Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Track regulation

A control system that contains a LQ Regulator/Tracking controller together with a Kalman filter state estimator as shown in Figure 9.8 is called a Linear Quadratic Gaussian (LQG) control system. [Pg.288]

CHEM MULTI BASE CHEM Multi BASE, Inc. P.O. Box 350 Mahomet, IL 61853 (217) 5864131 Database of 16,000 chemicals with synonyms and trade names. Government numbers and information are cross referenced with MSDSs for all DOT regulated chemicals. Includes tracking and inventory system. [Pg.286]

Twelve McxJulcs addressing environmental activities monitored by liPA, UCRA, OSIIA, CERCIA, and DOT regulations. Includes SARA reporting module containing MSDS and production information, SARA reporting assi.stancc, tracking capabilities. [Pg.297]

On April 6, 1994, OSHA published its final revisions to the Personal Protective Equipment (PPE) standard in the Federal Register, Vol. 59, No. 66. With the implementation date of July 5, 1994, the regulation, applicable to the general industry, represented major changes in the selection and use of PPE. OSHA believes that through compliance with the PPE standard, safety statistics that track worker safety will improve. These improvements will add up to 712,000 lost workdays and 95,000 recordable cases. [Pg.124]

Priority Lists, Risk Assessment process and tracking system in relation to Council Regulation (EEC) 793/93 also known as Existing Substances Regulation (ESR). [Pg.314]

As noted in Chapter 1, the priorities in batch processes are often quite different from those in large-scale continuous processes. Particularly when manufacturing specialty chemicals, the shortest time possible to get a new product to market is often the biggest priority (accepting that the product must meet the specifications and regulations demanded and the process must meet the required safety and environmental standards). This is particularly true if the product is protected by patent. The period over which the product is protected by patent must be exploited to its full. This means that product development, testing, pilot plant work, process design and construction should be fast tracked and carried out as much as possible in parallel. [Pg.291]


See other pages where Track regulation is mentioned: [Pg.522]    [Pg.67]    [Pg.1033]    [Pg.1033]    [Pg.249]    [Pg.29]    [Pg.522]    [Pg.67]    [Pg.1033]    [Pg.1033]    [Pg.249]    [Pg.29]    [Pg.370]    [Pg.556]    [Pg.260]    [Pg.61]    [Pg.273]    [Pg.139]    [Pg.286]    [Pg.304]    [Pg.935]    [Pg.179]    [Pg.311]    [Pg.59]    [Pg.576]    [Pg.756]    [Pg.307]    [Pg.488]    [Pg.540]    [Pg.28]    [Pg.152]    [Pg.35]    [Pg.713]    [Pg.634]    [Pg.293]    [Pg.1063]    [Pg.118]    [Pg.681]    [Pg.181]    [Pg.343]    [Pg.211]    [Pg.185]    [Pg.206]    [Pg.143]    [Pg.884]    [Pg.112]    [Pg.7]    [Pg.208]   
See also in sourсe #XX -- [ Pg.26 , Pg.71 , Pg.140 , Pg.150 , Pg.151 , Pg.154 , Pg.163 , Pg.164 , Pg.205 , Pg.211 , Pg.212 ]




SEARCH



© 2024 chempedia.info