Installation tender documents

The installer must have trained specialists with expert knowledge and experience in plastics and civil engineering, in plastics quality control and in the installation methods of large-area geosynthetic liner systems. The installer s personnel must be able to compile a technically sound proposal on the basis of tender documents and provide a full service in accordance with the conditions. They must be able to assess the effect of deficiencies detected on the liner system s performance in order to be able to perform a practical and technically competent repair . [Pg.369]

The basic aim of the main study phase is to develop the necessary basis for government approval and for the main contracts. The project matnres the concept further and establishes a contractual strategy, technical specifications and other tender documents. A Plan for the development and operation of the installation and an Environmental Impact statement are developed and transmitted to the authorities. They are based on input from different SHE studies, including a coarse Risk and Emergency Preparedness Analysis (REPA). A primary aim is to provide input to the documentation required by the authorities. The different SHE analyses... [Pg.314]

An installation specification should be prepared for issue to prospective installation contractors for tender. The specification forms the technical section of the construction documentation package that should be appended to the specification. Each specification should contain, or provide detailed reference to, the following information ... [Pg.584]

The responsibility for cleaning the FRP units after installation is often over looked and should be clearly stated in the contract documents. A Method Statement should be included with tenders. [Pg.519]

Installation of the leak monitoring system must be integrated into the liner construction technology. The manufacturer s installation procedure must be adapted to these conditions. In the appendix of the recommendation document, the AK DKS Working Committee has published sample drafts for the additional technical contract conditions and the performance list for an invitation to tender for leak monitoring systems plus a quality assurance plan for their installation. It is first advisable to pilot the leak monitoring system in a test field of a minimum area of 1000 m, which may be part of the liner itself The structure of the test field should be iden-... [Pg.440]

The consolidation rate can be accelerated by installing prefabricated vertical drains. The design of the vertical drain system is usually the responsibility of the Contractor, since it is related to the adopted construction program. Sometimes the drain spacing (triangular or rectangular) and depth are specified in Contract documents. Since the performance of a vertical drain system is not accurately predictable, field trials are recommended. Sufficient time for such trials should then be foreseen in the project schedule or executed before tender stage. [Pg.460]