Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Installation monitoring

Additionally, and despite its name, NDT may in fact still require boiler components to be drilled or cut in order to install monitoring devices prior to using the test equipment. [Pg.622]

Mobile and flexibly installable monitoring devices with low power consumption which might still need a protective container, delivering data of relatively high quality, or alternatively could be low cost sensors used very flexibly, e.g. at lampposts or on buses,... [Pg.292]

Personnel cost (all cost for personnel including additional costs and administrative costs). Cost which occur for personal that is in charge of installing monitoring devices, taking samples and analysing the samples in laboratories. (Is a professional needed for all procedures or is a semi-skilled worker sufficient )... [Pg.388]

A major reason for installing monitor wells is to provide early warning of ground-water contamination. [Pg.161]

Fixed Offshore Installations, Monitoring of cathodic protection systems. Technical note TNA 705, Det norske Veritas. April 19M. [Pg.36]

Al-Hakam BWfacility, Iraq UNSCOM inspectors installing monitoring cameras, 1995. This site was the primary BW agent production plant in Iraq. Note the large fermenter on the left. (Courtesy of United Nations, Photograph by H. Arvidsson.)... [Pg.42]

Activity 5.5 Confirm that the equipment operates in a satisfactory manner Activity 5.6 Stipulate, if applicable, the requirement for additional equipment Activity 5.7 If appropriate, update the arrangements for the verification and maintenance of installed monitoring equipment... [Pg.150]

Verify inspection equipment and installed monitoring equipment... [Pg.151]

Permanently installed monitors for detecting radioactive contamination in air should be provided at selected locations in a nuclear power plant. The activity concentration in air should be determined, at least for those accessible rooms of the controlled area where airborne radioactive substances may be present in amounts that could influence the radiation doses to workers. In LWRs, monitors should also be located at the ventilation ducts for exhaust air from the following areas ... [Pg.50]

It is possible to test ventilation systems by installing monitoring probes for post-installation validation If a 1 200 g DPM material is to function as a gas barrier It should be installed according to BRE 212/BRE414, being taped and sealed to all penetrations. [Pg.156]

Monitoring in subfloor voids should preferably be carried out via specially installed monitoring points. In open voids these can be retrofitted by drilling through walls and installing small diameter tubes to the centre of the void. [Pg.174]

Plans showing proposed sampling and monitoring point points where post-installation monitoring is proposed Yes D/No ... [Pg.183]

The decision to install monitoring instrumentation and to safety classify it is usually taken on the basis of the relevance of the external event hazard for system design and, in general, on the basis of the instrumentation s significance for the plant s emergency procedures. Seismic monitoring and automatic scram systems, when installed, need to be properly classified for safety and adequate redundancy according to their objectives. [Pg.72]

In summary, it is emphasized that the radionuclide specific activities measured here are very small. The values are many orders of magnitude less than those of the naturally occurring radionuclides in environmental samples, and meaningless in terms of an additional radiation exposure to the public. The measurements serve only to document the events of that time, to attain reference values for checking the plausibility of measurement input data in the German federal IMIS system, and to test the sensitivity of the installed monitoring capabilities. In this last respect, the results impressively demonstrate that even such small traces of contaminations are rapidly detected with the current measmement installations. [Pg.222]


See other pages where Installation monitoring is mentioned: [Pg.262]    [Pg.798]    [Pg.334]    [Pg.6]    [Pg.33]    [Pg.370]    [Pg.632]    [Pg.750]    [Pg.818]    [Pg.860]    [Pg.1008]    [Pg.78]    [Pg.28]    [Pg.345]    [Pg.372]    [Pg.88]    [Pg.213]    [Pg.91]   
See also in sourсe #XX -- [ Pg.331 ]




SEARCH



Installation measurement and monitoring

Installation procedures monitoring wells

Leak monitoring system installation

Monitor Installation

Monitor-wells aquifer installation

Monitor-wells installation

Monitoring devices, installation

Monitoring probe installation

Process monitoring permanent installations

© 2024 chempedia.info