Elevators planning

To start a detailed planning study, space requirements must be known for various products, by-products, and r iw materials, as well as for process equipment. A starting or reference point, together with a directional schematic flow pattern, will enable the design engineers to make a trial plot plan, as e.xplained below, A number of such studies will be required before a suitable plot and elevation plan can be chosen. [Pg.169]

An elevation plan should be drawn to scale showing the vertical relationships of all elevated equipment. These drawings, as well as the plot plan, are usually sketched by the engineer and then redrawn to scale by a draftsman. [Pg.147]

Figure 13.1 Elevation, plan drawing and flow scheme of the Cerini dialyzer, the first successful industrial dialyzer used to recover sodium hydroxide from waste streams resulting from the production of rayon [2]... Figure 13.1 Elevation, plan drawing and flow scheme of the Cerini dialyzer, the first successful industrial dialyzer used to recover sodium hydroxide from waste streams resulting from the production of rayon [2]...
Scale Models. Recent developments in the u of scale models have shown the advantages of this method over the detailed two-dimensional method. Figure 5-4 is a view of a study mode costing less than 1,000. It was made from blocks of wood and cardboard set on in. to the foot scaled paper. This low-cost model is used chiefly to develop plot and elevation plans and cannot be used for piping and utilities layout. Figure 5-5 is a more complete model costing 5,000 to 10,000. It is... [Pg.181]

Fig. 19.4 (A) Tanks suitable for fermentation and beer maturation elevation, plan and side elevation. (B) Methods of installing storage tanks, (a) Vertical tanks (b) Strap mounting of suspended horizontal tanks (c) Bottom tank on concrete cradle, upper tank saddled (d) Bottom tanks on legs, upper tanks offset saddled (e) Bottom tanks on jacks, upper tanks interspaced and mounted on centre column (0 Bottom tanks ring mounted and suspended, upper tanks mounted on offset centre columns (g) Ring suspended multi-tier installation. Fig. 19.4 (A) Tanks suitable for fermentation and beer maturation elevation, plan and side elevation. (B) Methods of installing storage tanks, (a) Vertical tanks (b) Strap mounting of suspended horizontal tanks (c) Bottom tank on concrete cradle, upper tank saddled (d) Bottom tanks on legs, upper tanks offset saddled (e) Bottom tanks on jacks, upper tanks interspaced and mounted on centre column (0 Bottom tanks ring mounted and suspended, upper tanks mounted on offset centre columns (g) Ring suspended multi-tier installation.
Fig. 10. Horizontal rotating pan filter (a) plan view (b) elevation. Fig. 10. Horizontal rotating pan filter (a) plan view (b) elevation.
Fig. 3. Three-dimeiisioiial flow for stream recharge via a water table aquifer where (a) is the elevation view and (b) is the plan view. Fig. 3. Three-dimeiisioiial flow for stream recharge via a water table aquifer where (a) is the elevation view and (b) is the plan view.
Figure 12 shows the plan and elevation views of a process unit piping (9). A dmm is supported off the piperack. Heat exchangers are located far enough back from the support columns so that they are accessible and their shell covers can be removed. Pumps are located underneath the piperack, but sufficient room is provided for maintenance equipment to access the motors and to remove the pump if necessary. The motor is always oriented away from the process equipment and located on that side of the piperack. Instmment valve drops are shown supported from the columns. The instmment trays themselves mn on the outside of the support columns. Flat turns are only made from the outside position of the piperack. Nozzle-to-nozzle pipe mns are made whenever possible. Larger lines are located on the outside of the piperack. Connections to nozzles above the rack are made from the top... [Pg.80]

Flare noise (roar of combustion) is the most serious because it is elevated and the sound carries. The flare can be located at a remote distance from the operating unit or surrounding community. Noise of steam injection into the burner can be reduced by using multiple no22les. Furnace noise from air intake, fuel systems, and combustion blower forced draft/induced draft (FD/ID) fans can be reduced by acoustics. The plot plan should be evaluated for noise generation and to find the means of alleviating or moving noise to a less sensitive area. [Pg.83]

Fig. 12. Optimum belt feeder interface (a) elevation views, where (----------) is the belt feeder on its centerline, and (b) plan view. Fig. 12. Optimum belt feeder interface (a) elevation views, where (----------) is the belt feeder on its centerline, and (b) plan view.
Fig. 3. The Dorrco Flocculator-Squarex clarifier combination (cross-flow arrangement) (a) plan and (b) sectional elevation. Fig. 3. The Dorrco Flocculator-Squarex clarifier combination (cross-flow arrangement) (a) plan and (b) sectional elevation.
FIG. 26-22 Multireactor knockout (K-O) drum/catch tank a) plan view of reactors connected to horizontal containment vessel (h) back-to-back bursting disc assembly (c) elevation of self-supporting vessel (d) elevation of horizontal vessel on roof of building (e) elevation of horizontal vessel on side of building. [Pg.2297]

Power production intensity is the power produced hy the hoiler per unit area of the plan section of the hed at a stated elevation. [Pg.2398]

Containment design details - basic structure, major contents (beat structures), internal safety systems performance data, special features, reactor cavity/sump details, layout elevations and floor plans, fnateriais specifications, design limits, etc. [Pg.231]

Figure 9.21 considers the air movement in elevation the aerodynamic flow in plan is shown in Fig. 9.22. It can be appreciated that adjacent... Figure 9.21 considers the air movement in elevation the aerodynamic flow in plan is shown in Fig. 9.22. It can be appreciated that adjacent...
Figure 9.8 Planar network formed by extended 2D condensation of rings of 6 8104 tetrahedra to give 1205 ". (a) Plan as seen looking down the O- Si direction, and (b) side elevation. Figure 9.8 Planar network formed by extended 2D condensation of rings of 6 8104 tetrahedra to give 1205 ". (a) Plan as seen looking down the O- Si direction, and (b) side elevation.
Figure 1-14. Typical process area plot plan and study elevations. By permission, Fluor Corp. Ltd. Figure 1-14. Typical process area plot plan and study elevations. By permission, Fluor Corp. Ltd.
Figure 9-6T. (Top) Cascade Mini-Ring, (metal and plastic). Originally used by permission of Mass Transfer, Inc., now, Glitsch, Inc. (middle and bottom) Elevation and plan views of Ballast rings (right) and Cascade Mini-Rings (left). Note how high aspect ratio of former permits occlusion of interior surfaces. Low aspect ratio of Cascade Mini-Rings, on the other hand, favors orientation that exposes internal surfaces for excellent film formation, intimate mixing, and gas-liquid contact. Used by permission of Glitsch, Inc. Bull. 345. Figure 9-6T. (Top) Cascade Mini-Ring, (metal and plastic). Originally used by permission of Mass Transfer, Inc., now, Glitsch, Inc. (middle and bottom) Elevation and plan views of Ballast rings (right) and Cascade Mini-Rings (left). Note how high aspect ratio of former permits occlusion of interior surfaces. Low aspect ratio of Cascade Mini-Rings, on the other hand, favors orientation that exposes internal surfaces for excellent film formation, intimate mixing, and gas-liquid contact. Used by permission of Glitsch, Inc. Bull. 345.
Scheme, site plan, layouts and elevations including infrastructure modifications ... [Pg.51]

The planning of elevator systems should be one of the first to be considered, usually alongside the initial building... [Pg.59]


See other pages where Elevators planning is mentioned: [Pg.177]    [Pg.5]    [Pg.100]    [Pg.183]    [Pg.188]    [Pg.100]    [Pg.177]    [Pg.5]    [Pg.100]    [Pg.183]    [Pg.188]    [Pg.100]    [Pg.547]    [Pg.441]    [Pg.74]    [Pg.75]    [Pg.76]    [Pg.558]    [Pg.558]    [Pg.871]    [Pg.1169]    [Pg.1648]    [Pg.2406]    [Pg.98]    [Pg.222]    [Pg.71]    [Pg.97]    [Pg.359]    [Pg.350]    [Pg.191]    [Pg.594]    [Pg.41]   