Costs planning

Is there a working development plan Cost of suitable land... [Pg.877]

Application for approval of the proposed chimney height should be made to the appropriate authority at an early stage of a project in order to ascertain their approval or other height they may require. Failure to do this can result in an embarrassing situation where insufficient finance has been allocated due to their requiring a larger chimney than was included in the planned costing. [Pg.362]

Scale-up is the process of developing a plant design from experimental data obtained from a unit many orders of magnitude smaller. This activity is considered successful if the commercial plant produces the product at planned rates, for planned costs, and of desired quality. This step from pilot plant to full-scale operation is perhaps the most precarious of all the phases of developing a new process because the highest expenses are committed at the stages when the greatest risks occur. [Pg.40]

This combination significantly decreases the cost of generated electricity. Figure 13 shows the planned cost of generated electricity for Georgian coal (FB technology by indigenous coal production costs 20, 25, 30 or 35 US /t)... [Pg.31]

The involvement must be far more extensive than the mere review of the final product. The Project Manager must also review the basis of the estimate and the estimating approach to insure that the estimating efforts are commensurate with the information available and that the product will include sufficient details to satisfy the project s further need for planning, cost tracking and progress monitoring. [Pg.131]

Understands role of planning cost control uses them ... [Pg.389]

By effectively controlling psoriasis, costs to patients, lost work days, and health plan costs may be reduced. [Pg.1781]

Foster Higgins and Co., 1990 Health Care Benefits Survey. Report 1—Indemnity Plans Cost Design and Funding (New York, NY A. Foster Higgins and Co., Inc., 1991). [Pg.328]

Today many possible forms of computer-tiided tools have been developed for optimization of devices, minimization of forces, time registration, and simplification of movements. They also enable shorter planning time, minimized planning costs, tmd extended possibilities for optimization of movements (Konold and Reger 1997). [Pg.418]

The third process, financial control of the project, is again based on the cost accounts. The basic control method is an ongoing comparison between actual and planned cost accumulation. Methods such as the earned value technique develop ratio measures that help the controller to analyze the schedule and cost deviations over time and employ control limits as triggers for corrective action. The control is usually performed at the WP cost account level. [Pg.1273]

An exact estimation of the on-site maintenance activities based on costs and schedule is possible by comparison of the planned costs and activities with the actual expenditure and time needed to perform the maintenance. [Pg.95]

Compares tasks completed and milestones achieved to the project schedule, perhaps using periodic updates of a critical path method (CPM) analysis as described in the next chapter. If critical tasks are or soon will be behind schedule, takes corrective actions discussed in that chapter. As noted earlier in this chapter, the project manager may also use the earned value method (EVM) to monitor planned costs, actual costs, and the value of results produced. [Pg.189]

Project planning Within the context of project planning it is to be decided whether-and if so, by whom-a plant wiU be manufactured. During this phase of planning, cost forecasts and analyses play an important role. To be able to assess the production costs for the manufacturing of a planned product as exactly as possible, so-called basic engineering has to be carried out. This includes, inter alia. [Pg.8]

Time operating outside Emergency work orders on high percent of planned costs) PHA/reviews completed (total)... [Pg.490]

There is always a degree of inaccuracy in any budget. Prevent cost overruns if possible since overruns almost always have detrimental effects. Make sure that you use the most qualified person to develop the OSH budget. Remember that there will always be budget expenditure and issues beyond your control since actual cost may not be the same as planned cost. Link budget elements to accomplishments, milestones, needs, and compliance. Provide as much substance as possible to your... [Pg.342]

From Example 8-1, we can see that the increase in demand variability at the retailer increases seasonal inventory as well as planned costs. [Pg.220]

In this figure, DQ is defined as the inverse of the average of the actual cost (AC) to planned cost (PC) and actual schedule (AS) to budgeted schedule (BS), or... [Pg.116]


See other pages where Costs planning is mentioned: [Pg.113]    [Pg.14]    [Pg.487]    [Pg.113]    [Pg.122]    [Pg.197]    [Pg.44]    [Pg.10]    [Pg.93]    [Pg.2323]    [Pg.61]    [Pg.37]    [Pg.373]    [Pg.36]    [Pg.73]    [Pg.30]    [Pg.100]    [Pg.496]    [Pg.243]    [Pg.210]    [Pg.223]    [Pg.220]    [Pg.1473]    [Pg.76]    [Pg.86]   
See also in sourсe #XX -- [ Pg.204 ]