Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Program phasing

Bolen, M.M., et al., Alternative Cover Assessment Program Phase II Report, Geo Engineering Report 01-10, University of Wisconsin-Madison, Madison, WI, September 2001. [Pg.1090]

Pollack, A. K A. M. Dunker, J. K. Fieber, J. G. Heiken, J. P. Cohen, S. B. Shepard, C. H. Schleyer, and G. Yarwood, Revision of Light-Duty Vehicle Emission Inventories Using Real-World Measurements—Auto/Oil Program, Phase II, J. Air Waste Manage. Assoc., 48, 291-305 (1998). [Pg.939]

Epple (1994) TGA Various samples Temperature-programmed phase formation + + n.a. Method development... [Pg.318]

NRC. 2003b. Review of DOE s Vision 21 Research and Development Program—Phase I. Washington, D.C. The National Academies Press. [Pg.141]

Mioduszewski, R.J., Manthei, J., Way, R., Burnett, D., Gaviola, B., Muse, W., Anthony, J., Durst, D., Sommerville, D., Crosier, R., Thomson, S., Crouse, C. (2001). ECBC low level operational toxicology program Phase I-B inhalation toxicity of sarin vapor in rats as a fimction of exposure concentration and duration. ECBC-TR-183. Edgewood Research Development and Engineering Center, Aberdeen Proving Ground, MD. [Pg.64]

Bagley D, Booman KA, Bruner LH, et al. 1994. The SDA alternatives program phase III Comparison of in vitro data with animal eye irritation data on solvents, surfactants, oxidizing agents, and prototype cleaning products. J Toxicol Cutan Ocular Toxicol 13(2) 127-155. [Pg.367]

Advanced EV Powertrain Program, Phase I, Technical Report by Ford Motor Company and General Electric Company to DOE, Contract No. DE-AC08-82NV-10308 (1984), pp. 11-20. [Pg.427]

R D is a function of available investment capital, allowable risk, and projected profitability. Careful planning and management in this program phase is critical for minimizing costs and time to commercialization for the sensor. [Pg.567]

The path to final production demonstration is split into two major parts in this program. Phase I focuses upon material and composition refinement to satisfy the fuel cell property and performance requirements. Also in Phase I, investigations and demonstrations of research-scale rapid material formation techniques will be performed. [Pg.459]

The FEM programs commercially available today process these steps in essentially three program phases ... [Pg.2848]

DOE. 1993. Continuous Fiber Ceramic Composite (CFCC) Program Phase I, Volume 1, Report Number 1.0, Task 1 Applications Assessment, August 31, 1993 (DOE/CE/41000-01). Washington, D.C. U.S. Department of Energy. [Pg.105]

Siler, S. (2010) GM Continues Project Driveway fuel cell Development Program, Phases in Second-Gen Technology, Car and Driver, http //blog.caranddriver.com/gm-continues-proJect-driveway-fuel-ceU-development-program-phases-in-second-gen-technology/ (last accessed 27 March 2011). [Pg.1148]

Amrhein GT, Holmes MJ, Bailey RT, Kudlac GA, Downs W, Madden DA, Advanced Emissions Control Development Program, Phase Ill-Approved final report, 1999, DOE Conti-act DEFC22-94PC94251. [Pg.107]

Scope definition As with any other issues, at the starting point it is necessary that the problem, scope, and boundary limit are well-defined so that there is no ambiguity in targeting the issue. Here the aspects, boundary limits of program phases, and the equipment and activities to be covered in modeling are defined to get a clear definition of the cost elements. [Pg.1013]

The programming phase should produce four associated documents afunctional program, a technical program, the design intent, and the beginning of the systems manual. [Pg.36]

P.D. Smith, et al.. Seismic Safely Margins Research Program Phase C, Lawrence Livermore National Laboratory, NUREG/CR-2015, Vol.l -Vol.10, April 1981. [Pg.246]

Diesel Emission Control - Sulfur Effects (DECSE) Program. Phase I. August 1999. [Pg.147]

Busse, R M. Harling, O. K. Palmer, M. R. Kiger m, W. S. Kaplan, J. Kaplan, 1. Chuang, C. F. et al., A critical examination of the results from the Harvard-MIT NCT program phase 1 chnical trial of neutron capture therapy for intracranial disease. J. Neuro-Oncol. 2003,62, 111—121. [Pg.233]

Mioduszewski, R.J., Manthei, J., Way, R., et al., 2001. ECBC low level operational toxicology program phase I-B inhalation toxicity of sarin vapor in rats as a function... [Pg.107]


See other pages where Program phasing is mentioned: [Pg.754]    [Pg.168]    [Pg.557]    [Pg.63]    [Pg.578]    [Pg.484]    [Pg.86]    [Pg.2810]    [Pg.543]    [Pg.192]    [Pg.438]    [Pg.758]    [Pg.106]    [Pg.313]    [Pg.996]    [Pg.110]    [Pg.146]    [Pg.95]    [Pg.95]    [Pg.34]    [Pg.36]    [Pg.36]    [Pg.42]    [Pg.42]    [Pg.206]    [Pg.221]    [Pg.17]    [Pg.18]    [Pg.19]   
See also in sourсe #XX -- [ Pg.469 ]




SEARCH



© 2024 chempedia.info