Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Critical instrument systems proof testing

The integrity of safety instrumented systems is usually dependent on proof testing at specified intervals (often at a frequency between monthly and three-monthly). Safety management systemst2jsafety critical operating procedures such as described in (c) above are adhered to. [Pg.118]

Class 1 safety instrumentation loops include alarms and trips on storage tanks containing flammable or toxic liquids, devices to control high temperature and high pressure on exothermic-reaction vessels, and control mechanisms for low-flow, high-temperature fluids on fired heaters. Other Class 1 instruments include alarms that warn of flame failure on fired heaters, and vapor detectors for emergency valve isolation and sprinkler-system activation. All of these alarms, shutdown valves, and other critical instruments are regularly proof-tested to a well-defined schedule. [Pg.270]

The safety instrumented systems (SIS) and critical alarms assigned a Class 1 include those that have been mandated as such by state or federal agencies an in-house technical safety review committee HAZOP studies and specific alarms deemed critical by operations supervisors. All of these SIS and alarms are on a regular proof testing schedule. [Pg.345]


See other pages where Critical instrument systems proof testing is mentioned: [Pg.943]   
See also in sourсe #XX -- [ Pg.24 , Pg.239 , Pg.240 , Pg.241 , Pg.242 , Pg.245 ]




SEARCH



Critical instrument systems

Critical instruments

Critical instruments testing

Criticality Instrumentation

Proof testing

Proof tests

Proofing

Proofing Testing

System testing

Test instruments

Test systems

© 2024 chempedia.info