An example qualification test for CE—MS involves the simple separation of two small pentapeptides Leu-enkephalin (miz 556) and Met-enkephalin (mlz 589). The sample mixture is composed of 100 pmol/pL of each component in 100% H20,1% acetic acid. The CE column is a 50 im ID x 65—80cm bare fused silica pre-washed with O.IM NaOH and H2O, and then pre-rinsed with the running buffer solution of 100% water, 1% acetic acid. The injection method is pressure at 50mbar for 10 s and an ESI sheath liquid in the ratio of 60/40 IPA/water, 1% acetic acid at 2 tL/min. The spectra are collected every 3 s over a 350—3000 mlz scan. [Pg.54]

In this paper we are concerned with the adhesive systems beneath thick rubber adherends. Unlike the technology for the paint industry, where the science of qualification testing for durable thin coatings has produced paints with 10, possibly 20 years life... [Pg.169]

The respective qualification or testing document should be examined to assess whether existing test procedures are suitable or whether enhanced or additional test actions and acceptance criteria need to be prepared. The rationale and required level of qualification testing for any revalidation should be documented in the change records and the validation plan suitably updated. [Pg.634]

As discussed earlier, many FR qualification tests for wires and cables, according to applicable standards, require testing on a fully fabricated article. However, to conduct research toward new materials for use in wire and cable applications, it is often desirable to obtain directional information in the early stages by conducting laboratory-scale tests that are capable of discerning improvements in FR characteristics of materials. Later in the product development process, optimization, validation, and qualification must nevertheless be conducted on full-scale articles and equipment. [Pg.794]

The instrumentation and control re-qualification tests for the tram B power evacuation system began at 4 00 Re-energismg the 400 kV tram B transformer took place at 07 00... [Pg.79]

Recognizing differences in materials, welding processes, and welding procedures, the general conclusion was that each base plate material and weldment combination satisfied the requirements of the qualification tests for LNG service at -162°C. [Pg.530]

Qualification tests for adhesives are defined in Method 5011 of MIL-STD-883 and requirements for qualifying sealed hybrid microcircuits or multichipmodulesthatcontainadhesivesarespecifiedinMIL-PRF-38534. Space, automotive, and medical applications generally use the military specifications, but are modified or supplemented with additional tests and requirements for their particular application. [Pg.374]

Weld procedure qualification tests for submerged arc welding of the main vessel shell and cladding destructive tests metallographic techniques to check that Heat Affected Zone (HAZ) reheat cracks are absent. [Pg.128]

A proficiency test was carried out recentiy to assess the performance of MinUab visual TLC quantification estimates.Samples were made at 0%, 40%, and 100% from a dmg reference tablet and given, unidentified, to inspectors with the Minilab protocol for quality screening. In round 1 of the proficiency test, only 3 of 28 substandard samples were correctly identified. Round 2, administered after a performance qualification test for the analytical method, showed improvement 19 of 27 substandard dmgs were correctly identified, while 5 out of 9 inspectors made the correct inference on the quality of 45 samples. In both rounds, two inspectors failed to identify substandard samples. These results show the need to have competent, well-trained users and to include a proficiency test in the Minilab screening program to obtain reliable results. [Pg.517]

The acceptance criterion for the resolution of GSI II.D.l is that the qualification testing for the RCS block, relief, and safety valves must be performed in accordance with the guidance identified in NUREG-0737 and with ASME B PV code. Section III. The performance testing shall include both normal and off-normal (accident) conditions. Furthermore, the accident conditions... [Pg.338]

Qualification test for continuous-duty motors installed inside the 73/03... [Pg.52]

C-12 Qualification Procedure for Acetylene Cylinder Design, Describes qualification tests for use by manufacturers of acetylene cylinders as required when a new cylinder design or significant design change occurs. Tests include a proof of the mechanical strength of the filler, a flashback test, an impact stability test, and a fire test. (16 pages)... [Pg.627]

Qualification tests for the second shutdown system and, specifically, the hydraulic control rod drives (CRDs) are planned in a high pressure rig for CRD tests (CAPEM) the first series of tests (completed) was performed in a cold pressure rig (CEM)... [Pg.86]

See Design Qualification Test for additional related information. [Pg.306]

Qualification tests for commercial off-the-shelf items are unknown or not performed... [Pg.480]


See other pages where Qualification tests for is mentioned: [Pg.675]    [Pg.626]    [Pg.802]    [Pg.529]    [Pg.374]    [Pg.16]    [Pg.544]    [Pg.376]    [Pg.669]    [Pg.429]    [Pg.45]   
See also in sourсe #XX -- [ Pg.374 ]