Tlie following simplified example, constructed by Hendershot, will facilitate tlie transition to tlie case studies. Suppose tliat a risk assessment is being conducted at a chemical plant to detenuine the consequences of two incidents (tlie initiating events of die event tree shown in Fig. 21.1.1) defined as... [Pg.610]

Petri net modelling tool can be considered as a suitable implementation tool for risk assessment due to its flexibility and process simulation ability (Vemez et al., 2004). In addition, different feasible process options can be modelled in a Petri net as a super model, and assessed from safety point of view. A Petri net is a directed bipartite graph including places (drawn as circles) and transitions (drawn as bars). Places contain tokens which are shown as dots. The set of arcs are divided into input and output arcs with an arrowhead on their destinations. A transition is called enabled if all input places have at least the same number of tokens as all its output places. An enabled transition fires by removing tokens from input places to output places. Places, transitions and arcs all can be weighted. Weight is an additional feature that can carry critical attribute of related node through the nets (Gu and Bahri, 2002)... [Pg.129]

These properties are especially important in the design, data analysis, and interpretation of multispecies toxicity tests, field studies, and environmental risk assessment and will be discussed in the appropriate sections. This alternate approach rejects the smooth transition of effects and recognizes that ecosystems have fundamentally different properties and are expected to react unexpectedly to contaminants. [Pg.23]

Institutional Transition. Adopting a new paradigm for toxicity testing and risk assessment will require changes to the EPA s operations, organization, and outreach. The ERA is expecting that this transition will likely require more than a decade for full implementation. [Pg.17]

Ricci, M., Newshohne, G., Bellaby, P. Flynn, R. 2007a The transition to hydrogen-based energy combining technology risk assessments and lay perspectives . International Journal of Energy Sector Management, 1(1) 34—50. [Pg.50]

The objectives of this standardized observational technique are risk assessment as well as effectiveness evaluation of traffic facilities, not estimations regarding the quantity of accidents [35]. Thereby, conflicts have a probability to become accidents, which does not mean that accidents can be predicted with the method [35]. The transition probabilities between conflicts and accidents, as needed, for example, in the above-mentioned fault tree analyses, can be assessed [42]. Compared to accident analysis, investigating conflicts has the following advantages [35] ... [Pg.28]

Modem fire protection techniques have developed through multidiscipline activities in science and engineering and involve careful selection of materials, end-use product design and manufacture, and fire performance and risk assessment. Reducing the flammability of materials is still an essential primary fire safety consideration. PP is an inherently flammable material and therefore flame retardant treatment of the polymer is an essential consideration in relation to fire safety. For material scientists, however, it is also very important to be aware of developments in fire safety science and engineering including the transition from prescriptive to functional regulation of fire safety in many coimtries. [Pg.253]

However, the world of risk assessment is in transition. Some systems now in use are three- or four-dimensional, and they require numerical risk scorings. Safety professionals can expect that variations of numerical risk scoring systems will proliferate. Nevertheless, it needs to be said that two-dimensional, qualitative risk assessment systems are not obsolete. Often, a two-dimensional system will be selected because it is sufficient for the hazards and risks encountered and it works well within an organization. This chapter will inform safety professionals on ... [Pg.163]

Risk is a term used in all three domains in the sixth edition Not at all in the third edition. Hazard identification and analysis and risk assessment have become recognized as a major part, a basic part, of the practice of safety. A domain in the sixth edition is devoted entirely to that subject. It is the centerpiece of the examination. This is an important element in the transition taking place in the practice of safety. [Pg.77]

Probabilistic risk assessment, again taken from the commercial nuclear industry, is another useful tool for the transit community. Because all transit systems and industries have to face public scrutiny, risk assessments are a very good way to communicate safety information to the public. [Pg.55]

Many features of system safety and risk assessment are common to various industrial situations, and one industry can learn from the experience of another. This book crosses various industries so that you can learn the best techniques from the chemical, nuclear, aerospace and military, manufacturing, and mass transit industries. [Pg.432]

System Conceptualisation, Representation and Scoping (System Analysis). This stage of the analysis is often omitted from safety literatnre and standards. This preparatoiy phase is necessaiy in order to provide a stmctured framework and systematic approach for the hazard identification, risk assessment, and for snpporting a holistic approach to the analysis. Some form of system description model, for example state transition model or sequence and collaboration diagrams, should be used as the basis for hazard identification, as the hazards resulting from each system interface, process or interaction can be elicited. The novel approach, developed as part of the research, to system conceptualisation in support of safety analysis, is discussed later in the book ... [Pg.134]

An, M., Huang, S. and Baker, C. (2007). Railway risk assessment-the fuzzy reasoning approach and fuzzy analytic hierarchy process approaches A case study of shunting at Waterloo depot. In Proceedings of the Institution of Mechanical Engineers, Part F Journal of Rail and Rapid Transit, 221(3), pp. 365-383. Bichou, K. (2008). Security and risk-based models in shipping and ports review and critical analysis. OECD/ITF Joint Transport Research Centre Discussion Paper. [Pg.597]


See other pages where Transitions risk assessment is mentioned: [Pg.399]    [Pg.405]    [Pg.164]    [Pg.417]    [Pg.617]    [Pg.34]    [Pg.35]    [Pg.197]    [Pg.24]    [Pg.1657]    [Pg.226]    [Pg.8]    [Pg.49]    [Pg.280]    [Pg.311]    [Pg.565]    [Pg.6]    [Pg.146]    [Pg.929]    [Pg.150]    [Pg.163]    [Pg.164]    [Pg.255]    [Pg.2]    [Pg.356]    [Pg.55]    [Pg.32]    [Pg.1010]    [Pg.731]   