Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Scheduling on-line

The results presented in Table 10.2 lead to some interesting observations. Generally, all problem instances could be scheduled within reasonable computation times and thus the method is suitable for on-line scheduling. The next observation is that the overproduction generally increases when higher amounts of raw materials are given... [Pg.232]

In order to coordinate the process flowsheet requirements with the mechanical piping specifications, Line Schedules are prepared as showm in Figure 1-24A through D. The complete pipe system specifications are summarized by codes on these schedules refer to paragraph on Working Schedules. [Pg.23]

As a direct companion of the completed flowsheet, the line schedule sheet transmits the process and mechanically necessary details for proper interpretation of the piping aspects of the flowsheet (see Figures 1-24A, B, C, D). These schedules are initiated by the process engineer to further explain the requirements of the process as shown on the flowsheets. They are often and perhaps usually cooperatively completed by other engineers, particularly the piping, mechanical and instrumentation groups. [Pg.29]

Once a test 1s complete, another menu option provides the data analysis results 1n the form of a hard-copy report printed on the local line printer. The report Includes experiment identification Information and the apparent viscosities calculated for each data set. A subset of the data analysis program 1s scheduled automatically by the control programs while the experiment is 1n progress and provides immediate on-line analysis of apparent viscosities for each data set as It 1s collected. The results are viewed using the real-time data display program (Figure 5). [Pg.121]

Acetaminophen is recommended by the ACR as first-line drug therapy for pain management of OA. The dose is 325 to 650 mg every 4 to 6 hours on a scheduled basis (maximum dose 4 g/day maximum 2 g/day if chronic alcohol intake or underlying liver disease). Comparable relief of mild to moderate OA pain has been demonstrated for acetaminophen (2.6 to 4 g/ day) compared with aspirin (650 mg four times daily), ibuprofen (1,200 or 2,400 mg daily), and naproxen (750 mg daily). However, some patients respond better to NSAIDs. [Pg.25]

Specifications, models, and designs built with the three preceding constructs all show recurring patterns. The collaborations for processing an order for a book at an on-line bookstore and for accepting a request to schedule a seminar are also similar in structure—a generic collaboration. [Pg.60]

However, the main reason for the lack of wide application of on-line adaptive control is the lack of economic incentive. On-line identification is rarely required because it is usually possible to predict with off-line tests how the controller must be retuned as conditions vary. The dynamics of the process are determined at different operating conditions, and appropriate controller settings are determined for all the different conditions. Then, when the process moves from one operating region to another, the controller settings are automatically changed. This is called openloop-adaptive control or atn scheduling. [Pg.263]

Electric Utilities. For coal fired electric utilities most, but not all, of the initial conditions to the year 1986 have already been set. Variations will occur but they are unlikely to be significant. The extent of the solidification is based on existing coal supply contracts. The specification of a coal contract to some extent also implies the specification of an air pollution control strategy. Of the 260 units [111,573 megawatts of electricity (MWe)] scheduled to go on-line between 1977 and 1986, 134 (66,210 MWe) are scheduled to enter service between 1977 and 1981. [Pg.10]

Fig. 28. Pickering (Ontario) A generating station s initial performance was outstanding and the station was hailed as a major Canadian technological achievement at the time of its commissioning in Februaiy 1971. It reached full power in 3 months, well ahead of schedule. The final Unit 4 went on line in May 1973. At full output (2,160,(NX) kW), Pickering A" generates enough power to supply more than 1.5 million homes. In 1974, construction was begun on a twin station, Pickering B,n also shown in this view. The B station has the same capacity as its forerunner and all tour units became operational in 1986. (Ontario Hydro, Toronto, Ontario, Canada)... Fig. 28. Pickering (Ontario) A generating station s initial performance was outstanding and the station was hailed as a major Canadian technological achievement at the time of its commissioning in Februaiy 1971. It reached full power in 3 months, well ahead of schedule. The final Unit 4 went on line in May 1973. At full output (2,160,(NX) kW), Pickering A" generates enough power to supply more than 1.5 million homes. In 1974, construction was begun on a twin station, Pickering B,n also shown in this view. The B station has the same capacity as its forerunner and all tour units became operational in 1986. (Ontario Hydro, Toronto, Ontario, Canada)...
Supporting IT systems Finally, the accuracy and speed of an integrated process is heavily influenced by the availability of IT systems, which provide a common database, automated functions like Materials Requirements Planning (MRP), and opportunities for simulation and optimization (for instance, real time finite capacity production scheduling, or on-line customer order confirmation based on existing overall supply chain inventory or capacity). [Pg.289]

Isolde is known throughout the world as the on-line isotope separator at the 600 MeV synchrocyclotron at CERE, Geneva. Work has been going on there since 1967 on many topics includino nuclear physics, solid state, atomic physics, etc. There have been great improvements made over the years but it became clear that the physics output could only be increased if there were to be an expansion of the facility. It was decided to build a second on-line separator to be used alternately with the existing Isolde, thus doubling the potential. The new separator is under construction, called Isolde 3, and is scheduled for first operation next year. [Pg.404]

D. Ruiz, J. Canton, J.M. Nougues, A. Espufia, and L. Puigjaner. On-line fault diagnosis system support for reactive scheduling in multipurpose batch chemical plants. Computers and Chemical Engineering, 25 829-837, 2001. [Pg.157]

In accordance with good laboratory practice, information can be databased on-line or archived off-line in such a manner that allows quick and easy retrieval. Standard reports in fixed formats and ad-hoc reports in virtually any format can be easily generated either on demand or on a scheduled basis. [Pg.23]

Radhakishun FS, van Ree JM, Westerink DHC (1988) Scheduled eating increases dopamine release in the nucleus accumbens offood-deprived rats as assessed with on line brain dialysis. Neurosci Lett 55 351-356. [Pg.388]

The IonSource site (www.ionsource.com) is a good on-line resource for the mass spectrometry and biotechnology community, including scientific tutorials, reference materials, conference schedules, and so on. [Pg.478]


See other pages where Scheduling on-line is mentioned: [Pg.480]    [Pg.535]    [Pg.658]    [Pg.206]    [Pg.480]    [Pg.535]    [Pg.658]    [Pg.206]    [Pg.343]    [Pg.112]    [Pg.977]    [Pg.730]    [Pg.23]    [Pg.23]    [Pg.172]    [Pg.48]    [Pg.161]    [Pg.830]    [Pg.112]    [Pg.319]    [Pg.342]    [Pg.346]    [Pg.411]    [Pg.291]    [Pg.116]    [Pg.396]    [Pg.39]    [Pg.32]    [Pg.271]    [Pg.543]    [Pg.409]    [Pg.32]    [Pg.800]    [Pg.198]   
See also in sourсe #XX -- [ Pg.232 ]

See also in sourсe #XX -- [ Pg.22 ]

See also in sourсe #XX -- [ Pg.22 ]




SEARCH



© 2024 chempedia.info