Project control correcting

Table 4 shows the projected anomalies of annual and seasonal precipitation and air temperature for the Ebro River, whereas Figs. 7-12 show the spatial variation of these anomalies, computed using ordinary kriging. Anomalies are computed as the difference between projected bias-corrected values for the climate scenarios (January 2071 to December 2100) and the corresponding values observed during the control period (January 1961 to December 1990), and they can be viewed as expected values about which uncertainties of different origin exist. Table 4 shows that both RCMs predict a reduction in the mean annual precipitation, accompanied by an increase in the mean annual temperature with respect to the control period. In particular, the RCAO E model projects a reduction of 21.8% for the mean annual precipitation and an increase of +6.3°C for the mean annual temperature. [Pg.57]

Even a small project ( 3 to 5 million) will require a staff of 15 to 25 people during the peak of the detailed engineering effort. Each of them must receive the correct information at the right time and, in turn, complete the assigned tasks correctly and on time. Additionally, all of the activities must be performed within the frame of the budgeted hours. This can only be achieved by imposing a project control system. [Pg.171]

Project Control is about anticipating, avoiding, recognizing, and correcting trouble on time... [Pg.196]

Differentiation between polymorphs was performed by pattern recognition in 1995 by Aldrich et The actual control of a process was reported in 1998 by DeBraekeleer et al., where they described using PCA, SIMPLISMA, and orthogonal projections to correct for temperature variation during the monitoring of polymorph conversion. This is a real-time, in-line procedure. [Pg.3436]

In providing a correctly optimized and accurate control system, all sections of the professional team involved in the project have to work together as a fully cooperating group. This includes persons who have a working knowledge of the process and those who are responsible for the automation and the electrotechnical aspects of the project. [Pg.773]

Successful installation, or roll-out, of your PSM systems requires sound planning and effective execution. No matter how diligent you have been, or how receptive and well-managed your company may be, no system as complex as PSM can work perfectly the first time. As every project manager knows, it s impossible to anticipate every outcome or contingency—especially when human behavior is involved. Pilot testing a new system provides the opportunity to identify weaknesses under controlled conditions this in turn enables you to fix problems before the system becomes fully operational. Once these problems are corrected, the pilot test produces a template for installation that can be replicated elsewhere. [Pg.147]

A milestone chart presents a broad-bmsh picture of a project s schedule and control dates. It lists those key events that are clearly verifiable by others or that require approval before the project can proceed. If this is done correctly, a project will not have many milestones. Because of this lack of detail, a milestone chart is... [Pg.834]

The heart of the control process is monitoring work in progress. It is your way of knowing what is going on and how actual compares to plan. With effective monitoring, you will know when corrective action is required. Common ways to keep abreast of project progress are ... [Pg.835]

We certainly want to respond very differently if the temperature of a chemical reactor is changing at a rate of 100°C/s as opposed to l°C/s. In a way, we want to "project" the error and make corrections accordingly. In contrast, proportional and integral controls are based on the present and the past. Derivative controller action is based on how fast the error is changing with time (rate action control). We can write... [Pg.86]

For projects needing stringent QC, control charts are recommended to monitor analyte recoveries throughout an investigation (see Taylor, 1987, for a detailed discussion). Briefly, during each quarter of a project, the last 20 observations of recoveries from QC spikes are used to generate a control chart. Control limits are established for the analytical process as described by Taylor (1987). When control limits are exceeded, sample analyses are suspended until the problem step(s) can be identified and corrected. These actions must follow an appropriate protocol for corrective action. The results of this type of investigation or procedure modification become a part of the permanent record of the sample set and the project. [Pg.104]

Model predictive control is concerned with continuous feedback of information with the objective of reducing the variability of product quality by changing the set points (narrowing the range) in a plant control loop." By nsing model predictive control, projections on batch quality can be made and midstream corrections made to keep a batch within the target limits of the process. [Pg.536]

Using the validated dispersion model as the key tool in the strategy development, efforts turned to Step 5, Control Strategy Development. Table I presents predictions of 1987 particulate air quality based on future year emission data bases, and incorporates all of the identified inventory corrections, and emission growth projections. [Pg.117]

In the realm of synthetic chemistry, supramolecular synthesis thus pursues similar endeavours in planning and control on the intramolecular level as molecular synthesis does on the intramolecular one since it also requires the correct storage of an intermolecular project into a covalent framework, it necessitates expertise at both levels. [Pg.185]


See other pages where Project control correcting is mentioned: [Pg.718]    [Pg.39]    [Pg.212]    [Pg.229]    [Pg.8]    [Pg.117]    [Pg.51]    [Pg.28]    [Pg.78]    [Pg.23]    [Pg.78]    [Pg.580]    [Pg.188]    [Pg.245]    [Pg.461]    [Pg.66]    [Pg.43]    [Pg.190]    [Pg.40]    [Pg.47]    [Pg.72]    [Pg.313]    [Pg.189]    [Pg.189]    [Pg.560]    [Pg.189]    [Pg.19]    [Pg.56]    [Pg.216]    [Pg.267]    [Pg.140]    [Pg.23]    [Pg.95]    [Pg.335]    [Pg.490]   
See also in sourсe #XX -- [ Pg.229 , Pg.230 , Pg.231 ]