The form Project Details is used to get project information. Once the details are filled in, press the OK button to transfer the mformation to the main form. [Pg.172]

Open This will open a previously saved file. Only file extension . flw is acceptable for the File menu. [Pg.172]

Save Once a calculation is done, the Save menu will save the input parameters, including the project details. [Pg.172]

Print Once a calculation is complete, the Print menu will print the output in a standard format. [Pg.172]

SI Unit This will set all units in the SI format (this is also the unit by default). [Pg.173]


The following example is from the purification of a compound that utilised both standard, fully attended preparative techniques and. subsequently an autoprep system. All of the work undertaken on this compound is presented (not just the autoprep isolation). This is because, not only do the latter stages of the project detail the potential... [Pg.311]

Fenech M, Chang WP, Kirsch-Volders M, Holland N, Bonassi S, Zeiger E. HUMN project detailed description of the scoring criteria for the cytokinesis-block micronucleus assay using isolated human lymphocyte cultures. Mutat Res 2003 534 65-75. [Pg.30]

Examples of training project details (Power Quality)... [Pg.584]

For the flavourists, the main goal of technical tasting sessions is to familiarise lhanselves with a specific product set or to evaluate the performance of their own flavonr creations. In that respect, flavourists are fully aware of all the project details, such as the requester, the objectives, the targeted market, the product recipe, etc., which strongly influence their perceptions and their jndgements. [Pg.387]

Hill, P. S., Smith, S. and Barnes, F. J. (1999), Use of high modulus carbon fibres for reinforcement of cast iron compression struts within London Underground project details , Conference on Composites and Plastics in Construction, November 1999, BRE, Watford, UK. RAPRA Technology, Shawbury, Shrewsbury, UK, paper 16 1-6. [Pg.657]

From the preceding, it is clear that SIS and reliability go hand-in-hand. A functional safety assessor (FSA) assesses the safety assessment/analysis report (SAR) after SIS is developed to check the system reliability and SIL. In order to achieve a tolerable risk level, the end-user, who needs to install SISs in the plant, initiates SIS projects. Detailed process outline for the same has heen elaborated as follows ... [Pg.494]

The project detailed here results in, literally, a simple plate with a design on it. But as you become more experienced in the technique, there are many items on which you can use this method. [Pg.313]

The land reclamation project is located in the Dingshan Development Zone in Wenzhou, China. Due to the lack of sand resources near the project site, mud and soft clay were used as fill material. Some project details are hsted in Table 9.4. [Pg.327]

Asaoka s method is another graphical method to assess the ultimate consohdation settlement based on monitoring data of settlement plates. A plot of measured settlements versus time is divided into equal time intervals after which subsequent settlements are plotted against each other. The extrapolation of a straight line finaUy gives an indication of the ultimate settlement to be expected. It is noted that creep deformation is not included in the graphical method which means that the total settlement may (theoretically) be somewhat underestimated. This method is, however, often used in land reclamation projects. Detailed information... [Pg.427]

Adequate fiilfillment of such a safety process requirement is a cmcial point for system safety. It is often a big challenge to find all possible hazards. How can we be sure to have a complete hazard hst as input for further activities And how can we manage the different results of all performed safety analyses to have a set of hazards as an input for the next project Detailed domain know-how is necessary to perform these tasks and to estimate the operational risk for each hazard. [Pg.258]

All tables are accessible through forms, wMch are adapted if required. From the project detail form it possible to open or close hazards in the current project as well as in the child projects, all available project data is shown and each hazard is linked with ERRSYS. [Pg.260]

Project details can be obtained from Peter Bradley, AEA Technology, SRD, Wigshaw Lane Culcheth. TEL 0925 254382, FAX 0925 254539... [Pg.169]

Enter project details Ihiough Prcject Details menu. [Pg.107]

The Project Details menu will open a Project Details form as shown in Figure 1.21. This form will allow entry of the general details of the project and calculations. This also includes the Calculation Done by and Calculation Checked by options along with dates. Once the details are entered, pressing the OK button will transfer the information to the main Vessel form. [Pg.108]

Enlet project details through Project Detais menu 2 Select hrpe of flow demertt. [Pg.171]

Liquid Vapour Tmo Phdse Project Details Help ... [Pg.177]


See other pages where Project details is mentioned: [Pg.325]    [Pg.138]    [Pg.381]    [Pg.42]    [Pg.226]    [Pg.445]    [Pg.228]    [Pg.404]    [Pg.427]    [Pg.181]    [Pg.446]    [Pg.82]    [Pg.201]    [Pg.158]    [Pg.268]    [Pg.62]    [Pg.65]    [Pg.1501]    [Pg.21]    [Pg.87]    [Pg.216]    [Pg.586]    [Pg.277]    [Pg.586]    [Pg.103]    [Pg.107]    [Pg.108]    [Pg.108]    [Pg.172]    [Pg.172]   


SEARCH



Programming project details

Project management detailed engineering