Engine test plant

Engineering tests. These tests demonstrated the operation of modifications to the existing energetics feed system and SILVER II plant to eliminate the operational problems discussed in AEA s final report for Demo II (AEA, 2000). They also demonstrated the long-term operation of a 12-kW SILVER II system on feeds of agent simulant and energetics. [Pg.66]

Many licensors and contractors who must obtain data from which to design and build solvent extraction plants utilize large, elaborate pilot plants which simulate commercial plant conditions. Many refiners have constructed such plants to obtain data from which to guide commercial equipment and prepare samples for engine test evaluations. Plants of this sort cost 200 to 300 daily to operate. An evaluation of a single stock may require weeks and cost thousands of dollars. [Pg.195]

Law, J., D. Meikrantz, T. Gam, et al. 2006. The Testing of Commercially Available Engineering- and Plant-Scale Annular Centrifugal Contactors for the Processing of Spent Nuclear Fuel. 15th Pacific Basin Nuclear Conference, October 15-20, Sydney, Australia, Idaho National Laboratory Report INL/CON-06011498 PREPRINT, Idaho... [Pg.614]

Rivalier, P., et al. (2008), Design Study of a Pilot Test Plant for Hydrogen Production by a Thermochemical Process , Proc. of 16th International Conference on Nuclear Engineering (ICONE16), Orlando, Florida, USA, 11-15 May. [Pg.221]

G. Rosner, H. P. Konig, W. Koch, H. Kock, R. F. Hertel, H. Windt, Engine test experiments to assessing platinum uptake by plants, Angew. Botanik, 65 (1991), 127D132. [Pg.377]

Other partial costs include maintenance of the store room, the repair shops, and the estimates from the plant engineer. Tests are made from time to time to determine the exact amount of steam and water used for a given product. [Pg.457]

To examine the pyrolysis reaction of the scrap tires, pulverized scrap tires were heated in a quartz tube by an electric furnace (h). Then the continuous pyrolysis test plants in Table I were constructed to get the engineering data required for the design of an actual plant,... [Pg.538]

Development of IS process test plant made of engineering materials. Capacity of the plant may be in the range of 10-30m -H2/h, with which smallest components used in industrial chemical plants can be tested such as valves, pumps, etc. [Pg.192]

A School of Chemical Engineering Practice where students in an industrial plant, but under the guidance of a professor, carried out chemical engineering tests and studies significant to the operation of the plant. [Pg.79]

The time required for this phase varies quite widely from project to project and depends on many factors. Delaying tactics are not appropriate here, since capital is required (e.g., for keeping the test plants running). However, after the preplannning permission has been granted, generally by the responsible division of the company, at least 3-6 months are required to prepare the necessary documents. If possible, the potential project leader, who will later share complete responsibility for the project with the project engineer, should also be chosen in this phase. [Pg.308]

The successful operations of JOYO provide a wealth of experiences with core management, impurity control, reactor engineering tests, innovative instrumentation techniques, operation and maintenance support systems, and component modifications. These experiences and accumulated data are to be used for the design of future fast reactors. They are also useful for upgrading the JOYO core and plant to the MK-III configuration and are essential to secure steady and safe reactor operation and enhance the irradiation capability of JOYO in the future. [Pg.60]

The Operator Training (OT) and Engineering Test (ET) systems were developed later on and are used to assist plant start-up. They contain the same process models as used for the Engineering models, made robust for operator training, and contain the base layer control as developed for the Honeywell DCS system as well as the complete safegUM ding system, incorporated via specific Honeywell tools (e.g. SimC300). [Pg.163]

Chemical and Engineering News 1983 Test plant for guayule rubber to be built. Chem Eng News 16 7-8... [Pg.1193]

Supplementary development programmes were initiated in selected areas where innovations were introduced to further enhance reactor and plant safety, performance characteristics, reliability, and availability. Extensive use is made of the U.S. natiorud laboratories and engineering test centers to establish the required data base. [Pg.480]

As an example, an engine test stand in an industrial plant is analyzed. The engine test stand consists of one or more measurement devices with smart maintenance features. The measuring devices are configurable for different engines. The measurement and... [Pg.318]


See other pages where Engine test plant is mentioned: [Pg.748]    [Pg.410]    [Pg.142]    [Pg.58]    [Pg.202]    [Pg.260]    [Pg.940]    [Pg.270]    [Pg.142]    [Pg.247]    [Pg.749]    [Pg.22]    [Pg.226]    [Pg.580]    [Pg.102]    [Pg.137]    [Pg.382]    [Pg.95]    [Pg.121]    [Pg.329]    [Pg.321]    [Pg.410]    [Pg.307]    [Pg.20]    [Pg.113]    [Pg.15]    [Pg.269]    [Pg.54]    [Pg.540]    [Pg.37]    [Pg.396]    [Pg.63]    [Pg.55]    [Pg.7]   
See also in sourсe #XX -- [ Pg.171 , Pg.172 , Pg.173 , Pg.174 ]




SEARCH



Engineered plants

Engines plant)

Plant engineers

Plant tests

Testing Plant Tests

© 2024 chempedia.info