Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Program Results

The three parties that cooperated to create the framework for the HPV Challenge Program have each reviewed the results and have come to somewhat different conclusions. Just as they had viewed the data that gave rise to the program initially through different lenses, they have made their assessments of the results of the program through those different lenses. Sometimes they reach their conclusions based on different sets of facts sometimes they [Pg.331]

Letter from Susan H. Wayland, Deputy Assistant Administrator, EPA. (Oct 14,1999) [hereinafter Wayland Letter], at http //www.epa.gov/HPV/pubs/general/ceoltr2 Jitm. [Pg.331]

For a discussion of the 8(e) Comphance Audit Program, see Chapter 7, Reporting and Recordkeeping. [Pg.331]


The first task was the aeation of large 3D chemical structure databases. By devising so-called fast Automatic 3D model builder, software such as the CORINA [27, 28] and CONCORD [29, 30] programs resulted in a boom in 3D database development (see Section 2.9 in this book and Chapter II, Section 7.1 in the Handbook). A subsequent step was the development of fast... [Pg.313]

Write a program in BASIC to carry out the multiplications in Problem 1. Crosscheck yoru program results with your hand calculations from Problem 1. [Pg.44]

Maintenance. The lack of maintenance and investment in inspection programs results in not only poor housekeeping but unnoticed leaks due to corrosion, leaking flanges and valves, and inoperative instmmentation that could prevent spills. [Pg.321]

Con.sumcrprcfcrcncc obstacles. Consumer preference strongly affects the manner in which a product is produced, packaged, and marketed. If the implementation of a pollution-prevention program results in the increase in the cost of a product or decreased convenience or availability, consumers might be reluctant to use it. [Pg.2168]

A.G. Hackett, J.D. Puhrman, and C.T Stone, Acetochlor surface-water monitoring program results to date, Presented at the 218th ACS National Meeting, New Orleans, LA, August 22-26, 1999. [Pg.388]

As we went on with evidence of Farben s role in enslaving the people of Europe, we emphasized that this role was part and parcel of an over-all program resulting in the death of millions as a result of the aggressive war unleashed by Germany, in which Farben shared a major responsibility. Hand-in-hand with the conquest of basic industries was the conquest of labor to make these industries work for the expansion of a war which had been brought on by prior conquests of industry and prior exploitations of labor. [Pg.126]

This experience is usually passed on from older to younger workers over time. However, when downsizing or streamlining programs results in many of these experienced people leaving an organization at once (e.g., to take advantage of early retirement incentives), a gap in the company memory can be created. [Pg.117]

One of the major considerations of the research requested by JECFA was the safety aspects which was not surprising in view of the chemical complexity of the caramels. The program resulted in the publication of 11 papers in the same issue of the journal Food and Chemical Toxicology 1992 (Vol. 30) and seven of them were on toxicology. Caramel colorants were given a clean bill of health and JECFA assigned an ADI of 0-200 mg/kg/day. [Pg.199]

Computer program results for a representative compound are shown in Table 1-2. [Pg.1]

The P Program resulted in total cost productivity of 3.0 billion between September 1997 and September 2003, which was, in effect, money directly to the company s bottom line. However, cost productivity is not only important to improve the company s financial results. Continual cost productivity also puts the company in a good position to continue to grow, i.e. to gain market share, even when market conditions become difficult, such as with overcapacity and price erosion. [Pg.28]

Figure 4. AFM surface morphology view of the NPyc catalyst (side-1) (A) and in-built program result for the calculation of particle size on the surface (B). Figure 4. AFM surface morphology view of the NPyc catalyst (side-1) (A) and in-built program result for the calculation of particle size on the surface (B).
Table 13.4 National Residue Monitoring Program Results for Antibiotics and Ivermectin over the Period 1992-1994 in the United States... Table 13.4 National Residue Monitoring Program Results for Antibiotics and Ivermectin over the Period 1992-1994 in the United States...

See other pages where Program Results is mentioned: [Pg.445]    [Pg.408]    [Pg.186]    [Pg.360]    [Pg.538]    [Pg.417]    [Pg.388]    [Pg.319]    [Pg.213]    [Pg.103]    [Pg.439]    [Pg.1229]    [Pg.268]    [Pg.141]    [Pg.26]    [Pg.53]    [Pg.80]    [Pg.108]    [Pg.135]    [Pg.144]    [Pg.173]    [Pg.199]    [Pg.209]    [Pg.207]    [Pg.17]    [Pg.615]    [Pg.6]    [Pg.135]   


SEARCH



1988 monitoring program results

Temperature-programmed desorption results

Transient program measured results

Transient program measuring results

Use of Audit Program Results

© 2024 chempedia.info