Because intense heat is generated in these furnaces it is understandable that the arc volatilizes such metals as tin, zinc, lead, cadmium, and the like. In addition, both melting and smelting furnaces may generate large amounts of carbon monoxide. As a result all new furnace installations require pollution... [Pg.124]

Filter collectors available in a large number of configurations, resulting in a range of dimensions and inlet and outlet flange locations to suit installment requirements... [Pg.2180]

Part 3 Building and installation requirements for functional safety of process control systems under emergency conditions (December 1998)... [Pg.158]

One should select a lower secondary current, say, 1 A CT, for installations requiring long lengths of connecting leads, such as for remote measurement of current or other quantities. It is advisable to limit the extra VA burden on the CTs, on account of such leads. [Pg.491]

For installation operations you will need an installation requirement and an installation plan. Similarly for any other process which represents the core for your business, you will need a requirement and a plan to achieve the requirement. The plan should detail the processes you need to implement in order to achieve the requirement. [Pg.348]

Refer to API-2000 [26] for recommendation regarding installation requirements. Tank venting equipment capacities are expressed as free air/hour. For handling other fluids besides hexane or gasoline, use equation for V. (Equation 7-48) to convert to equivalent free air flow. [Pg.478]

Assume that this installation requires three separate compressors with suction as just stated. [Pg.593]

The fault level at the point of supply to the installation requires consideration. The minimum fault level which can occur will affect the operation of the installation, particularly with regard to voltage regulation when starting motors, while the maximum fault level will determine the ratings of equipment installed. All supply systems develop with time, and the switchgear and other equipment installed at an installation must be chosen to be suitable if the external supply system expands. [Pg.210]

Installation requirements for rotary positive-displacement compressors are similar to any rotating machine. Review the installation requirements for centrifugal pumps and compressors for foundation, pressure-relief, and other requirements. As with centrifugal compressors, rotary positive-displacement compressors must be fitted with pressure-relief devices to limit the discharge or inter-stage pressures to a safe maximum for the equipment served. [Pg.561]

The dynamics of power transmission chain drives are not conducive to high-speed operation. Since proper installation requires some looseness in the chain, they tend to separate from the sprockets at higher speeds. In general, transmission chains are limited to a maximum sprocket speed of 3,600 revolutions per minute (rpm). [Pg.983]

A multivariable model is like a black box. The constraints go in and the signals come out. Operators do not trust a system that takes the unit away from them. Successful installations require good training and continual communication. The operators must know the interconnections in the system. [Pg.180]

Installation requirements Specify special requirements for assembly or installation... [Pg.10]

Most safety practices for electrical installations are based on the National Electric Code (NEC).11 Although states, municipalities, and insurance companies may have their own installation requirements, they are usually based on the NEC. [Pg.339]

Installation Qualification—The IQ is the protocol that verifies that the installation of the system has followed the guidelines established within the validation plan and is in accordance with the vendor s installation requirements. [Pg.309]

Heat detectors should be spaced to ensure prompt detection of heat given off by incipient fire conditions. Spacing considerations should include the degree of hazard, type of detector used, geometry of the protected area, effects of air handling equipment if it is indoors, or environmental factors (wind, temperature, etc.) if it is outdoors. See NFPA 72 for more information on spacing and installation requirements. [Pg.190]

The practical location of the piping and nozzles, with respect to the surface to which the spray is to be applied or to the zone in which the spray is to be effective, is determined largely by the physical arrangement and protection needs of the installation requiring protection. Once these criteria are established, the size (rate of discharge) of nozzles to be used, the angle of the nozzle discharge cone, and the water pressure needed can be determined. [Pg.204]

New fire water pump installations require acceptance testing as defined in NEPA 20. This section highlights some of the important tests required. [Pg.336]

Confirm location and installation requirements per recommendation of manufacturers. [Pg.294]