Contracts management systems

It is incumbent upon the toller to develop and follow internal management systems as appropriate to support business needs, production needs, process safety, environmental responsibility, and worker health. The selection process should have considered whether or not satisfactory systems are in place. Nevertheless, the contract or auxiliary documents may be the vehicle used to help ensure that the system reviewed is the system actually used for completing the toll in question. Within the process safety management system, the management of change and training elements are essential subsystems. [Pg.62]

Quality Management system priorities to consider are management responsibility, quality system principles, auditing, contract review, design control, corrective action, document control, quality records, training, product safety and liability, and statistical techniques, because these are critical aspects of the Quality Management system where Xmple Inc. already has some systems in place. [Pg.32]

The cost of an energy management system at one site in the north of England was of the order of 1,000,000 and the payback period was just over 2 years. In view of the high cost of such systems, it may be possible to obtain a system on a loan basis, the system being rented from the installer or by lease purchase. All options should be considered before entering into a contract. [Pg.461]

And further, that the responsibilities for quality-related activities of the contract giver and contract acceptor should be specified in a written agreement . Similarly, ISO 9001 (2000) states that, Where an organization chooses to outsource any process that affects product conformity, the organisation shall ensure control over such outsourced processes. Control of such outsourced processes shall be identified within the quality management system. ... [Pg.16]

If contracted and additional technical and key support persormel are used (e.g. students), the laboratory shall ensure that such persormel are supervised and competent and that they work in accordance with the laboratory s management system. [Pg.35]

The commander at each level and contractor supervisors are responsible for implementation of an integrated management system based on the Army Chemical Surety Program and contract reqnirements. The program specifies accountability for the chemical agent inventory and controls access to storage and processing areas (U.S. Army, 20000-... [Pg.43]

A document specifying the processes of the quality management system (including the product realization processes) and the resources to be applied to a specific product, project, or contract can be referred to as quality plan. [Pg.43]

From mid 1988 to the end of 1991 a contract research project was carried out at a chemical processing plant of Exxon in Rotterdam, where one of the main activities was the development and implementation of a so called Near Miss Management Systems (NMMS), described in Chapter 8. [Pg.4]

Set A the seven old cases all concerned local sites with which we had had extensive direct contacts in the period of 1985-1990, either in the form of contract research projects or by supervising students working in those plants. The insights in their safety management systems in general and in their NMMS projects in particular were updated in 1991. [Pg.63]

Ail of the insights and suggestions mentioned in this dissertation are primarily based on two major sources an international workshop on near miss reporting, held in Eindhoven in 1989, and a three-year contract research project (1988-1991) to design and implement an actual near miss management system for a chemical plant in Rotterdam, Furthermore, the thesis describes a first step towards validation through a series of discussions with safety managers in the Dutch (chemical process) industry. [Pg.87]

In one job-shop operation, we found that about 80% of the company s profits came from 20% of the jobs or contracts. By using this information, it was possible to design management systems and material fiows around these few jobs that led to increased productivity and profit. [Pg.113]

The PI must be knowledgeable about the multiple processes needed to manage a clinical study, including the medical records system, investigational drug pharmacy, clinical laboratory, other clinical departments necessary to support the project, the institutional review and approval processes, budget and financial management, and contract initiation. [Pg.152]


See other pages where Contracts management systems is mentioned: [Pg.356]    [Pg.356]    [Pg.2230]    [Pg.62]    [Pg.112]    [Pg.171]    [Pg.92]    [Pg.614]    [Pg.1036]    [Pg.18]    [Pg.202]    [Pg.203]    [Pg.211]    [Pg.78]    [Pg.62]    [Pg.112]    [Pg.194]    [Pg.68]    [Pg.505]    [Pg.505]    [Pg.275]    [Pg.392]    [Pg.82]    [Pg.1986]    [Pg.825]    [Pg.84]    [Pg.2555]    [Pg.2475]    [Pg.522]    [Pg.196]    [Pg.268]    [Pg.55]   
See also in sourсe #XX -- [ Pg.62 ]