale models are sometimes used. All material and equipment is listed and priced. The number of labor hours for each construction activity is estimated. Indirect field costs, such as crane rentals, costs of tools, and supervision, are also estimated. This type of estimate usually results in an accuracy of 5%. [Pg.307]

The August of 1942 was the month with the highest mortality in the entire history of the Auschwitz camp.163 Some 8,600 inmates died during that month alone, almost double as many as during the previous month (about 4,400 deaths). The first known evidence for the decision to erect three more crematoria is dated August 14, 1942 (which is the date given on the construction drawings no. [Pg.402]

Inspection of the plant to check that erected facilities conform to flow diagrams, construction drawings, vendor drawings, and the specifications. [Pg.468]

At some point in construction, draw the wires into the box through the brass ports, then seal these ports with epoxy or silicone. Flow the epoxy or silicone into the brass fittings around the wires so that no gaps allow air to enter or leave the system. This can be a bit tricky and may take several times to get it tightly sealed. [Pg.274]

Cost for preparing estimates contemplates no alternative studies and will not result in any construction drawings and specifications. Does not inclmle cost of preparing available information on subsoil investigations to determine soil-bearing values. [Pg.193]

The conventional fixed bid method of delivery project approach is characterized by a clear separation between the design phase and the construction phase. The owner hires an architect/engineering firm (A E) that turns the functional requirements of the building into a detailed set of construction drawings and specifications. These drawings and specifications, as well as schedule requirements and special conditions, become the basis of a request for proposal (RFP) that is issued to general contractors (GC) for bids. Bids are received and evaluated and a fixed price or lump sum contract is awarded to a GC. The GC purchases materials and awards subcontracts as required to satisfy his obligations as detailed in the contract documents. [Pg.1492]

Construction drawings and specifications are very complete and depict in detail how the project is to be constructed prior to breaking ground. [Pg.1492]

Safety auditors should collect the following safety facilities and non-fmancial information related to the project (1) the written request for the project construction units (2) safety preassessment report (3) safety specific report and relevant documentation about project preliminary design (4) written approval of preliminary design safety fadhties of construction projects (5) the project completion report and related construction drawings (6) the safety assessment report (7) safety faciUties construction project completion and acceptance approval letter (8) technicd indicator information apphes to the audited entity s safety faciUties three simultaneous . Safety facilities "three simultaneous" can be audited by audit, supervision, observation, inquiry, confirmation, calculation, analysis and review and other conventional methods of audit. Due to the comprehensive and technology of safety audit project, safety auditors should also use cost-benefit analysis and economic evaluation of safety and other methods. [Pg.1309]

A cover survey requires the location of the rebars three dimensionally, that is, their position with regard to each other and the plane of the surface (X, Y) and depth from the surface (Z). If construction drawings are not available then it may be necessary to measure the rebar diameter as well as its location. [Pg.42]

A detailed review of existing equipment s design and construction drawings will also provide insights into various equipment and plot limitations. For example, increased feed rate, improper internals and level controls can adversely affect a separator s efficiency. A review of these details in the existing separators will be very useful for revamp projects. Similarly, careful review of column internal details is required to check possible modification to increase capacity/efficiency and reduce flooding/weeping. [Pg.26]

The general design of the reactor is shown in Figs. 2.A C, and D which are a north-south vertical section, an east-west vertical section, a horizontal section, and ai pictorial cross-section, respectively. Overall dimensions are given in Fig. 2.A,-but is should-be noted- that in all construction drawings the - horizontal centerline of the -reactor ( i.e., . the centerline of ex rimental holes HB-2 and HB-5ofFig. 2.A) is arbitrarily taken as elevation 100 ft. On this basis the first floor is at elevation 96 ft 6 in. and the top of the reactor is at elevation 120 ft 6 in. [Pg.45]

The total capital investment (TCI) of a chemical plant is a one-time expense for the design, construction, and start-up of a new plant or a revamp of an existing plant. It is analogous to the purchase price of a new house, where the price includes purchase of the land, huildmg-permit fees, excavation of the land, improvements to the land to provide utilities and access, preparation of architectural and construction drawings, construction of the house, landscq)-ing, and contractor s fee. For convenience in cost accounting and cost estimation, Busche (1995) divides the TCI into the components listed in Table 16.9. [Pg.488]

In the construction drawings, the approach embankments using local fills were to be supported by 200 mm x 200 mm RC piles with pile-caps. In addition, 6 m long wooden piles were also used between the RC piles for further support of the embankment fill. More wooden piles were also installed on the banks of the river in an attempt to stabilize the lateral displacement of the soft alluvium. The abutments and piers were generally supported by 400 mm diameter spun concrete piles. [Pg.196]

Construction drawings—documents the design of buildings or structures. [Pg.13]

Instrumentation field installation drawings control room layouts and the associated hardware configuration panel construction drawings cable and cablerack routing drawings and the associated material take-off and cable schedules. In other words, the realization of the diagrams in space. [Pg.234]

Invert elevation This term, usually associated with any underground line, refers to the elevation of the inside bottom of the sewer line, as shown in Exhibit 13-1- Because of the wide range of materials used in drainage piping systems with varying wall thicknesses, it is the constant that is ased to set the elevation on construction drawings. [Pg.328]


See other pages where Construction drawings is mentioned: [Pg.398]    [Pg.280]    [Pg.43]    [Pg.255]    [Pg.59]    [Pg.139]    [Pg.107]    [Pg.118]    [Pg.245]    [Pg.344]    [Pg.690]    [Pg.12]    [Pg.282]    [Pg.43]    [Pg.205]    [Pg.311]    [Pg.312]    [Pg.79]    [Pg.6]    [Pg.105]    [Pg.152]    [Pg.398]    [Pg.109]    [Pg.113]    [Pg.267]    [Pg.270]   
See also in sourсe #XX -- [ Pg.16 , Pg.38 ]

See also in sourсe #XX -- [ Pg.109 ]




SEARCH



© 2024 chempedia.info