Project planning work breakdown structures

In planning the quality dimension, include specifications for the quality and types of materials to be used, the performance standards to be met, and the means of verifying quality such as testing and inspection. Two techniques facilitate planning for quality a work breakdown structure and project specifications. Both are described on the next few pages. [Pg.820]

A work breakdown structure is the starting place for planning all three parameters of a project quality, cost, and time. It is a technique based on dividing a project into tasks, or work packages. Because all elements required to... [Pg.820]

To prepare a project control chart, refer to the work breakdown structure and list all of the tasks of the project. Then, use the schedule to list the time planned to complete each task, and use the budget to list the expected cost of each task. [Pg.833]

This list or resource requirements, together with the activities generated during the analysis for the work breakdown structure, form the basis for the next phase of the process, namely the detailed planning of the project... [Pg.262]

Changes to the WHEN or in the CONSTRAINTS are bad news to the project team, but can be resolved by modifying the existing plan, e.g. the work breakdown structure and resource planning need to be revised. [Pg.268]

Section 3.1 Systems Engineering Process Planning. Briefly describes an overview of the key project technical objectives, deliverables and results from the process, needed process inputs, and product work breakdown structure development. [Pg.69]

Once a plan of action is developed, the next step is to further break down the project into logical subunits. This allows the project manager to assign responsibilities and clearly understand the actions necessary to complete the objectives. A work breakdown structure must outline events and activities, detail the division of labor required from various support departments, provide a structure for reporting the project status, and be used as a communicating device between the project team and management. [Pg.331]

Thus, the charter must be complete enough to settle on these components of the plan. There are a number of project management tools that are useful, such as project network diagrams and work breakdown structures (WBS). The WBS is a deliverable listing by phase of the project. As the plan is developed, the list of issues to address should be expanded. [Pg.125]

This project is managed by ORNL for the Office of Transportation Technologies and is closely coordinated with complementary ceramics tasks funded by other DOE offices, NASA, DoD, and industry. A joint DOE and NASA technical plan has been established, with DOE focus on automotive applications and NASA focus on aerospace applications. A common work breakdown structure (WBS) was developed to facilitate coordination. The work described in this report is organized according to the following WBS project elements ... [Pg.3]

The project planning phase aims for a detailed planning of the project progress. Thus, the project is first systematically decomposed into sub-projects and work packages presented in a work breakdown structure (WBS). Furthermore, a time-, cost-, and resource analyst evaluates first the duration of the execution regarding the individual project activities as well as the timely relation of the activities within the project. In addition, the required resourced for the execution of the project such... [Pg.292]

The work breakdown structure (WBS) is widely considered to be the most essential construct required for effective project management. The tool decomposes or breaks down project activities and tasks into the smallest possible unit of work. After the construction of the WBS, it becomes the core of the center of the project plan and the primary driver for the remaining project. Thus, resource planning, estimates, tracking, or risk management are all based on the WBS. [Pg.293]

First of all PC Manufacturing Inc. fulfilled the work-breakdown structure for the most pressing corrective action in order to break down the project activities into the smallest possible units. The work breakdown structure is an essential construct required for successful project management. This step is important in order to plan and structure the project more effectively. [Pg.301]

The SEMP is the top-level plan by which the systems engineering methodology is employed to manage the project and, as such, defines how the project will be organized, structured, and conducted as well as how the total engineering process will be controlled to provide a product that satisfies stakeholder requirements. The SEMP is supported by a project Work Breakdown Structure (WBS) that defines the project task hierarchy. [Pg.74]


See other pages where Project planning work breakdown structures is mentioned: [Pg.511]    [Pg.1247]    [Pg.2768]    [Pg.27]    [Pg.596]    [Pg.298]    [Pg.63]    [Pg.30]    [Pg.1267]   
See also in sourсe #XX -- [ Pg.433 ]