Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Advanced planning

Intent Plant personnel, supplies, and budget are reqiiired to successfully complete a unit test. Piping modifications, sample collection, altered operating conditions, and operation during the test require advance planning and scheduling. Analysts must ensure that these are accomplished prior to the actual test. Some or all of the following may be necessary for a successful unit test. [Pg.2556]

J. P. Fraser. Advance planning for dispersant use/non-use. In Proceedings Volume, pages 429-432.9th Bien API et al Oil Spill (Prev, Behav, Contr, Cleanup) Conf (Los Angeles, CA, 2/25-2/28), 1985. [Pg.390]

Many of these recommendations can be achieved using modern means of information technology. Standardized order procedures based on widely accepted information protocols will help to reduce the delay of information and current systems for advanced planning and scheduling (APS) provide means to support humans in decision making in complex networks. Building blocks of AP S systems are ... [Pg.7]

Of course there are many planning solutions offered by vendors of MES or APS (advanced planning systems) (see for example S tad tier and Kilger [8]). The great advantage of a simulation based solution is the almost unlimited flexibility... [Pg.31]

Stadtler, H. and Kilger, C. (2005) Supply Chain Management and Advanced Planning, 3rd edn, Springer, Berlin. [Pg.36]

To support decision making in supply chains, advanced planning systems (APS) have been developed and successfully applied in industry by several software vendors. Most of these systems rely on some kind of decomposition of planning tasks into software modules as shown in Figures 11.1 and 11.2. [Pg.240]

Optimizer (SAP APO), which is the advanced planning component within the SAP SCM solution. For more information on SAP APO refer to [9,10]. [Pg.247]

Fleischmann, B., Meyr, H. and Wagner, M. (2005) Advanced planning, in Supply Chain Management and Advanced Planning. Concepts, Models, Software and Case Studies, 3rd edn (eds H. Stadtler and C. Kilger), Springer, Berlin, pp. 81-106. [Pg.260]

Sales order management deals with order entry, order change, availability check and confirmations to the customer. Availability check as a concept and as part of Advanced Planning Systems (APS) is also summarized under the term Available-To-Promise (Kilger/Schneeweiss 2004 Pibemick 2005). The availability has to be checked against the sales plan as stable framework for the overall period and the physically available material at the specific point in time. [Pg.63]

Fleischmann B, Meyr H (2003) Planning Hierarchy, Modeling and Advanced Planning Systems. In Graves SC, De Kok AG (eds) Supply Chain Management. North-Holland, Amsterdam, pp 1-56... [Pg.264]


See other pages where Advanced planning is mentioned: [Pg.40]    [Pg.43]    [Pg.42]    [Pg.75]    [Pg.125]    [Pg.254]    [Pg.12]    [Pg.205]    [Pg.5]    [Pg.239]    [Pg.239]    [Pg.241]    [Pg.243]    [Pg.260]    [Pg.268]    [Pg.268]    [Pg.274]    [Pg.5]    [Pg.7]    [Pg.8]    [Pg.12]    [Pg.18]    [Pg.44]    [Pg.47]    [Pg.47]    [Pg.53]    [Pg.122]    [Pg.124]    [Pg.124]    [Pg.211]    [Pg.261]    [Pg.265]    [Pg.266]    [Pg.266]   
See also in sourсe #XX -- [ Pg.239 ]




SEARCH



Advance Product Quality Planning

Advance quality planning

Advanced Planning and Scheduling Models

Advanced Quality Planning

Advanced planning and scheduling

Advanced planning and scheduling (APS

Advanced planning scheduling

Advanced planning solution

Advanced planning systems

Production Network Design and Advanced Planning Systems

© 2024 chempedia.info