Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Plan of work

An outline of the plan of work, describing the methods and procedures to be used, including evaluation of the education activities. Both research and education activities should be included in the plan for each year, but the relative amount of effort devoted to each may vary from year to year ... [Pg.381]

So far as I can judge from their writings, the argument of the alchemists may be rendered by some such form as the foregoing. A careful examination of the alchemical argument shows that it rests on a (supposed) intimate knowledge of nature s plan of working, and the certainty that simplicity is the essential mark of that plan. [Pg.13]

Work Instruction/ Plans of Work Level 3 Written Instructions Fo Control Faks... [Pg.345]

The model for an analysis and reporting strategy presented emphasizes the importance of a structured plan of work in combination with team s commitment, in the attempt to complete participation in the OPCW proficiency-testing scheme successfully. However, teamwork among laboratory staff may not be enough successful participation requires full support from management too. After all, management must understand that participation requires full devotion from the laboratory other tasks preferably have to wait for a later point in time. [Pg.96]

Problem Improper planning of work by the subcontractor impacts the... [Pg.231]

Before every distillation, whether simple or countercurrent, a series of points must be considered prior to starting the calculations. A plan of work for judging a separation problem is given in Table 4. [Pg.46]

The plan of work indicated in Table 4 will be illustrated by means of an example showing the methods of calculation employed. [Pg.193]

Within the Chemical Management area, the planning of work includes an integrated identification and analysis of hazards, and development and specification of necessary controls. There is an adequate process for the authorization and control of work, and a process for identifying opportunities for feedback and continuous improvement. Within the Chemical Management area, line managers are responsible for safety clear roles and responsibilities have been established and there is a satisfactory level of competence. [Pg.44]

Hazard analysis The functions, steps, and criteria for design and plan of work, which identify hazards, provide measures to reduce the probability and severity potentials, identify residual risks, and provide alternative methods of further control (SSDC) a process of examining a system, design, or operation to discover inherent hazards, characterizing them as to level of risk and identifying risk-reduction alternatives (APR 800-16) the determination of potential sources of danger and recommended resolutions in a timely manner for those conditions found in either the hardware/software systems, the person-machine relationship, or both, which cause loss of personnel capability, loss of system, or loss of life or injury to the public (NSTS 22254). [Pg.360]

In the previous chapters, we have mainly discussed work that falls within the responsibility of the process, mechanical, and piping engineers. Before proceeding to a review of the more detailed design procedures which follow on from overall layout development, we will address some of the major responsibilities and concerns of the other engineering disciplines. In particular, we will address some of the issues concerning the overall discipline interfaces, information flow, and planning of work. [Pg.203]

The planner does the detailed planning of work for each line as per the customer information supphed purchasing of fabric and trimmings loading the cutting room in time production control, that is, to ensure that quantities ordered match with the cut quantities. [Pg.90]

The tensions between commercial and safety concerns have undoubtedly been heightened by privatization. Costs are increasingly visible as commercial interests become more prominent and tendering is important. The Inspectorate s Plan of "Work 1996—97 noted ... [Pg.285]

Railway Inspectorate (1996) Plan of Work 1996-97, London HMSO. [Pg.359]

This includes a floor plan and can include locations of rrrachinery, doors, fire escapes, storage areas, work stations, wirrdows, etc. A plan of work practices/flows highlighting raw material to product corrrpletion will assist you in developing a systematic approach to workplace irtspectiorts. [Pg.138]

Source Health and Safety Commission (1997) Plan of Work 1997198 and Health and Safety Commission (1996) Annual Report 1995/96... [Pg.4]

Health and Safety Commission (1997) HSC Plan of Work 1997/98 Summary. October, C65, misc. 085. London HSE Books. [Pg.148]

For any work involving asbestos, including maintenance work that may disturb it, a written plan of work must be drawn up before work starts. Employers must make sure their employees follow the plan of work as far as it is reasonably practicable to do so. Where unacceptable risks to health and/or safety are discovered while work is in progress, for example disturbance of hidden, missed or incorrectly identified ACMs, any work affecting the asbestos should be stopped except for that necessary to render suitable control and prevent further spread. The plan of work should identify procedures to adopt in the light of such emergencies and indicate clearly what remedial measures can be undertaken by staff and what measures should be carried out by... [Pg.381]

The plan of work, sometimes called the method statement, should specify that, so far as is reasonably practicable, asbestos and/or ACMs are removed before demolition or major refurbishment begins. [Pg.381]


See other pages where Plan of work is mentioned: [Pg.367]    [Pg.642]    [Pg.344]    [Pg.109]    [Pg.143]    [Pg.191]    [Pg.179]    [Pg.814]    [Pg.56]    [Pg.1031]    [Pg.81]    [Pg.110]    [Pg.110]    [Pg.81]    [Pg.46]    [Pg.249]    [Pg.22]    [Pg.161]    [Pg.161]    [Pg.671]    [Pg.157]    [Pg.184]    [Pg.207]    [Pg.1166]    [Pg.1167]    [Pg.154]    [Pg.299]    [Pg.304]    [Pg.381]    [Pg.381]   
See also in sourсe #XX -- [ Pg.161 ]




SEARCH



Overview of the work plan

Planning of the works

© 2024 chempedia.info