Develop timetable for shutdown The management team should establish a macro-level schedule for the outage. Without complete planning, a definitive timeline can not be established, but the team should establish specific milestones that must be met. [Pg.820]

While this detailed schedule or timeline is essential, it does not replace or eliminate the need for complete planning of each task or a comprehensive work order package. [Pg.828]

The correctness of complete plans is encapsulated by the following theorem (Chapman, 1985). [Pg.57]

Theorem 1 (Truth Criterion of Complete Plans). In a complete plan, a proposition, p, is necessarily true in a situation, s, if and only if there exists a situation, t, previous or equal to s in which p is asserted, and there is no step between t and s that denies p. [Pg.57]

For STRIPS-like operators. Chapman (1985) developed a polynomialtime algorithm, called TWEAK, around five actions that are necessary and sufficient for constructing a correct and complete plan. As soon as we try to extend these ideas to nonmonotonic planning with conditional operators, we realize that no polynomial-time algorithm can be constructed, as the following theorem explicitly prohibits (Chapman, 1985) ... [Pg.58]

In this section we will offer several illustrations of the various aspects of nonmonotonic operations planning (discussed in earlier sections) including the following (1) development of hierarchical models for the process and its operations, (2) conversion of constraints to temporal orderings of primitive operations, and (3) synthesis of complete plans. [Pg.72]

This is a complete plan for a protein sample separation Optimization criterion Purity... [Pg.303]

Even a random search has to start somewhere. At the beginning, there should be a plan on what territories to cover and how to cover them. The plan can be deterministic, which is completely planned out in advance and executed accordingly. The plan can also be adaptive after the arrival of each batch of results and preliminary evaluations, the plan would evolve to take advantage of the new information and understanding gained. [Pg.229]

The term protocol is usually applied to a set of procedures, covering sampling and sample preparation through to reporting the analytical results. The protocol is therefore a complete plan for conducting an analysis (see also Section 2.2),... [Pg.63]

The detailed-t eoff method can rarely if ever be used. When detailed drawings are available, costs may be estimated by pricing materials and components from suppliers catalogs or, for special items, from quotations. Handbooks are available which give typical values of the labor-hours required to perform units of installation work, such as installation of switches, starters, motors, conduit wiring, and push buttons of various sizes, for both hazardous and nonhaz-ardous areas. Labor rates can be obtained from various government statistical sources or elsewhere. For the United States the National Electrical Contractors Association publishes an excellent manual of electrical costs. From the complete plans and specifications, the estimator can take off materials, estimate the labor cost, apply appropriate factors for labor efficiency, productivity, and local conditions, and achieve good results. [Pg.696]

For this case of second order complete plan, the specificity of the matrix of the coefficients results in an assembly of relations directly giving the regression values of the coefficients. In this example, where the complete second order plan is based on a 2 CFE, these relations are written as follows ... [Pg.397]

By the year 336 b.c., Philip of Macedon had subdued the bickering city-states of Greece and welded them into an impressive fighting force. He had also completed plans to invade Asia Minor in order to take on the forces of the mighty Persian Empire. In the summer of 336 B.C., Philip was murdered and succeeded by his son Alexander, who went on with the project. [Pg.128]

An agreed-upon condition on the completion date is an important project decision that should be made prior to award of construction contracts and should be made a written part of them. In the past, this was called mechanical completion, which was generally meant that all equipment was tested and ran in a mechanically approved manner and proper tests had been conducted to confirm tightness and pressure rating of system. Only necessary material for testing the system would be introduced. Today the requirements for cleanliness and proofing of tests as part of validation require that the definition of condition for turnover to start-up must be developed in much more detail. The questions to be asked when developing the completion plan are ... [Pg.768]

Lamifiban PARADIGM PARADIGM 11 Phase II Phase III Completed Planned [127], [168] [168]... [Pg.77]

The surface area immediately above the underground workings was surveyed and contoured at five-foot intervals and plans prepared showing the correlation between surface and underground areas. The completed plans were passed to the War Office Tunnel Quarry Committee who were to decide upon the layout of the storage areas. [Pg.21]

It is for these reasons that all companies should possess a quality manual which contains the formal policy on company quality. This should be produced by the quality department but have chief executive authorisation. Specific quality procedures should be included in a quality plan, which can be presented as either one complete plan containing a sub-chapter for individual components/component ranges, or a separate plan for each and every individual component/component range. [Pg.95]

It will save a step if we reduce both the acid and the ketone together at the end. The complete plan is now ... [Pg.64]


See other pages where Complete plan is mentioned: [Pg.872]    [Pg.81]    [Pg.181]    [Pg.72]    [Pg.88]    [Pg.247]    [Pg.252]    [Pg.196]    [Pg.81]    [Pg.395]    [Pg.568]    [Pg.81]    [Pg.256]    [Pg.72]    [Pg.230]    [Pg.138]    [Pg.458]    [Pg.2323]    [Pg.84]    [Pg.58]    [Pg.74]    [Pg.21]    [Pg.89]   


SEARCH



© 2024 chempedia.info