Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Materials requirement planning

Before diseussing the strueture of a eontrol system it is neeessary to define what is meant by a system. Systems mean different things to different people and ean inelude purely physieal systems sueh as the maehine table of a Computer Numerieally Controlled (CNC) maehine tool or alternatively the proeedures neeessary for the purehase of raw materials together with the eontrol of inventory in a Material Requirements Planning (MRP) system. [Pg.3]

Planned orders are place holders for process orders that have yet to be checked for planning feasibility by detailed scheduling. In a hierarchical planning model they are interpreted as a hint to the details planner that they should create and schedule a process order. They are often the result of an automated MRP (material requirements planning) run that is based on planned independent requirements and does not consider resource capacities. [Pg.271]

To integrate an organizational unit that uses multipurpose batch plants into the company, IT infrastructure with its ERP system, a hierarchical planning approach is most often used. Starting from a material requirements planning (MRP) run, capacity requirements are determined and roughly checked, although the check of the capacity requirements is not directly combined with the material requirements. [Pg.273]

A lot of contradictions in planning processes have their root in the separation of material requirements planning and resource scheduling. This leads to the situation that detailed planning of multipurpose batch plants is still the domain of experienced production schedulers and shift managers who have gained superior knowledge over the years that makes them indispensable. [Pg.273]

Purchasing Materials Requirements Planning Production Planning Distribution Planning... [Pg.48]

Schuster EW, Allen SJ, D ltri MP (2000) Capacitated materials requirements planning and its application in the process industries. Journal of Business Logistics 21 (1) 169-187... [Pg.275]

Vol. 515 G. Heisig, Planning Stability in Material Requirements Planning System. XII, 264 pages. 2002. [Pg.244]

Supporting IT systems Finally, the accuracy and speed of an integrated process is heavily influenced by the availability of IT systems, which provide a common database, automated functions like Materials Requirements Planning (MRP), and opportunities for simulation and optimization (for instance, real time finite capacity production scheduling, or on-line customer order confirmation based on existing overall supply chain inventory or capacity). [Pg.289]

An introduction to materials management can fill an entire textbook. The purpose of this chapter is to introduce the most important aspects of materials management and for each topic to address the unique issues of the pharmaceutical industry. References are provided for those who want more detailed information about materials management in general and specific areas in particular such as materials requirements planning. [Pg.305]

Lunn T. MRP Integrating Material Requirements Planning and Modern Business. Business One Irwin/ Apics Series in Production Management. 1992. [Pg.321]

Infinite Capacity Algorithms Material Requirements Planning... [Pg.2039]

OrUcky, J. (1975), Material Requirements Planning The New Way of Life in Production and Inventory Management, McGraw-HiU, New York. [Pg.2052]

The general SCM matrix can be adapted to better reflect the specihc characteristics of basic chemical industry. In the traditional SC planning matrix, the material requirement planning modules are concerned with determining order quantities of raw and intermediate materials necessary to realize a pre-dehned production plan. These tasks are particularly challenging if the variety of handled materials is large.In basic chemical industry, however, the variety of raw and intermediate chemicals is comparatively small while their demand is high and mostly determined by the plants technical specifications. [Pg.126]

The first one that will be described is MRP (materials requirements planning). Here is a definition of materials requirements planning from Operations Management, by William Stevenson A compnter-based information system that translates master schedule requirements for end items into time-phased requirements for subassemblies, components, and raw materials. ... [Pg.181]


See other pages where Materials requirement planning is mentioned: [Pg.4]    [Pg.22]    [Pg.240]    [Pg.241]    [Pg.264]    [Pg.554]    [Pg.13]    [Pg.43]    [Pg.44]    [Pg.276]    [Pg.12]    [Pg.795]    [Pg.979]    [Pg.321]    [Pg.542]    [Pg.85]    [Pg.348]    [Pg.492]    [Pg.545]    [Pg.1770]    [Pg.2033]    [Pg.2034]    [Pg.2039]    [Pg.2039]    [Pg.2317]    [Pg.2751]    [Pg.2754]    [Pg.2763]    [Pg.22]    [Pg.185]    [Pg.132]    [Pg.603]    [Pg.11]   
See also in sourсe #XX -- [ Pg.749 ]

See also in sourсe #XX -- [ Pg.163 , Pg.168 ]

See also in sourсe #XX -- [ Pg.132 ]

See also in sourсe #XX -- [ Pg.9 , Pg.18 , Pg.60 , Pg.62 , Pg.64 , Pg.66 , Pg.68 , Pg.103 , Pg.106 , Pg.108 , Pg.122 , Pg.124 , Pg.238 , Pg.239 , Pg.245 ]

See also in sourсe #XX -- [ Pg.58 , Pg.59 , Pg.61 , Pg.175 , Pg.199 ]




SEARCH



JIT and material requirements planning (MRP)

MRP (material requirements planning

Material requirements

Material requirements planning system

Security plans .Transporting hazardous materials requirements

© 2024 chempedia.info