Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

The signal box

A signal box is an infrastructure allowing control of the various railway switches and protection signals with the purpose of management of railway fraffic within a geographically delimited rail track. [Pg.122]

These actions are broken down into elementary operations that must be undertaken safely , to avoid collisions and derailments. The signal box allows an operator to perform all these operations. [Pg.122]

Since the advent of relay and flexible transit signal boxes (PRS pastes d aiguillage d relais et a transit souple), the operating phases of the posts are such that  [Pg.123]

The operation is done in successive stages, reflecting the successive positions of switches and zones (track circuit) see Table 4.1. [Pg.123]

The control phase can be centralized and carried ont by an unsafe snb-system. Other stages depend on the highest level of safety and require controlled and monitored execution of the installations. It is the role of the computerized interlocking module that we will now describe further. [Pg.123]


Formal validation the possibility accorded to trade operators to obtain formal proof that the safety automation respects, within the context of the operating premise, aU the safety attributes required by the track plan. It should be noted that this type of proof is done after all technical or functional modifications to the signal box are made, which is customary for... [Pg.107]

Figure 4.5. Model of available system states system safety 4.3.5. The signal box... Figure 4.5. Model of available system states system safety 4.3.5. The signal box...
With the electro-hydraulic system the signals, power and hydraulic supplies are sent from a Master Control Station (or MCS) on the host facility down Control Umbilicals (Fig 10.36) to individual Junction Boxes on the seabed or subsea structure. [Pg.270]

Here is described the verification of one particular characteristic parameter of one flaw detector, i.e. vertical linearity. The system of verification VERAPUS is connected to peripheral equipment as indicated in figure 2. The dialogue boxes show the operator how to adjust the R.F. signals that are sent by the arbitrary generator to the flaw detector. [Pg.703]

Harper, E., and Rose, G. D., 1993. Helix stop signals in proteins and peptides The capping box. Biochemistry 32 7605-7609. [Pg.208]

A multivariable model is like a black box. The constraints go in and the signals come out. Operators do not trust a system that takes the unit away from them. Successful installations require good training and continual communication. The operators must know the interconnections in the system. [Pg.180]

Fig. A.3. Light meter used by the author (Model 8020, Pelagic Electronics). For total light measurements, the signals are integrated with capacitors. Milliammeter reading is automatically reset at full-scale position, and the number of resets is digitally indicated below the meter. The box at the right contains a photomultiplier and sample compartment. Fig. A.3. Light meter used by the author (Model 8020, Pelagic Electronics). For total light measurements, the signals are integrated with capacitors. Milliammeter reading is automatically reset at full-scale position, and the number of resets is digitally indicated below the meter. The box at the right contains a photomultiplier and sample compartment.
Petards (ou artifices 1 pour signaux (Fr). Used during WWI to attract the attention of neighboring troop units or fortifications. The devices consisted of boxes filled with about 400kgs of BlkPdr. They produced a report which could be heard for a distance of 3km, and the smoke produced gave the location of the signalling unit Ref Pepin Lehalleur (1935), 477... [Pg.696]

Figure 37-6. The predominant bacterial transcription termination signal contains an inverted, hyphenated repeat (the two boxed areas) followed by a stretch of AT base pairs (top figure). The inverted repeat, when transcribed into RNA, can generate the secondary structure in the RNA transcript shown at the bottom of the figure. Formation of this RNA hairpin causes RNA polymerase to pause and subsequently the p termination factor interacts with the paused polymerase and somehow induces chain termination. Figure 37-6. The predominant bacterial transcription termination signal contains an inverted, hyphenated repeat (the two boxed areas) followed by a stretch of AT base pairs (top figure). The inverted repeat, when transcribed into RNA, can generate the secondary structure in the RNA transcript shown at the bottom of the figure. Formation of this RNA hairpin causes RNA polymerase to pause and subsequently the p termination factor interacts with the paused polymerase and somehow induces chain termination.
To consider pH as a controlled variable, we use a pH electrode to measure its value and, with a transmitter, send the signal to a controller, which can be a little black box or a computer. The controller takes in the pH value and compares it with the desired pH, what we call the set point or reference. If the values are not the same, there is an error, and the controller makes proper adjustments by manipulating the acid or the base pump—the actuator.2 The adjustment is based on calculations using a control algorithm, also called the control law. The error is calculated at the summing point where we take the desired pH minus the measured pH. Because of how we calculate the error, this is a negative feedback mechanism. [Pg.7]

Figure 34 Excerpts of two-dimensional HMBC spectra of cholesteryl acetate recorded on a Bruker Avancell 400 MHz spectrometer (A) with the standard HMBC pulse sequence (Figure 1), and (B) with the IMPACT-HMBC experiment depicted in Figure 30. The same contour levels are used for all spectra. In (A), F, ridges are still visible (indicated by a vertical arrow), while they are very efficiently suppressed in (B). The proposed sequence results in signals with no coupling structure, as a result of the incorporation of a constant-time period. The improved peak dispersion is shown for the correlation between C-3 and H-2 (expanded in the small boxes). Asterix and the dashed box indicate residual Vch signals. The measurement duration was 22 min for both experiments. Figure 34 Excerpts of two-dimensional HMBC spectra of cholesteryl acetate recorded on a Bruker Avancell 400 MHz spectrometer (A) with the standard HMBC pulse sequence (Figure 1), and (B) with the IMPACT-HMBC experiment depicted in Figure 30. The same contour levels are used for all spectra. In (A), F, ridges are still visible (indicated by a vertical arrow), while they are very efficiently suppressed in (B). The proposed sequence results in signals with no coupling structure, as a result of the incorporation of a constant-time period. The improved peak dispersion is shown for the correlation between C-3 and H-2 (expanded in the small boxes). Asterix and the dashed box indicate residual Vch signals. The measurement duration was 22 min for both experiments.
Refining an operation is like designing a computer monitor You have the specs of the signals that come along the wires and their required manifestations on the screen. Your work is to define the insides of the box you may involve others by specifying parts you will use inside. Your design talks about the specifications of the constituent parts and how they are wired together. [Pg.293]


See other pages where The signal box is mentioned: [Pg.208]    [Pg.209]    [Pg.128]    [Pg.208]    [Pg.209]    [Pg.128]    [Pg.390]    [Pg.703]    [Pg.197]    [Pg.433]    [Pg.527]    [Pg.215]    [Pg.570]    [Pg.461]    [Pg.168]    [Pg.396]    [Pg.475]    [Pg.491]    [Pg.347]    [Pg.466]    [Pg.164]    [Pg.194]    [Pg.173]    [Pg.13]    [Pg.41]    [Pg.42]    [Pg.43]    [Pg.133]    [Pg.83]    [Pg.230]    [Pg.100]    [Pg.309]    [Pg.19]    [Pg.130]    [Pg.245]    [Pg.371]    [Pg.188]    [Pg.477]    [Pg.70]    [Pg.104]   


SEARCH



The Box

© 2024 chempedia.info